The state Department of Education has revised its Academic Performance Index rankings. Arcadia Unified School District revisions were: Baldwin Stocker Elementary from 4 to 7; Highland Oaks Elementary from 7 to 8; and Holly Avenue Elementary from 8 to 7.
Construction is stalled on a $11.9 million project to build sound walls on a stretch of the westbound 210 Foothill Freeway, between Baldwin Avenue and Rosemead Boulevard, but work is expected to resume soon. The delay is due to inaccurate design plans that are being modified.