Skip header and navigation

4 records – page 1 of 1.

Arcadia police arrested 3 burglary suspects after a high-speed chase on the 210 Freeway ended in a crash in Azusa yesterday. The suspects are Dominic Bertirotti, 23, of Monrovia, Salim Alayache, 23 of Pasadena and Salvador Esparza, Jr., 18 of Azusa. No one was injured seriously.

https://arcadiahistory.andornot.com/en/permalink/newspaper32619
Newspaper
Pasadena Star News,
Date
October 26, 2011
Pages
p. A3
Newspaper
Pasadena Star News,
Date
October 26, 2011
Pages
p. A3
Subjects
Ayalache, Salim
Bertirotti, Dominic
Crime and Criminals
Esparza, Salvador
Police car chases
Item ID
32817AN
Collection
Newspaper Index
Less detail

Michael De Pietro, 8 years old, was injured when he was struck by a car driven by Earl Hummell of Glendora, in the crosswalk at Huntington Drive and Baldwin Avenue. See hard copy of newspaper in Box 51.

https://arcadiahistory.andornot.com/en/permalink/newspaper33955
Newspaper
Arcadia Tribune,
Date
February 2, 1964
Pages
p. 1
Newspaper
Arcadia Tribune,
Date
February 2, 1964
Pages
p. 1
Subjects
DePietro, Michael
Hummell, Earl
Item ID
34149AN
Collection
Newspaper Index
Less detail

A $600,000 grant from the Azusa-based San Gabriel and Lower Los Angeles Rivers and Mountain Conservancy, plus $200,000 of in-kind amenities provided by the County Department of Parks and Recreation, will help fund a face lift for Peck Road Park at 5401 Peck Road.

https://arcadiahistory.andornot.com/en/permalink/newspaper32536
Newspaper
Pasadena Star News,
Date
September 17, 2011
Pages
p. A3
Newspaper
Pasadena Star News,
Date
September 17, 2011
Pages
p. A3
Subjects
Parks
Peck Road Water Conservation Park
Item ID
32735AN
Collection
Newspaper Index
Less detail

A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper32557
Newspaper
Pasadena Star News,
Date
October 4, 2011
Pages
p. A3