Looking north toward San Gabriel Mountains at devastating Monrovia Peak fire on first night. It was to eventually burn more than 13,000 acres and be out of control for five days.
Group of youngsters, some wearing firemen's gear, in front of Fire Station at 50 Wheeler St. apparently on a tour of the facilities. The following is information from Dave Haney, Battalion Chief/Training Officer of the Arcadia Fire Department at 630 S. Baldwin, provided via email on November 18, 2007 : "The pumper in this photo was called 'Squad,' and was a Class B pumper, which means the fire pump is much smaller than the ones we have today (2007). It is a Mack with a 750 gallon per minute fire pump and a 400 gallon water tank. It ran as Engine 1 out of the Wheeler Station. When Wheeler Station closed, it was moved over to the Santa Anita Fire Station until she was retired. So far there has been some confusion over the year of manufacture of the pumper. Some old timers tell me either a 1943, 1944, or 1947."
Photographic reproduction of original artist's rendering of proposed Arcadia Public Library remodel/expansion. Original rendering measures approx. 32"x36". The artist was Anthony Van Strauhal, also known as Tony Van Strauhal. This view is of proposed new addition to adult area and shows red tile roof that was not budgeted by City Council. Exterior view.
Fire station across which is painted ENGINE #2. Parked in front is one fire truck with 2 firemen. Standing to left of engine are 3 firemen. Car parked at rear of station appears to be late 1930's model. Address 1420 S. Baldwin Avenue.
Photo taken of Arcadia Public Library, 20 W. Duarte Road, during the 1995/96 expansion/remodel project. This view is of the reference office. Cabinets have been installed along the south wall. The ceiling and east wall are not completed. Two people are standing in the room and one more person is visible in the hallway.
Phase I of Library Renovation/Expansion Project at 20 W. Duarte Road. This photograph was taken after all the books had been moved into the new remodeled section. The circulation desk is visible to the far left. The drainage pipe is on the right. Globe lights.
Phase I of Library Renovation/Expansion Project at 20 W. Duarte Road. This photograph was taken of the adult reading room after all the books had been removed and moved into the renovated section. The drainage pipe is visible in the center of the photo. A floor plant is next to a pillar. Globe lights.
Elias J. "Lucky" Baldwin standing on porch of Hugo Reid Adobe holding hand of granddaughter Dextra Baldwin, who appears to be about 5 years old. Grandson Baldwin M. Baldwin is in wicker baby carriage and is about 1 1/2 or 2 years old.
Groundbreaking ceremonies for the remodel/expansion project at Arcadia Public Library, 20 W. Duarte Road. This photo shows four council members holding a shovel, standing in front of a large sign announcing the remodel. L-R: Sheng Chang, Mary Young, Dennis Lojeski, Barbara Kuhn.
Groundbreaking ceremonies for the remodel/expansion project at Arcadia Public Library, 20 W. Duarte Road. This photo shows four council members and City Clerk June Alford holding a shovel and standing in front of a large sign announcing the remodel. L-R: Sheng Chang, Mary Young, Mayor Dennis Lojeski, Barbara Kuhn and June Alford.
Temporary circulation desk during Phase I of Library Renovation/Expansion at 20 W. Duarte Road. This circulation desk was located in the NW corner of what used to be the Children's Room. The window to the left looks out into what used to be the Children's Room patio. Globe lights.
Phase I of Library Renovation/Expansion project at 20 W. Duarte Road. This view shows drainage pipe used to drain water from roof during the rains of winter 1996. The book trucks covered the pipe, which ran all the way out the temporary front doors into what used to be the Children's Room patio. The area behind the book trucks was the sorting area. A young woman is standing looking at books shelved along the plywood wall. To the right are the photocopy machines.
Phase I of Arcadia Public Library Renovation/Expansion Project at 20 W. Duarte Road. Trash cans turned upside down straddled the drainage pipe which was installed to drain water off the roof. This photo is taken from what used to be the Children's Room patio, looking toward the temporary front doors. The Friends of the Library 25cent booksale bookshelf is visible in the center of the photo. A television seen to the right played a fundraising video.
Phase I of Arcadia Public Library Renovation/Expansion Project at 20 W. Duarte Road. This photo was taken in what used to be the Art & Lecture Room and was the temporary location for the Children's Room. Door to the left led into the adult area, with temporary circulation desk to the right. The stage curtains are visible on the right.
Phase I of Arcadia Public Library Renovation/Expansion Project at 20 W. Duarte Road. This photo was taken in what used to be the Art & Lecture Room. The temporary Children's Room reference desk is visible just to the right of the center of the photo. A caroussel for videos is seen on the right. No one is seen in the photo.
Phase I of Arcadia Public Library Renovation/Expansion Project at 20 W. Duarte Road. This photo was taken in what used to be the Art & Lecture Room. Stacks of childrens' books are visible. Photo was probably taken from the stage area.