Aerial view looking north across Santa Anita Park from a position over Arcadia County Park. Large infield crowd is evident and all parking areas are filled. Arcadia Methodist Hospital shows in lower left part of photo and Arcadia Police facility is seen in lower right. The 210 Foothill Freeway cuts across photo near the top.
Looking west toward east side of Methodist Hospital of Southern California which opened in May of 1957 at 300 W. Huntington Drive. Photo was taken shortly after completion.
Man standing at dispatcher window in the Arcadia Police station at First Avenue and Wheeler Street. Door with telephone sign above it, First Aid sign on wall and cigarette machine near counter.
Policeman sitting in chair talking on telephone at switchboard in Arcadia Police Station at First Avenue and Wheeler Street. Can also see typewriters, switchboard, books, lamp, radio, microphone, keys and desk. Water fountain and gum machines on wall.
View of front door of one-story Arcadia Police Department building at 250 W. Huntington Drive. The building has a flat roof. Man in suit stands inside the front door. Parking lot of the Santa Anita Racetrack in background.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. There is a man in an open trench and other workers around.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. It seems to be a view of the door / bars of a jail cell.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Welder wearing goggles, on a ladder, is working on the bars of a jail cell.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Man is working on the ceiling. Santa Anita Park Racetrack is visible in the left-hand background.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Crane, pulleys and at least six workers are shown.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Crane and pulley system help put up a wall while workers stand around. Name of company on the crane reads Heisler & Woods, Contractors, Crane Service, El Monte, CA. The name is clearer in photo #1825.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Workers join a pillar-like piece to the foundation with nuts and bolts. It could be an antenna tower. Man in hat is smoking a pipe.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Workers pour cement into foundation. Two men carry shovels.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Crane, pulley, and workers put up frame of the building.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Workers are pouring cement. Cement mixing truck is seen.