Skip header and navigation

2 records – page 1 of 1.

A proposed 739-feet bridge to span the eastbound 210 freeway diagonally from Santa Anita Avenue may become a landmark gateway sign welcoming people to the San Gabriel Valley. If Measure R funding comes through for this project, construction could begin in Fall 2010. Artists are being asked to submit proposals for the bridge design by the end of next month. Total cost of the bridge is estimated at $20 million and selected artists will receive a $20,000 budget to design the bridge.

https://arcadiahistory.andornot.com/en/permalink/newspaper31421
Newspaper
Pasadena Star News
Date
March 28, 2009
Pages
p. A1
Newspaper
Pasadena Star News
Date
March 28, 2009
Pages
p. A1
Subjects
Artists
Bridges (proposed)
Landmarks
Metro Gold Line Foothill Extension
Item ID
31614AN
Collection
Newspaper Index
Less detail

The 11.5 mile light rail Gold Line extension from Pasadena to Azusa was awarded to Foothill Transit Constructors. Kiewit-Parsons, a joint venture company, will design and build the project. Funding comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper32468
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Subjects
Contractors
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32667AN
Collection
Newspaper Index
Less detail