210 Freeway sound wall is finished. The Metro project, which started in 2009, consists of 2 miles of sound walls along westbound and eastbound lanes of the 210 Freeway between Santa Anita Avenue and California Avenue in Arcadia and Monrovia, paid with Measure R funds. The sound walls provide at least 5 decibels of noise reduction. A ribbon cutting ceremony was held. Several Arcadia residents near Victory Chapel on N. First Avenue, where the sound wall ends, are disappointed the barrier doesn't extend farther west.

https://arcadiahistory.andornot.com/en/permalink/newspaper33107
Newspaper
Pasadena Star News
Date
July 17, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
July 17, 2012
Pages
p. A3
Subjects
Los Angeles County Metropolitan Transportation Authority
Noise pollution
Sound Walls
Item ID
33304AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

Colorado Boulevard between Santa Anita Avenue and San Antonio Road will be closed for nearly 5 months to allow crews to build a bridge needed for Metro Gold Line Foothill Extension. The Colorado Boulevard bridge is one of three Gold Line bridges to be built on Arcadia streets. The stretch of Colorado Boulevard will be closed 24 hours/day, 7 days/week until April 30.

https://arcadiahistory.andornot.com/en/permalink/newspaper33336
Newspaper
Pasadena Star News
Date
January 9, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 9, 2013
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33532AN
Collection
Newspaper Index
Less detail

Wind-swept cities slowly recover from a severe windstorm that blew through the San Gabriel Valley early Thursday morning. Arcadia was hit hard and "city crews and contracts are continuing to work hard to clean roadways," said Arcadia police Lieutenant Tom Leveque. Road closures that remained in effect in Arcadia on Friday morning included: westbound Colorado Street at Santa Anita Avenue; westbound Camino Real Avenue at El Monte Avenue; Longden Avenue between El Monte Avenue and Holly Avenue; Colorado Place between Colorado Boulevard and Huntington Drive; the 200 block of W. Leroy Street; the 1100 block of S. Fifth Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32705
Newspaper
Pasadena Star News,
Date
December 3, 2011
Pages
p. A3
Newspaper
Pasadena Star News,
Date
December 3, 2011
Pages
p. A3
Subjects
Disasters
Emergencies
Street closures
Trees
Weather
Wind and windstorms
Item ID
32902AN
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

Gold Line construction extends closure of Colorado Boulevard for another three weeks, until the third week of May, due to underground utility work. See hard copy in VF Railroads-Light Rail-Gold Line.

https://arcadiahistory.andornot.com/en/permalink/newspaper33493
Newspaper
Pasadena Star News
Date
May 4, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
May 4, 2013
Pages
p. A3
Subjects
Bridges
Colorado Boulevard bridge
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33687AN
Collection
Newspaper Index
Less detail

Metro to improve 210 Freeway barriers, after a series of crashes over the last 2 years involved cars and trucks landing on the Gold Line tracks. Metro plans to install taller, stronger barriers and a detection system on 6 miles of right-of-way down the middle of the 210 Freeway in Pasadena and Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper35243
Newspaper
Mountain Views News
Date
July 28, 2018
Pages
p. 5
Newspaper
Mountain Views News
Date
July 28, 2018
Pages
p. 5
Subjects
210 Foothill Freeway
Light rail trains
Metro Gold Line
Railroads
Transportation
Item ID
35432AN
Collection
Newspaper Index
Less detail

"State of the City" address was given by City Manager Dominic Lazzaretto at an event hosted by Arcadia Chamber of Commerce. Due mainly to solid property, utility and sales tax revenue, Arcadia has remained fiscally sound despite a sluggish state and national economy. Overall in 2014, the city received $56.9 million in revenue and spent $54.7 million.

https://arcadiahistory.andornot.com/en/permalink/newspaper34080
Newspaper
Arcadia Weekly
Date
January 29, 2015
Pages
p. 1, 14
Newspaper
Arcadia Weekly
Date
January 29, 2015
Pages
p. 1, 14
Subjects
Arcadia budget
Economy
Lazzaretto, Dominic
Revenue
Item ID
34274AN
Collection
Newspaper Index
Less detail

Gold Line bridge work to cause more closures. The construction remains on schedule and will require as many as 20 late-night full eastbound lane closures in the next two months. The final abutment, or end of the bridge, will be poured next week. The full lane closures generally occur from midnight to 5:00 AM, during which traffic will be detoured off the 210 Freeway at Baldwin Avenue and routed along Foothill Boulevard to Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32809
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Item ID
33006AN
Collection
Newspaper Index
Less detail

