Skip header and navigation

20 records – page 1 of 1.

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

Testing of Gold Line light rail cars began on Monday. It passed over the newly built bridge on Santa Anita Avenue in Arcadia. See also Arcadia Weekly, p. 1, 17, December 11, 2014.

https://arcadiahistory.andornot.com/en/permalink/newspaper34039
Newspaper
Pasadena Star News
Date
December 9, 2014
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
December 9, 2014
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34233AN
Collection
Newspaper Index
Less detail

Yesterday Arcadia city officials celebrated the groundbreaking of a nearly $12.5 million Gold Line bridge that will be built over Santa Anita Avenue, south of Colorado Boulevard. Starting on or near May 1, the new bridge's construction, which would take 7 months, will cause lane closures on Santa Anita Avenue, disruptions and detours, including not being able to enter In-N-Out Burger from Santa Anita Avenue for 4 months. The bridge is being paid for by a voter-approved bond measure and city transportation funds.

https://arcadiahistory.andornot.com/en/permalink/newspaper33478
Newspaper
Pasadena Star News
Date
April 13, 2013
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 13, 2013
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33673AN
Collection
Newspaper Index
Less detail

Colorado Boulevard between Santa Anita Avenue and San Antonio Road will be closed for nearly 5 months to allow crews to build a bridge needed for Metro Gold Line Foothill Extension. The Colorado Boulevard bridge is one of three Gold Line bridges to be built on Arcadia streets. The stretch of Colorado Boulevard will be closed 24 hours/day, 7 days/week until April 30.

https://arcadiahistory.andornot.com/en/permalink/newspaper33336
Newspaper
Pasadena Star News
Date
January 9, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 9, 2013
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33532AN
Collection
Newspaper Index
Less detail

During construction on the Gold Line's Santa Anita Avenue bridge, In-N-Out Burger customers will be asked to line up their cars on Colorado Boulevard, instead of Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper33368
Newspaper
Pasadena Star News
Date
February 5, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 5, 2013
Pages
p. A3
Subjects
Bridges
In-N-Out Burger
Light rail trains
Metro Gold Line Foothill Extension
Item ID
33564AN
Collection
Newspaper Index
Less detail

New Gold Line Bridge a wonderful gift. The design of the Foothill Basket Bridge was inspired by the indigenous Native American people and wildlife in San Gabriel Valley. The project created local jobs and the bridge was constructed by Skanska USA.

https://arcadiahistory.andornot.com/en/permalink/newspaper33277
Newspaper
Pasadena Star News
Date
December 19, 2012
Pages
p. A15
Newspaper
Pasadena Star News
Date
December 19, 2012
Pages
p. A15
Subjects
Bridges
Foothill Gold Line Bridge
Kurtz, Cynthia
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33474AN
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

Gold Line Bridge over the 210 Foothill Freeway is progressing and artist Andrew Leicester, creator of the woven Native American basket design, approves. The final details of the $18.6 million bridge, including lighting and landscaping, will be completed next month.

https://arcadiahistory.andornot.com/en/permalink/newspaper33261
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33458AN
Collection
Newspaper Index
Less detail

Gold Line construction extends closure of Colorado Boulevard for another three weeks, until the third week of May, due to underground utility work. See hard copy in VF Railroads-Light Rail-Gold Line.

https://arcadiahistory.andornot.com/en/permalink/newspaper33493
Newspaper
Pasadena Star News
Date
May 4, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
May 4, 2013
Pages
p. A3
Subjects
Bridges
Colorado Boulevard bridge
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33687AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

A team of designers and builders (photo) from Kiewit Parsons firm working on the Metro Gold Line Foothill Extension prepare to remove the existing railroad bridge on Colorado Boulevard between San Antonio Road and Santa Anita Avenue in Arcadia. That section of Colorado Boulevard may close today. The portion of Colorado Boulevard west of North Santa Anita Avenue, is scheduled to be closed from 7:00 AM to 5:00 PM weekdays through June 8, to remove the existing railroad bridge. Since the Colorado Boulevard bridge was once an old freight line bridge, it is not wide enough to accommodate light rail trains and tracks, and thus, will be demolished over the next 4 weeks.

