Photo taken of Arcadia Public Library, 20 W. Duarte Road, during the 1995/96 expansion/remodel project. This view is of the temporary reference desk, located near the fireplace in the south end of the library. A sign identifying the desk as an "Information Desk" is visible to the left.
Photo taken of Arcadia Public Library, 20 W. Duarte Road, during the 1995/96 expansion/remodel project. This view is looking toward the new front entrance. The entranceway pillars are partially constructed. The old entrance is visible to the right.
Photo taken of Arcadia Public Library, 20 W. Duarte Road, during the 1995/96 expansion/remodel project. This interior view looks toward the new reference desk. Several ladders are visible. No shelving has yet been installed.
Photo taken of Arcadia Public Library, 20 W. Duarte Road, during the 1995/96 expansion/remodel project. This view is of the outside looking toward the three windows which face the front parking lot area. The trellis and pillars are under construction.
Taken at the time of the Library groundbreaking ceremonies for the Arcadia Public Library remodel/expansion project, this photo is of the color rendering of the proposed new facade for the library. See also photos 1356 and 1357 for color renderings of proposed library building.
Photo taken of Arcadia Public Library, 20 W. Duarte Road, during the 1995/96 expansion/remodel project. This view is of the reference office. Cabinets have been installed along the south wall. The ceiling and east wall are not completed. Two people are standing in the room and one more person is visible in the hallway.
Photo taken of Arcadia Public Library, 20 W. Duarte Road, during the 1995/96 expansion/remodel project. This view is of the interior of the newly constructed adult area. A pickup truck is parked outside the emergency exit located in the northeast corner of the room. Brown paper has been placed over sections of the new carpet.
Photo taken of Arcadia Public Library, 20 W. Duarte Road, during the 1995/96 expansion/remodel project. This view is of the temporary adult reading area, looking toward the temporary circulation desk and temporary front entrance. In the center of the photo, a drainage pipe is surrounded by chairs and booktrucks. This pipe was installed to help drain rain from the roof. The carpet in this area was removed because of extensive water damage. Globe lights.
Groundbreaking ceremonies for the remodel/expansion project at Arcadia Public Library, 20 W. Duarte Road. This photo shows a number of people standing under the white tent.
Groundbreaking ceremonies for the remodel/expansion project at Arcadia Public Library, 20 W. Duarte Road. Mayor Dennis Lojeski is standing at a podium addressing the audience. Library Foundation members are seen in the front row.
Children seated at a table in the Children's Room at Arcadia Public Library, 20 W. Duarte Road. This was taken shortly before remodel/expansion project. The children are all children of staff members.
Children seated at a table in the Children's Room at Arcadia Public Library, 20 W. Duarte Road. This was taken shortly before remodel/expansion project. The children are all children of staff members.
Children seated at a table in the Children's Room at Arcadia Public Library, 20 W. Duarte Road. This was taken shortly before remodel/expansion project. The children are all children of staff members.
Children seated at a table in the Children's Room at Arcadia Public Library, 20 W. Duarte Road. This was taken shortly before remodel/expansion project. The children are all children of staff members.