2,100 cubic yards of concrete has been poured now and the 584-foot Gold Line Bridge is taking shape inside the wood forms above the eastbound lanes of the 210 Freeway.
Construction of the Metro Gold Line Foothill Extension bridge, that will span the 210 Freeway, has begun. Preparation of the giant column supports included drilling over 100 feet into the ground. The 584-foot Gold Line bridge will take shape by December. It replaces an old railroad bridge across the freeway, which was built about 1969 and torn down in 1997, said Gary Baker, director of construction for the Metro Gold Line Foothill Extension Construction Authority. The bridge's design has been controversial, as some say it is not representative of the origins of the area. The entire bridge is slated to be finished summer 2012.
Metro Gold Line Foothill Extension Construction Authority announced that structural work is complete for Gold Line Bridge over Interstate 210 Freeway. "The bridge can now stand on its own," said Construction Authority CEO Habib F. Balian. The bridge is a 584-linear foot, $18.6 million rail bridge that helps extend the Gold Line from Pasadena to Azusa, in this first segment.
A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.