Construction is stalled on a $11.9 million project to build sound walls on a stretch of the westbound 210 Foothill Freeway, between Baldwin Avenue and Rosemead Boulevard, but work is expected to resume soon. The delay is due to inaccurate design plans that are being modified.
Aerial view looking east across Santa Anita Park taken from a position just west of Baldwin Avenue, which is seen at bottom of photo. Huntington Drive appears exactly in center of photo just east of race track. The 210 Foothill Freeway enters area in upper right portion of picture and exits at left side in upper left portion.