Skip header and navigation

20 records – page 1 of 1.

The 11.5 mile light rail Gold Line extension from Pasadena to Azusa was awarded to Foothill Transit Constructors. Kiewit-Parsons, a joint venture company, will design and build the project. Funding comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper32468
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Subjects
Contractors
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32667AN
Collection
Newspaper Index
Less detail

The Metropolitan Transportation Authority (MTA) has voted to fully fund the $690 million Gold Line Foothill Extension, from Pasadena to Azusa, and to complete it by 2014, with money from Measure R. Measure R was approved by voters in the November 2008 election. It created a half-cent county sales tax intended for transportation projects. The MTA has the funding for the first phase of the Gold Line light rail to Azusa. The first phase is an 11-mile extension that includes stops in Arcadia, Monrovia, Duarte, Irwindale and Azusa.

https://arcadiahistory.andornot.com/en/permalink/newspaper31950
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32147AN
Collection
Newspaper Index
Less detail

The Metropolitan Transportation Authority (MTA) Board approved $10 million for the 24-mile Gold Line Foothill Extension that is going through Arcadia to Claremont. The money comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper31491
Newspaper
Pasadena Star News
Date
May 29, 2009
Pages
p. A1, A14
Newspaper
Pasadena Star News
Date
May 29, 2009
Pages
p. A1, A14
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
31686AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension Construction Authority announced that structural work is complete for Gold Line Bridge over Interstate 210 Freeway. "The bridge can now stand on its own," said Construction Authority CEO Habib F. Balian. The bridge is a 584-linear foot, $18.6 million rail bridge that helps extend the Gold Line from Pasadena to Azusa, in this first segment.

https://arcadiahistory.andornot.com/en/permalink/newspaper33151
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Subjects
Balian, Habib
Bridges
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
33348AN
Collection
Newspaper Index
Less detail

Ridership on the Gold Line has fallen below expectations. The MTA is now considering a new express service to encourage residents in East Pasadena and Arcadia to take the light rail train.

https://arcadiahistory.andornot.com/en/permalink/newspaper29507
Newspaper
Pasadena Star News
Date
April 18, 2005
Pages
p. A1
Newspaper
Pasadena Star News
Date
April 18, 2005
Pages
p. A1
Subjects
Gold Line
Metropolitan Transportation Authority (MTA)
Commuters
Light rail trains
Item ID
29691AN
Collection
Newspaper Index
Less detail

The abandoned rail bridge over Colorado Boulevard in Arcadia will be removed because it could not accommodate the two-track light rail system and the Gold Line Construction Authority determined it was more efficient and cost effective to remove the structure than to widen it or add a second structure directly adjacent to the ole one. Bridge demolition was the first significant construction effort for Foothill Transit Constructors (FTC) and the alignment project. The Construction Authority will have three open houses in the next two weeks to update the community.

https://arcadiahistory.andornot.com/en/permalink/newspaper33080
Newspaper
Arcadia Weekly
Date
June 21, 2012
Pages
p. 10

After receiving intense pressure from San Gabriel Valley lawmakers, the county's transportation board, the MTA, finally put the Gold Line extension in its long-term plans. This opens up the possibility of federal funding for the project. With this commitment, the Metropolitan Transportation Authority (MTA) has agreed to provide day-to-day operational funding for the first phase of the Gold Line Foothill extension once it is completed.

https://arcadiahistory.andornot.com/en/permalink/newspaper31763
Newspaper
Pasadena Star News
Date
October 23, 2009
Pages
p. A1, A12
Newspaper
Pasadena Star News
Date
October 23, 2009
Pages
p. A1, A12
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
31960AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension had a ground breaking ceremony at Newcastle Park in Arcadia, for a project that would extend the line from East Pasadena to Azusa, with stops in Arcadia, Monrovia, Duarte and Irwindale. This phase is fully funded through Measure R, the Los Angeles County half-cent sales tax increase that voters approved to fund transportation projects. Eventually the Gold Line will reach the Inland Empire.

https://arcadiahistory.andornot.com/en/permalink/newspaper32103
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32300AN
Collection
Newspaper Index
Less detail

A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper32557
Newspaper
Pasadena Star News,
Date
October 4, 2011
Pages
p. A3

Construction of the Metro Gold Line Foothill Extension bridge, that will span the 210 Freeway, has begun. Preparation of the giant column supports included drilling over 100 feet into the ground. The 584-foot Gold Line bridge will take shape by December. It replaces an old railroad bridge across the freeway, which was built about 1969 and torn down in 1997, said Gary Baker, director of construction for the Metro Gold Line Foothill Extension Construction Authority. The bridge's design has been controversial, as some say it is not representative of the origins of the area. The entire bridge is slated to be finished summer 2012.

https://arcadiahistory.andornot.com/en/permalink/newspaper32566
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
32765AN
Collection
Newspaper Index
Less detail

Metro Gold Line Construction Authority agrees to pay $24 million for a commercial property in Monrovia, to be used as a maintenance yard for the Pasadena to Azusa light rail extension. The 4.5 acres of land, on the southwest corner of Evergreen and Shamrock Avenues, is owned by George Brokate of Excalibur Holdings.

https://arcadiahistory.andornot.com/en/permalink/newspaper32831
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Subjects
Brokate, George
Light rail trains
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Transportation
Item ID
33028AN
Collection
Newspaper Index
Less detail

