Skip header and navigation

20 records – page 1 of 1.

About 1000 feet of sound walls will be built by the westbound lanes of the 210 Foothill Freeway between Second Avenue and Fifth Avenue. There is also discussion of future sound wall construction projects.

https://arcadiahistory.andornot.com/en/permalink/newspaper30026
Newspaper
Arcadia Weekly
Date
July 12, 2001
Pages
p. 1, 10
Newspaper
Arcadia Weekly
Date
July 12, 2001
Pages
p. 1, 10
Subjects
210 Foothill Freeway
Sound Walls
Noise
California Department of Transportation
Item ID
30213AN
Collection
Newspaper Index
Less detail

Sound walls will be built along the 210 Freeway by Metropolitan Transit Authority (MTA) at a cost of $549 million. Under state rules, walls can be built wherever freeway noise is above 67 decibels.

https://arcadiahistory.andornot.com/en/permalink/newspaper30388
Newspaper
Arcadia Weekly
Date
June 13, 2002
Pages
p. 1
Newspaper
Arcadia Weekly
Date
June 13, 2002
Pages
p. 1
Subjects
Noise
Sound Walls
Item ID
30575AN
Collection
Newspaper Index
Less detail

Freeway sound walls promised for Arcadia and Monrovia appear to be still on schedule, according to the Metropolitan Transit Authority (MTA). The sound walls scheduled for construction as early as 2005 run from Michillinda Avenue to Santa Anita Avenue in Arcadia, and from Huntington Drive to California Avenue in Monrovia. Lower priority sound wall project locations are also given.

https://arcadiahistory.andornot.com/en/permalink/newspaper31375
Newspaper
Arcadia Weekly
Date
May 1, 2003
Pages
p. 1
Newspaper
Arcadia Weekly
Date
May 1, 2003
Pages
p. 1
Subjects
Freeways
Metropolitan Transit Authority (MTA)
Noise
Sound Walls
Item ID
31569AN
Collection
Newspaper Index
Less detail

Construction is stalled on a $11.9 million project to build sound walls on a stretch of the westbound 210 Foothill Freeway, between Baldwin Avenue and Rosemead Boulevard, but work is expected to resume soon. The delay is due to inaccurate design plans that are being modified.

https://arcadiahistory.andornot.com/en/permalink/newspaper31066
Newspaper
Pasadena Star News
Date
June 28, 2008
Pages
p. A1
Newspaper
Pasadena Star News
Date
June 28, 2008
Pages
p. A1
Subjects
210 Foothill Freeway
Acoustics
Caltrans
Noise
Sound Walls
Item ID
31261AN
Collection
Newspaper Index
Less detail

Construction will begin on a 14 foot high sound wall along the westbound lanes of the 210 freeway between Second and Fifth Avenues.

https://arcadiahistory.andornot.com/en/permalink/newspaper21227
Newspaper
Pasadena Star News
Date
July 9, 2001
Pages
p. A1
Newspaper
Pasadena Star News
Date
July 9, 2001
Pages
p. A1
Subjects
Freeways
Item ID
21454AN
Collection
Newspaper Index
Less detail

The City Council has decided to spend about $100,000 for vines on the 4.5 miles of sound walls the Metropolitan Transportation Authority will build along the 210 Freeway in 2004-2005.

https://arcadiahistory.andornot.com/en/permalink/newspaper30539
Newspaper
Arcadia Weekly
Date
September 12, 2002
Pages
p. 1
Newspaper
Arcadia Weekly
Date
September 12, 2002
Pages
p. 1
Subjects
Noise
Sound Walls
210 Freeway
Item ID
30727AN
Collection
Newspaper Index
Less detail

A temporary sound wall has been built to block the sound of drilling a new well along Baldwin Avenue, south of Colorado Boulevard, in Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper30399
Newspaper
Pasadena Star News
Date
February 8, 2007
Pages
p. Local 2
Newspaper
Pasadena Star News
Date
February 8, 2007
Pages
p. Local 2
Subjects
Noise
Sound
Sound Walls
Water
Wells
Item ID
30586AN
Collection
Newspaper Index
Less detail

Arcadia City Council commissioned Joe Wertheimer to create a pair of relief murals to be installed on freeway sound walls within the city limits.

https://arcadiahistory.andornot.com/en/permalink/newspaper25247
Newspaper
Pasadena Star News
Date
March 3, 2003
Pages
p. A1
Newspaper
Pasadena Star News
Date
March 3, 2003
Pages
p. A1
Subjects
Sound Walls
Wertheimer, Joe
Murals
Item ID
25444AN
Collection
Newspaper Index
Less detail

