Southern California Edison (SCE) workers continued their round-the-clock efforts to restore the San Gabriel Valley's power grid following the extensive damage that occurred during early Thursday's windstorm. The hardest hit customer areas were Arcadia, Altadena, Covina, Duarte, El Monte, Montebello, Monrovia, Rosemead, San Gabriel and Temple City. About 135,000 SCE customers remained without electricity.
A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.