Skip header and navigation

2 records – page 1 of 1.

Arcadia Methodist Hospital's new wing, a $140 million, 184-bed tower, that opened last month, largely replaces 2 hospital buildings built in 1957 and 1967. This new building helps as Arcadia Methodist Hospital (AMH) plans to address the risks of buildings collapsing during an earthquake. Joe La Brie, a structural engineer said AMH has addressed utility line hazards. Acute services are being relocated to the new tower. See related story about earthquake preparedness at other hospitals in the San Gabriel Valley (see same page).

https://arcadiahistory.andornot.com/en/permalink/newspaper32623
Newspaper
Pasadena Star News,
Date
October 30, 2011
Pages
p. A7
Newspaper
Pasadena Star News,
Date
October 30, 2011
Pages
p. A7
Subjects
Arcadia Methodist Hospital (AMH)
Hospital buildings
Seismic safety and seismic regulations
Item ID
32821AN
Collection
Newspaper Index
Less detail

A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper32557
Newspaper
Pasadena Star News,
Date
October 4, 2011
Pages
p. A3