Skip header and navigation

20 records – page 1 of 1.

Testing of Gold Line light rail cars began on Monday. It passed over the newly built bridge on Santa Anita Avenue in Arcadia. See also Arcadia Weekly, p. 1, 17, December 11, 2014.

https://arcadiahistory.andornot.com/en/permalink/newspaper34039
Newspaper
Pasadena Star News
Date
December 9, 2014
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
December 9, 2014
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34233AN
Collection
Newspaper Index
Less detail

Alan Weeks, a retiree who rode the last Pacific Electric Red Car that went through this area in 1951, visits the Arcadia Gold Line Station at North First Avenue and Santa Clara Street.

https://arcadiahistory.andornot.com/en/permalink/newspaper34453
Newspaper
Pasadena Star News
Date
February 11, 2016
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 11, 2016
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line
Pacific Electric Red Car (electric trolley)
Railroads--History
Transportation
Weeks, Alan
Item ID
34645AN
Collection
Newspaper Index
Less detail

Metro Foothill Gold Line crossing gates snarl traffic. Faulty part that was recalled worldwide blamed for malfunctions. There are 14 at-grade crossings throughout the 5 cities along the new extension: Arcadia, Monrovia, Duarte, Irwindale and Azusa (has two stations). Arcadia has only one at-grade crossing, but some cars were stuck at the crossing for 5 minutes or more. Each of the cities is working closely with Foothill Gold Line Construction Authority to synchronize traffic signals with train crossings to improve traffic flow.

https://arcadiahistory.andornot.com/en/permalink/newspaper34490
Newspaper
Pasadena Star News
Date
March 12, 2016
Pages
p. A1, A10
Newspaper
Pasadena Star News
Date
March 12, 2016
Pages
p. A1, A10
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Traffic
Transportation
Item ID
34682AN
Collection
Newspaper Index
Less detail

Measure R, by which voters approved a half-cent sales tax last November, was to fund dozens of new transportation projects across Los Angeles County. However, rather than launch new projects, several San Gabriel Valley cities plan to use the windfall to keep municipal bus routes and Dial-a-Ride shuttles in operation. Arcadia may store up some of the funding it is due to receive, 290,000 this year and $496,000 next year, for a larger project down the line, said Transportation Services Manager Linda Hui. Possible projects include funding part of a grade separation at a future Gold Line station in Arcadia, or funding other Gold Line station enhancements, such as shuttle services. Street improvements are also a possibility for Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper31831
Newspaper
Pasadena Star News
Date
November 29, 2009
Pages
p. A1
Newspaper
Pasadena Star News
Date
November 29, 2009
Pages
p. A1
Subjects
Gold Line - Arcadia station - grade separation
Light rail trains
Transportation
Item ID
32028AN
Collection
Newspaper Index
Less detail

Yesterday Arcadia city officials celebrated the groundbreaking of a nearly $12.5 million Gold Line bridge that will be built over Santa Anita Avenue, south of Colorado Boulevard. Starting on or near May 1, the new bridge's construction, which would take 7 months, will cause lane closures on Santa Anita Avenue, disruptions and detours, including not being able to enter In-N-Out Burger from Santa Anita Avenue for 4 months. The bridge is being paid for by a voter-approved bond measure and city transportation funds.

https://arcadiahistory.andornot.com/en/permalink/newspaper33478
Newspaper
Pasadena Star News
Date
April 13, 2013
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 13, 2013
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33673AN
Collection
Newspaper Index
Less detail

Gold Line construction will cause closure of intersection of First Avenue and Santa Clara Street for six months starting tomorrow. Front Street between Santa Clara Street and Saint Joseph Street will be permanently closing in September for the building of a parking structure and transit plaza on that site.

https://arcadiahistory.andornot.com/en/permalink/newspaper33609
Newspaper
Pasadena Star News
Date
September 8, 2013
Pages
p. A5
Newspaper
Pasadena Star News
Date
September 8, 2013
Pages
p. A5
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33804AN
Collection
Newspaper Index
Less detail

Metro adds Gold Line service. Every train will run from Azusa Pacific University/Citrus College to East Los Angeles. Due to unprecedented demand, the Gold Line will run every seven minutes during peak morning and afternoon hours on weekdays. See also Arcadia Weekly, p. 2, June 30, 2016 "LA Metro improves Gold Line; relieves crowding for SGV communities."

https://arcadiahistory.andornot.com/en/permalink/newspaper34589
Newspaper
Pasadena Star News
Date
June 25, 2016
Pages
p. A1, A10
Newspaper
Pasadena Star News
Date
June 25, 2016
Pages
p. A1, A10
Subjects
Light Rail
Mass transit
Metro Gold Line Foothill Extension
Railroads
Trains
Transportation
Item ID
34781AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

Plans for a Blue Line rail depot to be built on Santa Clara St. near First Ave. disappoints city officials who hoped it would be closer to main tourist hubs.