Gold Line Bridge over the 210 Foothill Freeway is progressing and artist Andrew Leicester, creator of the woven Native American basket design, approves. The final details of the $18.6 million bridge, including lighting and landscaping, will be completed next month.

https://arcadiahistory.andornot.com/en/permalink/newspaper33261
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33458AN
Collection
Newspaper Index
Less detail

Arcadia city is widening and improving three major downtown intersections, a $1 million project that has caused significant congestion in recent weeks. The work is taking place on Huntington Drive at intersections of Santa Anita Avenue, Santa Clara Avenue and Colorado Place. Sixty percent of the funding is by the City and forty percent by the Los Angeles County Metropolitan Transportation Authority. The city is also replacing an older sewer with a new larger one on Baldwin Avenue, northbound between Huntington Drive and Duarte Road, and will repave the road. Cost about $413,000.

https://arcadiahistory.andornot.com/en/permalink/newspaper33141
Newspaper
Pasadena Star News
Date
August 26, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
August 26, 2012
Pages
p. A3
Subjects
Street construction
Street repairs
Item ID
33338AN
Collection
Newspaper Index
Less detail

A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper32557
Newspaper
Pasadena Star News,
Date
October 4, 2011
Pages
p. A3

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

Kohl's Department Store to close 7 underperforming Southern California stores, including Arcadia/San Gabriel location at 7279 Rosemead Boulevard.

https://arcadiahistory.andornot.com/en/permalink/newspaper34497
Newspaper
Pasadena Star News
Date
March 22, 2016
Pages
p. A1
Newspaper
Pasadena Star News
Date
March 22, 2016
Pages
p. A1
Subjects
Kohl's Department Store
Business and Industry
Item ID
34689AN
Collection
Newspaper Index
Less detail

Metro Gold Line Bridge, which represents woven baskets, over the 210 Foothill Freeway near Baldwin Avenue in Arcadia, gets its fifth award. The latest one was "Best Project in Southern California" for highways and bridges from Engineering News-Record, a national trade journal on construction and design. The award was presented to Habib Balian, CEO of Metro Gold Line Foothill Extension Construction Authority. Sharing in the award was AECOM, the lead architectural firm that implemented the concept from artist Andrew Leicester and Skanska USA, the construction contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper33698
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Subjects
Awards
Balian, Habib
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33894AN
Collection
Newspaper Index
Less detail

The 11.5 mile light rail Gold Line extension from Pasadena to Azusa was awarded to Foothill Transit Constructors. Kiewit-Parsons, a joint venture company, will design and build the project. Funding comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper32468
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Subjects
Contractors
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32667AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

A team of designers and builders (photo) from Kiewit Parsons firm working on the Metro Gold Line Foothill Extension prepare to remove the existing railroad bridge on Colorado Boulevard between San Antonio Road and Santa Anita Avenue in Arcadia. That section of Colorado Boulevard may close today. The portion of Colorado Boulevard west of North Santa Anita Avenue, is scheduled to be closed from 7:00 AM to 5:00 PM weekdays through June 8, to remove the existing railroad bridge. Since the Colorado Boulevard bridge was once an old freight line bridge, it is not wide enough to accommodate light rail trains and tracks, and thus, will be demolished over the next 4 weeks.

https://arcadiahistory.andornot.com/en/permalink/newspaper32976
Newspaper
Pasadena Star News
Date
May 23, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
May 23, 2012
Pages
p. A3
Subjects
Bridges
Demolition
Kiewit Parsons
Metro Gold Line Foothill Extension
Item ID
33173AN
Collection
Newspaper Index
Less detail

California State Treasurer John Chiang and Arcadia leaders shower accolades at the groundbreaking of Le Meridien, One Gallop Way. It is a $300 million hotel and mixed-use development on seven acres, opposite Santa Anita Park race track. Developer Chateau Group USA held the ceremonal groundbreaking on June 27. Le Meridien is a Marriott brand. CEO Eric Chen spoke. Architects Orange, interior design firm Linda Snyder Associates and construction company Snyder Langston have been tapped to work this project. To open in 2020.

https://arcadiahistory.andornot.com/en/permalink/newspaper35211
Newspaper
Arcadia Weekly
Date
June 28, 2018
Pages
p. 1, 10
Newspaper
Arcadia Weekly
Date
June 28, 2018
Pages
p. 1, 10
Subjects
Chateau Group
Chen, Eric
Chiang, John
Hotels and motels
Le Meridien
Marriott
Item ID
35400AN
Collection
Newspaper Index
Less detail