Skip header and navigation

3 records – page 1 of 1.

2,100 cubic yards of concrete has been poured now and the 584-foot Gold Line Bridge is taking shape inside the wood forms above the eastbound lanes of the 210 Freeway.

https://arcadiahistory.andornot.com/en/permalink/newspaper33073
Newspaper
Pasadena Star News
Date
June 20, 2012
Pages
p. A3

The Metro Gold Line Foothill Extension Construction Authority Board of Directors adopts new policies to enhance agency's transparency and accountability.

https://arcadiahistory.andornot.com/en/permalink/newspaper32643
Newspaper
Arcadia Weekly,
Date
November 24, 2011
Pages
p. 6
Newspaper
Arcadia Weekly,
Date
November 24, 2011
Pages
p. 6
Subjects
Metro Gold Line Foothill Extension Construction Authority--policies
Item ID
32840AN
Collection
Newspaper Index
Less detail

A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper32557
Newspaper
Pasadena Star News,
Date
October 4, 2011
Pages
p. A3