https://arcadiahistory.andornot.com/en/permalink/newspaper22217
Newspaper
Pasadena Star News
Date
November 16, 2001
Pages
p. A1
Newspaper
Pasadena Star News
Date
November 16, 2001
Pages
p. A1
Subjects
Transportation
Blue line
Item ID
22432AN
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

Bus transportation between Los Angeles International Airport (LAX) and Arcadia approved. Six buses will leave the Flamingo Hotel daily. See hard copy of newspaper in Box 51.

https://arcadiahistory.andornot.com/en/permalink/newspaper33952
Newspaper
Arcadia News Post
Date
August 21, 1967
Pages
p. 1
Newspaper
Arcadia News Post
Date
August 21, 1967
Pages
p. 1
Subjects
Flamingo Hotel
Los Angeles International Airport (LAX)
Transportation
Item ID
34146AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

Swifties are beyond excited. Singer Taylor Swift's fans are taking Metro transit trains and shuttles to see her perform at Inglewood's SoFi Stadium. Fans Viridiana Gonzalez and Victoria Kravitz took the A-Line from Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper36518
Newspaper
Pasadena Star News
Date
August 4, 2023
Pages
p. A1, A9

Gold Line construction extends closure of Colorado Boulevard for another three weeks, until the third week of May, due to underground utility work. See hard copy in VF Railroads-Light Rail-Gold Line.

https://arcadiahistory.andornot.com/en/permalink/newspaper33493
Newspaper
Pasadena Star News
Date
May 4, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
May 4, 2013
Pages
p. A3
Subjects
Bridges
Colorado Boulevard bridge
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33687AN
Collection
Newspaper Index
Less detail

Metropolitan Transportation Agency (MTA) is not considering the Gold Line Foothill Extension from Sierra Madre to Claremont a priority now. County transportation officials recommended the so-called "Subway to the Sea," a proposed extension of the Purple Line out to Santa Monica and a "regional connector" project that would link several rail lines through downtown Los Angeles, as the priorities.

https://arcadiahistory.andornot.com/en/permalink/newspaper31723
Newspaper
Pasadena Star News
Date
September 22, 2009
Pages
p. A4
Newspaper
Pasadena Star News
Date
September 22, 2009
Pages
p. A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Agency (MTA)
Transportation
Item ID
31920AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

Metro Gold Line Bridge, which represents woven baskets, over the 210 Foothill Freeway near Baldwin Avenue in Arcadia, gets its fifth award. The latest one was "Best Project in Southern California" for highways and bridges from Engineering News-Record, a national trade journal on construction and design. The award was presented to Habib Balian, CEO of Metro Gold Line Foothill Extension Construction Authority. Sharing in the award was AECOM, the lead architectural firm that implemented the concept from artist Andrew Leicester and Skanska USA, the construction contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper33698
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Subjects
Awards
Balian, Habib
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33894AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension Construction Authority opened bidding yesterday on Phase 2A of the light rail's extension toward Azusa, which would make a stop in Arcadia. The project is estimated to cost more than $450 million with a completion date in 2017. Measure R guarantees full funding for the Gold Line Extension minus a gap of $500,000. With possible help from a private investment, the completion could be moved up to 2013.

https://arcadiahistory.andornot.com/en/permalink/newspaper32161
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32358AN
Collection
Newspaper Index
Less detail

Taking the A Train: Metro nixing colors. Los Angeles Metropolitan Transportation Authority is getting rid of the colored names of the train lines and switching to letter names. The transition period will begin in about nine months, during which both colors and letters would be used, then the colors will be phased out. The revamped Blue Line to Long Beach will become the A Line. The Red Line subway will become the B Line. Parts of the Green Line will become the C Line. The Purple Line will become the D Line. The Orange Line bus rapid transit in the San Fernando Valley will be the F Line. The Silver Line rapid busway will become the G Line. The Gold Line light rail from Azusa to Los Angeles will be renamed once the downtown Regional Connector is completed at the end of 2021 or early 2022.

https://arcadiahistory.andornot.com/en/permalink/newspaper35351
Newspaper
Pasadena Star News
Date
December 14, 2018
Pages
p. A1, A5
Newspaper
Pasadena Star News
Date
December 14, 2018
Pages
p. A1, A5
Subjects
Los Angeles Metropolitan Transportation Authority
Metro
Trains
Transportation
Item ID
35541AN
Collection
Newspaper Index
Less detail

Mass transit riders take preview run on 11.5 mile Gold Line Foothill extension from is current terminus at Sierra Madre Villa Station (in Pasadena) to the six new stations to the east, including Arcadia Station, Monrovia Station, Duarte Station, Irwindale Station, Downtown Azusa Station, and Azusa Pacific University/Citrus College Station. The new rail cars are stainless steel, made by Kinkisharyo, Model P3010.

https://arcadiahistory.andornot.com/en/permalink/newspaper34456
Newspaper
Pasadena Star News
Date
February 18, 2016
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
February 18, 2016
Pages
p. A1, A6
Subjects
Light rail trains
Kinkisharyo (train manufacturer)
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34648AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.