Local transit authorities are preparing to move forward with the Gold Line Foothill Extension to the Azusa-Glendora border and local cities are planning to place residential and commercial developments along the line. Those developments are intended to prepare for future population growth. The first phase of the extension is slated to be completed by 2014, adding new stops in Arcadia, Monrovia, Duarte, Irwindale and Azusa. Some plans near those stops could be scaled back due to the down economy. Arcadia officials are looking to build commercial developments centered on a planned station just east of Santa Anita Avenue. Arcadia's challenge will be land acquisition. Because Arcadia has ordinances limiting the use of eminent domain, Arcadia officials have to rely on negotiating land deals, a difficult process with limited redevelopment funds.

https://arcadiahistory.andornot.com/en/permalink/newspaper32082
Newspaper
Pasadena Star News
Date
June 6, 2010
Pages
p. A1
Newspaper
Pasadena Star News
Date
June 6, 2010
Pages
p. A1
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Redevelopment
Item ID
32279AN
Collection
Newspaper Index
Less detail

Elected officials from San Gabriel Valley foothill cities are angry after being told the second phase of the Gold Line Extension project (from Azusa to Claremont) will be given zero dollars from Measure R, despite an aggressive funding plan for other projects in Los Angeles, as proposed by the Metropolitan Transportation Authority (MTA). MTA staff wants to make permanent Measure R--the half cent sales tax passed by voters in 2008 that expires in 2039--to fund a list of transportation projects across the southland.

https://arcadiahistory.andornot.com/en/permalink/newspaper33075
Newspaper
Pasadena Star News
Date
June 27, 2012
Pages
p. A4
Newspaper
Pasadena Star News
Date
June 27, 2012
Pages
p. A4
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33272AN
Collection
Newspaper Index
Less detail

Gold Line Extension for the phase from Azusa to Claremont is uncertain. The Metropolitan Transportation Authority (MTA) board has approved asking county voters to extend the Measure R half-cent sales tax for 30 years beyond its expiration date--without a strategy to fund the Gold Line Foothill Extension to Claremont. The Gold Line's 11.5 mile Pasadena-to-Azusa segment is already funded and scheduled for completion in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper33078
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33275AN
Collection
Newspaper Index
Less detail

Gold Line Foothill Extension Authority officials unveiled a San Gabriel Valley-themed design for a rail bridge honoring local wildlife and native cultures. The span of the 739-foot bridge will stretch diagonally across the 210 Freeway to Santa Anita Avenue in Arcadia. It will be adorned by four basket-shaped columns and the bridge itself will have individual grooves resembling the scales of a snake. Andrew Leicester is the artist and designer.

https://arcadiahistory.andornot.com/en/permalink/newspaper31849
Newspaper
Pasadena Star News
Date
December 19, 2009
Pages
p. A1
Newspaper
Pasadena Star News
Date
December 19, 2009
Pages
p. A1
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Public Art
Item ID
32046AN
Collection
Newspaper Index
Less detail

Gold Line Bridge over the 210 Foothill Freeway is progressing and artist Andrew Leicester, creator of the woven Native American basket design, approves. The final details of the $18.6 million bridge, including lighting and landscaping, will be completed next month.

https://arcadiahistory.andornot.com/en/permalink/newspaper33261
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33458AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

Santa Anita Avenue's Gold Line Bridge was dedicated Tuesday, December 1. Bridge was built by taxpayers of Arcadia, funded by Measure A. The Gold Line Grade Separation Bond Citizen Oversight Committee was on hand for the event.

https://arcadiahistory.andornot.com/en/permalink/newspaper34394
Newspaper
Arcadia Weekly
Date
December 3, 2015
Pages
p. 1
Newspaper
Arcadia Weekly
Date
December 3, 2015
Pages
p. 1
Subjects
Metro Gold Line-Foothill Extension
Light rail trains
Railroads
Transportation
Item ID
34587AN
Collection
Newspaper Index
Less detail

Metropolitan Transportation Agency (MTA) is not considering the Gold Line Foothill Extension from Sierra Madre to Claremont a priority now. County transportation officials recommended the so-called "Subway to the Sea," a proposed extension of the Purple Line out to Santa Monica and a "regional connector" project that would link several rail lines through downtown Los Angeles, as the priorities.

https://arcadiahistory.andornot.com/en/permalink/newspaper31723
Newspaper
Pasadena Star News
Date
September 22, 2009
Pages
p. A4
Newspaper
Pasadena Star News
Date
September 22, 2009
Pages
p. A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Agency (MTA)
Transportation
Item ID
31920AN
Collection
Newspaper Index
Less detail

Artist Andrew Leicester, 61, has been chosen to design a bridge meant to be an iconic gateway to the San Gabriel Valley along the Gold Line Foothill Extension. The bridge will cost an estimated $20-25 million to build. Leicester, who is based in Minneapolis, plans to incorporate artistic traditions from the Native American tribes of the San Gabriel Valley (Chumash and Gabrielenos a.k.a. Tongva), and references to the region's native animal and plant life, into a contemporary structure.

https://arcadiahistory.andornot.com/en/permalink/newspaper31620
Newspaper
Pasadena Star News
Date
August 26, 2009
Pages
p. A3
Newspaper
Pasadena Star News
Date
August 26, 2009
Pages
p. A3
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Public Art
Item ID
31817AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.