Five police cars and one motorcycle parked alongside Police Headquarters on Wheeler Street. Two are Fords for sure but others are uncertain. There is also one motorcycle parked with autos.
View looking east over area where Police vehicles are parked at Police Facilities. Shown are four squad cars and two motorcycles. Five policemen are in view. Note Bekins building in background.
Police Department building recently completed in Civic Center complex. View is west, across parking lot of Santa Anita Racetrack. Building just to the left of Police Facilities, is the National Guard Armory.
View of front door of one-story Arcadia Police Department building at 250 W. Huntington Drive. The building has a flat roof. Man in suit stands inside the front door. Parking lot of the Santa Anita Racetrack in background.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. There is a man in an open trench and other workers around.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Man is working on the ceiling. Santa Anita Park Racetrack is visible in the left-hand background.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Crane, pulleys and at least six workers are shown.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Workers join a pillar-like piece to the foundation with nuts and bolts. It could be an antenna tower. Man in hat is smoking a pipe.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Workers pour cement into foundation. Two men carry shovels.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Crane, pulley, and workers put up frame of the building.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Workers are pouring concrete or cement with a funnel into the foundation. Four men shown.
Construction in progress of the foundation of the one-story Arcadia Police Department building at 250 W. Huntington Drive. There are mounds of dirt and a parked car. The Santa Anita Park Racetrack grandstand is visible in the background.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Truck is unloading materials while workers look on. "Osborn Co. Grading - Paving, Pasadena" is the name on the truck.
Construction in progress of the one-story Arcadia Police Department building at 250 W. Huntington Drive. Workers are pouring concrete or cement with a funnel into the foundation. Seven men shown. Cars and trucks from the 1950s era are parked along the construction site.