Skip header and navigation

3 records – page 1 of 1.

Foothill Gold Line construction update. The Gold Line light rail from Pasadena to Azusa has now surpassed 85% complete. Overview of bridge construction, track completion, grade crossings, and train testing. Substantial completion of entire project remains on schedule for late September 2015, when the project as a whole will be turned over to Metro for pre-revenue service. Metro will decide when the line will open for passenger service.

https://arcadiahistory.andornot.com/en/permalink/newspaper34152
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
34346AN
Collection
Newspaper Index
Less detail

Metro to improve 210 Freeway barriers, after a series of crashes over the last 2 years involved cars and trucks landing on the Gold Line tracks. Metro plans to install taller, stronger barriers and a detection system on 6 miles of right-of-way down the middle of the 210 Freeway in Pasadena and Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper35243
Newspaper
Mountain Views News
Date
July 28, 2018
Pages
p. 5
Newspaper
Mountain Views News
Date
July 28, 2018
Pages
p. 5
Subjects
210 Foothill Freeway
Light rail trains
Metro Gold Line
Railroads
Transportation
Item ID
35432AN
Collection
Newspaper Index
Less detail

A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper32557
Newspaper
Pasadena Star News,
Date
October 4, 2011
Pages
p. A3