Skip header and navigation

2 records – page 1 of 1.

Construction of the Metro Gold Line Foothill Extension bridge, that will span the 210 Freeway, has begun. Preparation of the giant column supports included drilling over 100 feet into the ground. The 584-foot Gold Line bridge will take shape by December. It replaces an old railroad bridge across the freeway, which was built about 1969 and torn down in 1997, said Gary Baker, director of construction for the Metro Gold Line Foothill Extension Construction Authority. The bridge's design has been controversial, as some say it is not representative of the origins of the area. The entire bridge is slated to be finished summer 2012.

https://arcadiahistory.andornot.com/en/permalink/newspaper32566
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
32765AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension Construction Authority announced that structural work is complete for Gold Line Bridge over Interstate 210 Freeway. "The bridge can now stand on its own," said Construction Authority CEO Habib F. Balian. The bridge is a 584-linear foot, $18.6 million rail bridge that helps extend the Gold Line from Pasadena to Azusa, in this first segment.

https://arcadiahistory.andornot.com/en/permalink/newspaper33151
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Subjects
Balian, Habib
Bridges
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
33348AN
Collection
Newspaper Index
Less detail