Skip header and navigation

2 records – page 1 of 1.

Construction is stalled on a $11.9 million project to build sound walls on a stretch of the westbound 210 Foothill Freeway, between Baldwin Avenue and Rosemead Boulevard, but work is expected to resume soon. The delay is due to inaccurate design plans that are being modified.

https://arcadiahistory.andornot.com/en/permalink/newspaper31066
Newspaper
Pasadena Star News
Date
June 28, 2008
Pages
p. A1
Newspaper
Pasadena Star News
Date
June 28, 2008
Pages
p. A1
Subjects
210 Foothill Freeway
Acoustics
Caltrans
Noise
Sound Walls
Item ID
31261AN
Collection
Newspaper Index
Less detail

The state Department of Education has revised its Academic Performance Index rankings. Arcadia Unified School District revisions were: Baldwin Stocker Elementary from 4 to 7; Highland Oaks Elementary from 7 to 8; and Holly Avenue Elementary from 8 to 7.

https://arcadiahistory.andornot.com/en/permalink/newspaper25196
Newspaper
Pasadena Star News
Date
February 22, 2003
Pages
p. A3