Skip header and navigation

20 records – page 1 of 1.

Partial opening of the Pasadena interchange is due in late 1974. A major portion - a 4.5 mile section from Fair Oaks to Rosemead - will open in the summer of 1975.

https://arcadiahistory.andornot.com/en/permalink/newspaper1627
Newspaper
Arcadia Tribune
Date
August 11, 1974
Pages
p. B-1
Newspaper
Arcadia Tribune
Date
August 11, 1974
Pages
p. B-1
Subjects
Foothill Freeway - (210)
Item ID
1626AN
Collection
Newspaper Index
Less detail

Solutions are being sought to the problems of freeway noise and its impact on the eastern edge of the City.

https://arcadiahistory.andornot.com/en/permalink/newspaper1629
Newspaper
Arcadia Tribune
Date
June 2, 1977
Pages
p. A-1
Newspaper
Arcadia Tribune
Date
June 2, 1977
Pages
p. A-1
Subjects
Foothill Freeway - (210)
Item ID
1628AN
Collection
Newspaper Index
Less detail

Metro to improve 210 Freeway barriers, after a series of crashes over the last 2 years involved cars and trucks landing on the Gold Line tracks. Metro plans to install taller, stronger barriers and a detection system on 6 miles of right-of-way down the middle of the 210 Freeway in Pasadena and Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper35243
Newspaper
Mountain Views News
Date
July 28, 2018
Pages
p. 5
Newspaper
Mountain Views News
Date
July 28, 2018
Pages
p. 5
Subjects
210 Foothill Freeway
Light rail trains
Metro Gold Line
Railroads
Transportation
Item ID
35432AN
Collection
Newspaper Index
Less detail

Noise report due soon from the State Department of Transportation Division of Highways.

https://arcadiahistory.andornot.com/en/permalink/newspaper1626
Newspaper
Arcadia Tribune
Date
June 16, 1974
Pages
p. A-1
Newspaper
Arcadia Tribune
Date
June 16, 1974
Pages
p. A-1
Subjects
Foothill Freeway - (210)
Item ID
1625AN
Collection
Newspaper Index
Less detail

A freeway shooting leaves one dead in Arcadia. Driver crashes, dies, after being shot by someone in another car while on the 210 Freeway, California Highway Patrol reports. The driver was a woman, a Monrovia resident.

https://arcadiahistory.andornot.com/en/permalink/newspaper36037
Newspaper
Pasadena Star News
Date
September 5, 2021
Pages
p. A1, A5
Newspaper
Pasadena Star News
Date
September 5, 2021
Pages
p. A1, A5
Subjects
Deaths
210 Freeway
Shootings
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill train set to roll on March 5. The 11.5 mile extension from East Pasadena's Sierra Madre Villa Station to Azusa/Glendora border is expected to have 13,600 riders per day and trains to arrive every 12 minutes. The new stations are Arcadia, Monrovia, Duarte/City of Hope, Irwindale, Azusa Downtown, and Azusa Pacific University.

https://arcadiahistory.andornot.com/en/permalink/newspaper34354
Newspaper
Pasadena Star News
Date
October 23, 2015
Pages
p. A1, A5
Newspaper
Pasadena Star News
Date
October 23, 2015
Pages
p. A1, A5
Subjects
Metro Gold Line--Foothill Extension
Light Rail
Railroads
Trains
Train stations
Transportation
Item ID
34547AN
Collection
Newspaper Index
Less detail

Lack of train cars may delay the openings of the Expo Line Phase 2 from Culver City to Santa Monica and the Gold Line Foothill Extension from Pasadena to Azusa. Metro reports delivery of rail cars won't be complete until January 2017, while construction of the extensions should be done July/August (Expo) and late September (Gold Line), of 2015. The builder of the train cars is Kinkisharyo International, a Japanese company that is assembling the light rail trains in Palmdale, California. The Expo Line needs 42 cars and the Gold Line needs 15.

https://arcadiahistory.andornot.com/en/permalink/newspaper34025
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Subjects
Balian, Habib
Kinkisharyo International
Light rail trains
Metro Gold Line Foothill Extension
Item ID
34219AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

