About 1000 feet of sound walls will be built by the westbound lanes of the 210 Foothill Freeway between Second Avenue and Fifth Avenue. There is also discussion of future sound wall construction projects.
Construction is stalled on a $11.9 million project to build sound walls on a stretch of the westbound 210 Foothill Freeway, between Baldwin Avenue and Rosemead Boulevard, but work is expected to resume soon. The delay is due to inaccurate design plans that are being modified.
Aerial view toward the east from location about over Santa Anita Avenue at Santa Clara Street intersection. Santa Fe Railroad tracks are seen entering the city about in the center of photo. Broad white roadway seen toward left side of photo is 210 or Foothill Freeway still under construction.