Skip header and navigation

20 records – page 1 of 1.

New bridge over 210 Freeway taking shape at Santa Anita Avenue offramp. Skanska USA is the lead bridge contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper32835
Newspaper
Arcadia Weekly
Date
February 16, 2012
Pages
p. 1, 4
Newspaper
Arcadia Weekly
Date
February 16, 2012
Pages
p. 1, 4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Skanska USA
Item ID
33032AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

Arcadia city is widening and improving three major downtown intersections, a $1 million project that has caused significant congestion in recent weeks. The work is taking place on Huntington Drive at intersections of Santa Anita Avenue, Santa Clara Avenue and Colorado Place. Sixty percent of the funding is by the City and forty percent by the Los Angeles County Metropolitan Transportation Authority. The city is also replacing an older sewer with a new larger one on Baldwin Avenue, northbound between Huntington Drive and Duarte Road, and will repave the road. Cost about $413,000.

https://arcadiahistory.andornot.com/en/permalink/newspaper33141
Newspaper
Pasadena Star News
Date
August 26, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
August 26, 2012
Pages
p. A3
Subjects
Street construction
Street repairs
Item ID
33338AN
Collection
Newspaper Index
Less detail

210 Freeway sound wall is finished. The Metro project, which started in 2009, consists of 2 miles of sound walls along westbound and eastbound lanes of the 210 Freeway between Santa Anita Avenue and California Avenue in Arcadia and Monrovia, paid with Measure R funds. The sound walls provide at least 5 decibels of noise reduction. A ribbon cutting ceremony was held. Several Arcadia residents near Victory Chapel on N. First Avenue, where the sound wall ends, are disappointed the barrier doesn't extend farther west.

https://arcadiahistory.andornot.com/en/permalink/newspaper33107
Newspaper
Pasadena Star News
Date
July 17, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
July 17, 2012
Pages
p. A3
Subjects
Los Angeles County Metropolitan Transportation Authority
Noise pollution
Sound Walls
Item ID
33304AN
Collection
Newspaper Index
Less detail

Gold Line bridge work to cause more closures. The construction remains on schedule and will require as many as 20 late-night full eastbound lane closures in the next two months. The final abutment, or end of the bridge, will be poured next week. The full lane closures generally occur from midnight to 5:00 AM, during which traffic will be detoured off the 210 Freeway at Baldwin Avenue and routed along Foothill Boulevard to Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32809
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Item ID
33006AN
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

Magna Entertainment Corp., owner of Santa Anita Park race track, which is in bankruptcy reorganization hearings, filed a plan that would cancel its 2005 agreement with Rick Caruso to develop the 830,000 square feet Shops at Santa Anita on the race track's south parking lot. Caruso filed an objection to the move in bankruptcy court, citing "substantial economic harm" to Santa Anita Associates, LLC, the legal entity that was going to develop the project. Santa Anita LLC has so far invested over $25 million to the project's development. Caruso is committed to developing the project in Arcadia. If the contract is indeed terminated between the parties, Magna would have to start from scratch with new plans, new environmental impact reports, and new hearings to propose another development.

https://arcadiahistory.andornot.com/en/permalink/newspaper31978
Newspaper
Pasadena Star News
Date
April 22, 2010
Pages
p. A1

Arcadia is sprucing up nicely. Phil Wray, Arcadia City Engineer, says the city has been making improvements to road medians. He is proud to share that, "We just finished our median island re-landscaping project from Michillinda to Baldwin." More drought-tolerant plants were planted on the median. The same re-landscaping will be done for the road median on Baldwin Avenue to Holly Avenue. Future projects include rehabilitation of pavement from Santa Clara Street to Fifth Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper35014
Newspaper
Arcadia Weekly
Date
November 23, 2017
Pages
p. 1, 12
Newspaper
Arcadia Weekly
Date
November 23, 2017
Pages
p. 1, 12
Subjects
Roads
Streets
Wray, Phil
Item ID
35205AN
Collection
Newspaper Index
Less detail

Street closures for the 59th Annual Festival of Bands Parade hosted by City of Arcadia. Baldwin Avenue between Huntington Drive and Naomi Avenue will be closed 8:00 AM to 1:00 PM, Duarte Road between Golden West and El Monte Avenue closed 8:00 AM to 1:00 PM, and Campus Drive between Santa Anita Avenue and Holly Avenue closed 6:00 AM to 5:00 PM.

https://arcadiahistory.andornot.com/en/permalink/newspaper33262
Newspaper
Mountain Views News
Date
November 17, 2012
Pages
p. 6
Newspaper
Mountain Views News
Date
November 17, 2012
Pages
p. 6
Subjects
Festival of Bands Parade
Street closures
Item ID
33459AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

Wind-swept cities slowly recover from a severe windstorm that blew through the San Gabriel Valley early Thursday morning. Arcadia was hit hard and "city crews and contracts are continuing to work hard to clean roadways," said Arcadia police Lieutenant Tom Leveque. Road closures that remained in effect in Arcadia on Friday morning included: westbound Colorado Street at Santa Anita Avenue; westbound Camino Real Avenue at El Monte Avenue; Longden Avenue between El Monte Avenue and Holly Avenue; Colorado Place between Colorado Boulevard and Huntington Drive; the 200 block of W. Leroy Street; the 1100 block of S. Fifth Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32705
Newspaper
Pasadena Star News,
Date
December 3, 2011
Pages
p. A3
Newspaper
Pasadena Star News,
Date
December 3, 2011
Pages
p. A3
Subjects
Disasters
Emergencies
Street closures
Trees
Weather
Wind and windstorms
Item ID
32902AN
Collection
Newspaper Index
Less detail