Metro to improve 210 Freeway barriers, after a series of crashes over the last 2 years involved cars and trucks landing on the Gold Line tracks. Metro plans to install taller, stronger barriers and a detection system on 6 miles of right-of-way down the middle of the 210 Freeway in Pasadena and Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper35243
Newspaper
Mountain Views News
Date
July 28, 2018
Pages
p. 5
Newspaper
Mountain Views News
Date
July 28, 2018
Pages
p. 5
Subjects
210 Foothill Freeway
Light rail trains
Metro Gold Line
Railroads
Transportation
Item ID
35432AN
Collection
Newspaper Index
Less detail

Part of the 210 Freeway was closed to clean up fuel leaked from a big rig. It happened on the eastbound lanes near Baldwin Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper28304
Newspaper
Pasadena Star News
Date
May 16, 2004
Pages
p. A5

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

New Gold Line Bridge in Arcadia defaced with graffiti. Eastbound lane of 210 Freeway could be closed for clean up.

https://arcadiahistory.andornot.com/en/permalink/newspaper33480
Newspaper
Pasadena Star News
Date
April 4, 2013
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 4, 2013
Pages
p. A1, A4
Subjects
Bridges
Metro Gold Line
Vandalism
Item ID
33675AN
Collection
Newspaper Index
Less detail

A 37-year old Los Angeles man died early Saturday morning after exiting the Foothill Freeway (210) at Baldwin Avenue driving through a perimeter fence and smashing into a concrete wall.

https://arcadiahistory.andornot.com/en/permalink/newspaper30004
Newspaper
Pasadena Star News
Date
April 23, 2006
Pages
p. A4
Newspaper
Pasadena Star News
Date
April 23, 2006
Pages
p. A4
Subjects
Deaths
Automobile crashes
Traffic Accidents
Hernandez, Edmundo, Jr.
Item ID
30191AN
Collection
Newspaper Index
Less detail

Christopher Carl Eastland was killed when his disabled car was struck by a Jeep driven by an alleged drunk driver on the eastbound Foothill Freeway (210).

https://arcadiahistory.andornot.com/en/permalink/newspaper27836
Newspaper
Pasadena Star News
Date
March 6, 2004
Pages
p. A2
Newspaper
Pasadena Star News
Date
March 6, 2004
Pages
p. A2
Subjects
Eastland, Christopher Earl
Automobile Accident
Obituary/death notice
Item ID
28033AN
Collection
Newspaper Index
Less detail

Gold Line bridge work to cause more closures. The construction remains on schedule and will require as many as 20 late-night full eastbound lane closures in the next two months. The final abutment, or end of the bridge, will be poured next week. The full lane closures generally occur from midnight to 5:00 AM, during which traffic will be detoured off the 210 Freeway at Baldwin Avenue and routed along Foothill Boulevard to Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32809
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Item ID
33006AN
Collection
Newspaper Index
Less detail

Harris & Associates will design streetscape and landscape improvements for the Santa Anita Entry Corridor, meaning Santa Anita Avenue from Huntington Drive to the Foothill 210 Freeway and on areas adjacent to the Santa Anita Avenue and Baldwin Avenue freeway ramps. The project will include pavement work. The contract for the project is for $107,211.

https://arcadiahistory.andornot.com/en/permalink/newspaper31526
Newspaper
Arcadia Weekly
Date
May 29, 2003
Pages
p. 18
Newspaper
Arcadia Weekly
Date
May 29, 2003
Pages
p. 18
Subjects
Harris and Associates - Harris & Associates
Landscaping
Item ID
31722AN
Collection
Newspaper Index
Less detail

New bridge over 210 Freeway taking shape at Santa Anita Avenue offramp. Skanska USA is the lead bridge contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper32835
Newspaper
Arcadia Weekly
Date
February 16, 2012
Pages
p. 1, 4
Newspaper
Arcadia Weekly
Date
February 16, 2012
Pages
p. 1, 4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Skanska USA
Item ID
33032AN
Collection
Newspaper Index
Less detail

2,100 cubic yards of concrete has been poured now and the 584-foot Gold Line Bridge is taking shape inside the wood forms above the eastbound lanes of the 210 Freeway.

https://arcadiahistory.andornot.com/en/permalink/newspaper33073
Newspaper
Pasadena Star News
Date
June 20, 2012
Pages
p. A3

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.