https://arcadiahistory.andornot.com/en/permalink/newspaper32976
Newspaper
Pasadena Star News
Date
May 23, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
May 23, 2012
Pages
p. A3
Subjects
Bridges
Demolition
Kiewit Parsons
Metro Gold Line Foothill Extension
Item ID
33173AN
Collection
Newspaper Index
Less detail

Metro Gold Line Bridge, which represents woven baskets, over the 210 Foothill Freeway near Baldwin Avenue in Arcadia, gets its fifth award. The latest one was "Best Project in Southern California" for highways and bridges from Engineering News-Record, a national trade journal on construction and design. The award was presented to Habib Balian, CEO of Metro Gold Line Foothill Extension Construction Authority. Sharing in the award was AECOM, the lead architectural firm that implemented the concept from artist Andrew Leicester and Skanska USA, the construction contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper33698
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Subjects
Awards
Balian, Habib
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33894AN
Collection
Newspaper Index
Less detail

A Metro Gold Line deal to purchase land in Monrovia for a maintenance yard for $56 million, from George Brokate, a Marine veteran from Newport Beach, has been reached. This cleared the last major obstacle to the $735 million Pasadena to Azusa Metro Gold Line Foothill Extension. Photo shows the Gold Line bridge over the 210 Freeway in Arcadia under construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper32849
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Subjects
Brokate, George
Light Rail
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Trains
Transportation
Item ID
33046AN
Collection
Newspaper Index
Less detail

Lack of train cars may delay the openings of the Expo Line Phase 2 from Culver City to Santa Monica and the Gold Line Foothill Extension from Pasadena to Azusa. Metro reports delivery of rail cars won't be complete until January 2017, while construction of the extensions should be done July/August (Expo) and late September (Gold Line), of 2015. The builder of the train cars is Kinkisharyo International, a Japanese company that is assembling the light rail trains in Palmdale, California. The Expo Line needs 42 cars and the Gold Line needs 15.

https://arcadiahistory.andornot.com/en/permalink/newspaper34025
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Subjects
Balian, Habib
Kinkisharyo International
Light rail trains
Metro Gold Line Foothill Extension
Item ID
34219AN
Collection
Newspaper Index
Less detail

Gold Line bridge work to cause more closures. The construction remains on schedule and will require as many as 20 late-night full eastbound lane closures in the next two months. The final abutment, or end of the bridge, will be poured next week. The full lane closures generally occur from midnight to 5:00 AM, during which traffic will be detoured off the 210 Freeway at Baldwin Avenue and routed along Foothill Boulevard to Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32809
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Item ID
33006AN
Collection
Newspaper Index
Less detail

2,100 cubic yards of concrete has been poured now and the 584-foot Gold Line Bridge is taking shape inside the wood forms above the eastbound lanes of the 210 Freeway.

https://arcadiahistory.andornot.com/en/permalink/newspaper33073
Newspaper
Pasadena Star News
Date
June 20, 2012
Pages
p. A3

The Metro Gold Line Foothill Extension Construction Authority opened bidding yesterday on Phase 2A of the light rail's extension toward Azusa, which would make a stop in Arcadia. The project is estimated to cost more than $450 million with a completion date in 2017. Measure R guarantees full funding for the Gold Line Extension minus a gap of $500,000. With possible help from a private investment, the completion could be moved up to 2013.

https://arcadiahistory.andornot.com/en/permalink/newspaper32161
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32358AN
Collection
Newspaper Index
Less detail

Metro Foothill Gold Line crossing gates snarl traffic. Faulty part that was recalled worldwide blamed for malfunctions. There are 14 at-grade crossings throughout the 5 cities along the new extension: Arcadia, Monrovia, Duarte, Irwindale and Azusa (has two stations). Arcadia has only one at-grade crossing, but some cars were stuck at the crossing for 5 minutes or more. Each of the cities is working closely with Foothill Gold Line Construction Authority to synchronize traffic signals with train crossings to improve traffic flow.

https://arcadiahistory.andornot.com/en/permalink/newspaper34490
Newspaper
Pasadena Star News
Date
March 12, 2016
Pages
p. A1, A10
Newspaper
Pasadena Star News
Date
March 12, 2016
Pages
p. A1, A10
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Traffic
Transportation
Item ID
34682AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.