Metro Gold Line Bridge, which represents woven baskets, over the 210 Foothill Freeway near Baldwin Avenue in Arcadia, gets its fifth award. The latest one was "Best Project in Southern California" for highways and bridges from Engineering News-Record, a national trade journal on construction and design. The award was presented to Habib Balian, CEO of Metro Gold Line Foothill Extension Construction Authority. Sharing in the award was AECOM, the lead architectural firm that implemented the concept from artist Andrew Leicester and Skanska USA, the construction contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper33698
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Subjects
Awards
Balian, Habib
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33894AN
Collection
Newspaper Index
Less detail

Arcadia's first Lunar New Year Festival (Year of the Monkey) is set for Sunday in downtown Arcadia, will feature traditional Chinese lion and dragon dances at Huntington Drive and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper34425
Newspaper
Pasadena Star News
Date
January 23, 2016
Pages
p. A6
Newspaper
Pasadena Star News
Date
January 23, 2016
Pages
p. A6
Subjects
Chinese New Year--Lunar New Year
Holidays
Item ID
34617AN
Collection
Newspaper Index
Less detail

Denny's windmill spins again. The windmill atop Denny's at northeast corner of Santa Anita Avenue and Huntington Drive was designed by Harold Bissner as the template for Van de Kamp's Holland Dutch Bakery's coffee shop franchise. It opened in 1967 in Arcadia, the first of 15 built from his designs. Denny's bought the location in 1989. Denny's spent $100,000 refurbishing the windmill.

https://arcadiahistory.andornot.com/en/permalink/newspaper34592
Newspaper
Pasadena Star News
Date
June 30, 2016
Pages
p. A3
Newspaper
Pasadena Star News
Date
June 30, 2016
Pages
p. A3
Subjects
Bissner, Harold
Denny's Restaurant
Historic Buildings
Van de Kamp's Bakery
Windmills
Item ID
34784AN
Collection
Newspaper Index
Less detail

In a strongly worded letter to Canadian mogul Frank Stronach, Arcadia city officials urged Santa Anita Park's owner to work with developer Rick Caruso and finish the proposed upscale Shops at Santa Anita mall project that has been in the works for the last five years. Stronach's MI Developments (MID) voided its contract with Caruso following bankruptcy restructuring at Santa Anita Park. In a further flexing of city muscle, the letter stated that it "looks forward to working with the race track in future projects that require City approval."

https://arcadiahistory.andornot.com/en/permalink/newspaper32069
Newspaper
Pasadena Star News
Date
May 19, 2010
Pages
p. A4

Gold Line Bridge over the 210 Foothill Freeway is progressing and artist Andrew Leicester, creator of the woven Native American basket design, approves. The final details of the $18.6 million bridge, including lighting and landscaping, will be completed next month.

https://arcadiahistory.andornot.com/en/permalink/newspaper33261
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33458AN
Collection
Newspaper Index
Less detail

Arcadia launches the new Arcadia Downtown Business Association, with plans to revitalize the downtown district. Matt McSweeney is the association's chairperson and owner of Matt Denny's Ale House Restaurant on East Huntington Drive. City officials will spend about $90,000 on a parking study and about $18,000 in redevelopment funds to get Arcadia Downtown Business Association off the ground. The revitalization plans should work nicely with the slated opening of the Gold Line station at the northwest corner of North First Avenue and East Santa Clara Street by 2014.

https://arcadiahistory.andornot.com/en/permalink/newspaper32354
Newspaper
Pasadena Star News
Date
March 20, 2011
Pages
p. A1, A9
Newspaper
Pasadena Star News
Date
March 20, 2011
Pages
p. A1, A9
Subjects
Arcadia Downtown Business Association
Business and Industry
Redevelopment
Item ID
32552AN
Collection
Newspaper Index
Less detail

Iconic Arcadia windmill will turn, turn, turn. Former Arcadia Mayor George Fasching spearheaded the effort to get Denny's windmill running again. Restoration work will begin soon, with June as the target for the windmill to run again. The windmill was the trademark for Van de Kamp's Holland Dutch Bakery, which was at this site, at the corner of Huntington Drive and Santa Anita Avenue, in 1967.

https://arcadiahistory.andornot.com/en/permalink/newspaper34520
Newspaper
Arcadia Weekly
Date
April 7, 2016
Pages
p. 1, 17
Newspaper
Arcadia Weekly
Date
April 7, 2016
Pages
p. 1, 17
Subjects
Bissner, Harold
Denny's Restaurant
Fasching, George
Historic Buildings
Sargis, Joe
Van de Kamp's Bakery
Windmills
Zook, Harold
Item ID
34712AN
Collection
Newspaper Index
Less detail

Downtown Arcadia in 2019. Large mixed-use project (38 apartments, 16000 s.f. retail, office, restaurants) at First Avenue and Wheeler Street will finish and open later this year. New restaurant "Trendy Thai 2 Go" opened at 18 North First Avenue (formerly Stacked Sandwich) and Shabu Lin is about to open at 101 South First Avenue (formerly Zapata Vive). Downtown AIA will be implementing several new streetscape beautification projects this year, planning has started on year-round decorative tree lighting on First Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper35455
Newspaper
Arcadia Weekly
Date
January 24, 2019
Pages
p. 1, 9
Newspaper
Arcadia Weekly
Date
January 24, 2019
Pages
p. 1, 9
Subjects
Downtown Arcadia Improvement Association (Downtown AIA)
Business and Industry
Economy
Item ID
35647AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.