Skip header and navigation

20 records – page 1 of 1.

New Gold Line Bridge in Arcadia defaced with graffiti. Eastbound lane of 210 Freeway could be closed for clean up.

https://arcadiahistory.andornot.com/en/permalink/newspaper33480
Newspaper
Pasadena Star News
Date
April 4, 2013
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 4, 2013
Pages
p. A1, A4
Subjects
Bridges
Metro Gold Line
Vandalism
Item ID
33675AN
Collection
Newspaper Index
Less detail

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

2,100 cubic yards of concrete has been poured now and the 584-foot Gold Line Bridge is taking shape inside the wood forms above the eastbound lanes of the 210 Freeway.

https://arcadiahistory.andornot.com/en/permalink/newspaper33073
Newspaper
Pasadena Star News
Date
June 20, 2012
Pages
p. A3

Gold Line bridge work to cause more closures. The construction remains on schedule and will require as many as 20 late-night full eastbound lane closures in the next two months. The final abutment, or end of the bridge, will be poured next week. The full lane closures generally occur from midnight to 5:00 AM, during which traffic will be detoured off the 210 Freeway at Baldwin Avenue and routed along Foothill Boulevard to Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32809
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Item ID
33006AN
Collection
Newspaper Index
Less detail

210 Freeway sound wall is finished. The Metro project, which started in 2009, consists of 2 miles of sound walls along westbound and eastbound lanes of the 210 Freeway between Santa Anita Avenue and California Avenue in Arcadia and Monrovia, paid with Measure R funds. The sound walls provide at least 5 decibels of noise reduction. A ribbon cutting ceremony was held. Several Arcadia residents near Victory Chapel on N. First Avenue, where the sound wall ends, are disappointed the barrier doesn't extend farther west.

https://arcadiahistory.andornot.com/en/permalink/newspaper33107
Newspaper
Pasadena Star News
Date
July 17, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
July 17, 2012
Pages
p. A3
Subjects
Los Angeles County Metropolitan Transportation Authority
Noise pollution
Sound Walls
Item ID
33304AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

Arcadia spends $2 million on water to offset needs for the 2015-2016 fiscal year. It is the second purchase of its kind since April. The 3000 acre-feet of water was purchased from the Upper San Gabriel Valley Water District, will be stored in a cyclic storage account in main groundwater basin, which supplies a major portion of the city's drinking water.

https://arcadiahistory.andornot.com/en/permalink/newspaper34361
Newspaper
Pasadena Star News
Date
November 19, 2015
Pages
p. A4
Newspaper
Pasadena Star News
Date
November 19, 2015
Pages
p. A4
Subjects
Upper San Gabriel Valley Water District
Water
Item ID
34554AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

A Metro Gold Line deal to purchase land in Monrovia for a maintenance yard for $56 million, from George Brokate, a Marine veteran from Newport Beach, has been reached. This cleared the last major obstacle to the $735 million Pasadena to Azusa Metro Gold Line Foothill Extension. Photo shows the Gold Line bridge over the 210 Freeway in Arcadia under construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper32849
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Subjects
Brokate, George
Light Rail
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Trains
Transportation
Item ID
33046AN
Collection
Newspaper Index
Less detail

In the first 7 week phase, eastbound Huntington Drive at Second Avenue in Arcadia, has been narrowed to one lane as the Los Angeles County Department of Public Works prepares to begin a seismic retrofit of the overhead train trestle (bridge) for the future Metro Gold Line. During phase 2, westbound Huntington Drive at Second Avenue will be reduced to one lane. It should take 4 months to complete the retrofit.

https://arcadiahistory.andornot.com/en/permalink/newspaper32288
Newspaper
Pasadena Star News
Date
January 8, 2011
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 8, 2011
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Seismic retrofitting
Item ID
32487AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

Metro Foothill Gold Line crossing gates snarl traffic. Faulty part that was recalled worldwide blamed for malfunctions. There are 14 at-grade crossings throughout the 5 cities along the new extension: Arcadia, Monrovia, Duarte, Irwindale and Azusa (has two stations). Arcadia has only one at-grade crossing, but some cars were stuck at the crossing for 5 minutes or more. Each of the cities is working closely with Foothill Gold Line Construction Authority to synchronize traffic signals with train crossings to improve traffic flow.

https://arcadiahistory.andornot.com/en/permalink/newspaper34490
Newspaper
Pasadena Star News
Date
March 12, 2016
Pages
p. A1, A10
Newspaper
Pasadena Star News
Date
March 12, 2016
Pages
p. A1, A10
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Traffic
Transportation
Item ID
34682AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension had a ground breaking ceremony at Newcastle Park in Arcadia, for a project that would extend the line from East Pasadena to Azusa, with stops in Arcadia, Monrovia, Duarte and Irwindale. This phase is fully funded through Measure R, the Los Angeles County half-cent sales tax increase that voters approved to fund transportation projects. Eventually the Gold Line will reach the Inland Empire.

