Construction is stalled on a $11.9 million project to build sound walls on a stretch of the westbound 210 Foothill Freeway, between Baldwin Avenue and Rosemead Boulevard, but work is expected to resume soon. The delay is due to inaccurate design plans that are being modified.
2004 Graduation ceremony will be held on June 11 at 4:30 pm at Santa Anita Park Park race track. An estimated 850 students will graduate. The article also lists graduation ceremony information for other local schools.
About 1000 feet of sound walls will be built by the westbound lanes of the 210 Foothill Freeway between Second Avenue and Fifth Avenue. There is also discussion of future sound wall construction projects.