Construction is stalled on a $11.9 million project to build sound walls on a stretch of the westbound 210 Foothill Freeway, between Baldwin Avenue and Rosemead Boulevard, but work is expected to resume soon. The delay is due to inaccurate design plans that are being modified.
Aerial view north toward San Gabriel Mountains from a position above Huntington Drive near First Avenue. Santa Anita Avenue can plainly be seen running north and south in front of six-story building in center of photo. The 210 Foothill Freeway is top band running across photo from east to west.
About 1000 feet of sound walls will be built by the westbound lanes of the 210 Foothill Freeway between Second Avenue and Fifth Avenue. There is also discussion of future sound wall construction projects.