https://arcadiahistory.andornot.com/en/permalink/newspaper32103
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32300AN
Collection
Newspaper Index
Less detail

The City of Arcadia is using $646,000 in federal stimulus funds for repairs, repaving, re-striping and adding bicycle lanes on Santa Anita Avenue, north of Foothill Boulevard. The city has received $534,000 in stimulus money to retrofit City Hall with an energy-efficient heating and cooling system and $80,000 for equipment and training for its police department. Sometime in late spring, officials plan to widen intersections along Santa Anita Avenue, adding turn lanes or through lanes at Foothill Boulevard, Live Oak Avenue and Duarte Road.

https://arcadiahistory.andornot.com/en/permalink/newspaper31891
Newspaper
Pasadena Star News
Date
February 4, 2010
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 4, 2010
Pages
p. A3
Subjects
Federal funding
Road construction
Item ID
32088AN
Collection
Newspaper Index
Less detail

San Gabriel Mayor Albert Y. M. Huang announced he would resign from office after his arrest in a domestic violence case involving a confrontation with a woman (not his wife) outside New Taste Dupling House at 301 West Valley Boulevard. San Gabriel City Council accepted his resignation. He graduated from Arcadia High School in 1994.

https://arcadiahistory.andornot.com/en/permalink/newspaper32216
Newspaper
Pasadena Star News
Date
October 20, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
October 20, 2010
Pages
p. A1, A4
Subjects
Arrests
Huang, Albert Y. M.
Politicians
San Gabriel mayors
Item ID
32415AN
Collection
Newspaper Index
Less detail

San Gabriel Mayor Albert Y. M. Huang, 35, was arrested on suspicion of felony robbery and assault and battery, after an argument with an unidentified woman over money at New Taste Dupling House at 301 West Valley Boulevard. He graduated from Arcadia High School in 1994.

https://arcadiahistory.andornot.com/en/permalink/newspaper32214
Newspaper
Pasadena Star News
Date
October 16, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
October 16, 2010
Pages
p. A1, A4
Subjects
Arrests
Huang, Albert Y. M.
Politicians
San Gabriel mayors
Item ID
32413AN
Collection
Newspaper Index
Less detail

A joint raid by more than 200 deputies and officers, targeting parolees with connections to the Pasadena Denver Lanes Blood gang, resulted in 15 arrests on charges ranging from possession of narcotics to weapons. The 6:00 AM raid occurred simultaneously at 71 residences in Altadena, Pasadena, Los Angeles, Monrovia, Arcadia and Temple City.

https://arcadiahistory.andornot.com/en/permalink/newspaper32173
Newspaper
Pasadena Star News
Date
September 10, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 10, 2010
Pages
p. A1, A4
Subjects
Arrests
Crime and Criminals
Denver Lanes Bloods
Gangs
Los Angeles County Sheriffs
Item ID
32371AN
Collection
Newspaper Index
Less detail

Miss Junior Taiwan Verena Wong, 5, of Arcadia (photo) and Miss Taiwan Paula Wu of Palo Alto together give away toys to preschoolers at La Casa de San Gabriel Community Center. They also presented the center with a $3000 check from Chinatrust Bank.

https://arcadiahistory.andornot.com/en/permalink/newspaper32249
Newspaper
Pasadena Star News
Date
December 4, 2010
Pages
p. A3
Newspaper
Pasadena Star News
Date
December 4, 2010
Pages
p. A3
Subjects
La Casa de San Gabriel Community Center
Wong, Verena
Wu, Paula
Item ID
32448AN
Collection
Newspaper Index
Less detail

Metro adds Gold Line service. Every train will run from Azusa Pacific University/Citrus College to East Los Angeles. Due to unprecedented demand, the Gold Line will run every seven minutes during peak morning and afternoon hours on weekdays. See also Arcadia Weekly, p. 2, June 30, 2016 "LA Metro improves Gold Line; relieves crowding for SGV communities."

https://arcadiahistory.andornot.com/en/permalink/newspaper34589
Newspaper
Pasadena Star News
Date
June 25, 2016
Pages
p. A1, A10
Newspaper
Pasadena Star News
Date
June 25, 2016
Pages
p. A1, A10
Subjects
Light Rail
Mass transit
Metro Gold Line Foothill Extension
Railroads
Trains
Transportation
Item ID
34781AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.