About 1000 feet of sound walls will be built by the westbound lanes of the 210 Foothill Freeway between Second Avenue and Fifth Avenue. There is also discussion of future sound wall construction projects.
California Horse Racing Board (CHRB) rebuffs Santa Anita Park, gives Pleasonton thumbs up. Tensions had risen when Craig Fravel, executive vice chairman of 1/ST Racing, which runs Santa Anita Park for the Stronach Group, said in a letter to CHRB members that the Arcadia track might close if Southern California interests don't receive more simulcast wagering revenue, which would have happened if Northern California was denied a major meet.
Construction is stalled on a $11.9 million project to build sound walls on a stretch of the westbound 210 Foothill Freeway, between Baldwin Avenue and Rosemead Boulevard, but work is expected to resume soon. The delay is due to inaccurate design plans that are being modified.
Metro to improve 210 Freeway barriers, after a series of crashes over the last 2 years involved cars and trucks landing on the Gold Line tracks. Metro plans to install taller, stronger barriers and a detection system on 6 miles of right-of-way down the middle of the 210 Freeway in Pasadena and Arcadia.