About 1000 feet of sound walls will be built by the westbound lanes of the 210 Foothill Freeway between Second Avenue and Fifth Avenue. There is also discussion of future sound wall construction projects.
The City Council has decided to spend about $100,000 for vines on the 4.5 miles of sound walls the Metropolitan Transportation Authority will build along the 210 Freeway in 2004-2005.
Construction is stalled on a $11.9 million project to build sound walls on a stretch of the westbound 210 Foothill Freeway, between Baldwin Avenue and Rosemead Boulevard, but work is expected to resume soon. The delay is due to inaccurate design plans that are being modified.
Freeway sound walls promised for Arcadia and Monrovia appear to be still on schedule, according to the Metropolitan Transit Authority (MTA). The sound walls scheduled for construction as early as 2005 run from Michillinda Avenue to Santa Anita Avenue in Arcadia, and from Huntington Drive to California Avenue in Monrovia. Lower priority sound wall project locations are also given.