In the first 7 week phase, eastbound Huntington Drive at Second Avenue in Arcadia, has been narrowed to one lane as the Los Angeles County Department of Public Works prepares to begin a seismic retrofit of the overhead train trestle (bridge) for the future Metro Gold Line. During phase 2, westbound Huntington Drive at Second Avenue will be reduced to one lane. It should take 4 months to complete the retrofit.

https://arcadiahistory.andornot.com/en/permalink/newspaper32288
Newspaper
Pasadena Star News
Date
January 8, 2011
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 8, 2011
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Seismic retrofitting
Item ID
32487AN
Collection
Newspaper Index
Less detail

Gold Line Bridge over the 210 Foothill Freeway is progressing and artist Andrew Leicester, creator of the woven Native American basket design, approves. The final details of the $18.6 million bridge, including lighting and landscaping, will be completed next month.

https://arcadiahistory.andornot.com/en/permalink/newspaper33261
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33458AN
Collection
Newspaper Index
Less detail

Gold Line bridge work to cause more closures. The construction remains on schedule and will require as many as 20 late-night full eastbound lane closures in the next two months. The final abutment, or end of the bridge, will be poured next week. The full lane closures generally occur from midnight to 5:00 AM, during which traffic will be detoured off the 210 Freeway at Baldwin Avenue and routed along Foothill Boulevard to Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32809
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Item ID
33006AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension Construction Authority announced that structural work is complete for Gold Line Bridge over Interstate 210 Freeway. "The bridge can now stand on its own," said Construction Authority CEO Habib F. Balian. The bridge is a 584-linear foot, $18.6 million rail bridge that helps extend the Gold Line from Pasadena to Azusa, in this first segment.

https://arcadiahistory.andornot.com/en/permalink/newspaper33151
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Subjects
Balian, Habib
Bridges
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
33348AN
Collection
Newspaper Index
Less detail

210 Freeway closure creates 5-mile backup for 5 days. 605 Freeway also affected by work on a bridge. Caltrans is repairing a 50-year-old concrete bridge on the 210 Freeway spanning the San Gabriel River. Most affected were motorists and truckers from eastern Los Angeles County and Inland Empire, driving the preferred route into Irwindale, Duarte, Arcadia, Monrovia, Pasadena, and San Fernando Valley.

https://arcadiahistory.andornot.com/en/permalink/newspaper36284
Newspaper
Pasadena Star News
Date
July 22, 2022
Pages
p. A3, A4
Newspaper
Pasadena Star News
Date
July 22, 2022
Pages
p. A3, A4
Subjects
Caltrans
Freeways
San Gabriel River Bridge Hinge Replacement Project
Traffic
Collection
Newspaper Index
Less detail

All aboard: Arcadia gets into training. The Metro Gold Line Station in Arcadia will have a grand opening on Saturday, March 5. The light rail Foothill Extension from Pasadena to Azusa will be offering free rides on March 5.

https://arcadiahistory.andornot.com/en/permalink/newspaper34475
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Subjects
Arcadia Station (Gold Line)
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34667AN
Collection
Newspaper Index
Less detail

Gold Line bridge across the 210 Freeway just west of Santa Anita Avenue is underway. There is a temporary support structure across the lanes which allows trucks under 15 feet tall to pass freely. When the structure is complete, the Gold Line Construction Authority says the height allowance will be 19 feet. The $18.6 million, 584-foot Gold Line Bridge, the first component of the 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension, started last summer and expected to be completed later this year.

https://arcadiahistory.andornot.com/en/permalink/newspaper32841
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33038AN
Collection
Newspaper Index
Less detail

Completion of the Gold Line Bridge over the 210 Foothill Freeway in Arcadia is celebrated. The $18.6 million bridge, completed on time and on budget, is only one element of the $1.2 billion eastward extension of the Gold Line through Arcadia, Monrovia, Duarte, Irwindale, and Azusa. Andrew Leicester is the artist and designer of the bridge baskets.

https://arcadiahistory.andornot.com/en/permalink/newspaper33270
Newspaper
Arcadia Weekly
Date
December 13, 2012
Pages
p. 1, 18
Newspaper
Arcadia Weekly
Date
December 13, 2012
Pages
p. 1, 18
Subjects
Balian, Habib
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33467AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper32557
Newspaper
Pasadena Star News,
Date
October 4, 2011
Pages
p. A3

20 records – page 1 of 1.