Skip header and navigation

20 records – page 1 of 1.

Gold Line Extension for the phase from Azusa to Claremont is uncertain. The Metropolitan Transportation Authority (MTA) board has approved asking county voters to extend the Measure R half-cent sales tax for 30 years beyond its expiration date--without a strategy to fund the Gold Line Foothill Extension to Claremont. The Gold Line's 11.5 mile Pasadena-to-Azusa segment is already funded and scheduled for completion in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper33078
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33275AN
Collection
Newspaper Index
Less detail

The 11.5 mile light rail Gold Line extension from Pasadena to Azusa was awarded to Foothill Transit Constructors. Kiewit-Parsons, a joint venture company, will design and build the project. Funding comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper32468
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Subjects
Contractors
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32667AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension had a ground breaking ceremony at Newcastle Park in Arcadia, for a project that would extend the line from East Pasadena to Azusa, with stops in Arcadia, Monrovia, Duarte and Irwindale. This phase is fully funded through Measure R, the Los Angeles County half-cent sales tax increase that voters approved to fund transportation projects. Eventually the Gold Line will reach the Inland Empire.

https://arcadiahistory.andornot.com/en/permalink/newspaper32103
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32300AN
Collection
Newspaper Index
Less detail

The Metropolitan Transportation Authority (MTA) has voted to fully fund the $690 million Gold Line Foothill Extension, from Pasadena to Azusa, and to complete it by 2014, with money from Measure R. Measure R was approved by voters in the November 2008 election. It created a half-cent county sales tax intended for transportation projects. The MTA has the funding for the first phase of the Gold Line light rail to Azusa. The first phase is an 11-mile extension that includes stops in Arcadia, Monrovia, Duarte, Irwindale and Azusa.

https://arcadiahistory.andornot.com/en/permalink/newspaper31950
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32147AN
Collection
Newspaper Index
Less detail

Local transit authorities are preparing to move forward with the Gold Line Foothill Extension to the Azusa-Glendora border and local cities are planning to place residential and commercial developments along the line. Those developments are intended to prepare for future population growth. The first phase of the extension is slated to be completed by 2014, adding new stops in Arcadia, Monrovia, Duarte, Irwindale and Azusa. Some plans near those stops could be scaled back due to the down economy. Arcadia officials are looking to build commercial developments centered on a planned station just east of Santa Anita Avenue. Arcadia's challenge will be land acquisition. Because Arcadia has ordinances limiting the use of eminent domain, Arcadia officials have to rely on negotiating land deals, a difficult process with limited redevelopment funds.

https://arcadiahistory.andornot.com/en/permalink/newspaper32082
Newspaper
Pasadena Star News
Date
June 6, 2010
Pages
p. A1
Newspaper
Pasadena Star News
Date
June 6, 2010
Pages
p. A1
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Redevelopment
Item ID
32279AN
Collection
Newspaper Index
Less detail

Elected officials from San Gabriel Valley foothill cities are angry after being told the second phase of the Gold Line Extension project (from Azusa to Claremont) will be given zero dollars from Measure R, despite an aggressive funding plan for other projects in Los Angeles, as proposed by the Metropolitan Transportation Authority (MTA). MTA staff wants to make permanent Measure R--the half cent sales tax passed by voters in 2008 that expires in 2039--to fund a list of transportation projects across the southland.

https://arcadiahistory.andornot.com/en/permalink/newspaper33075
Newspaper
Pasadena Star News
Date
June 27, 2012
Pages
p. A4
Newspaper
Pasadena Star News
Date
June 27, 2012
Pages
p. A4
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33272AN
Collection
Newspaper Index
Less detail

Officials lobby for Gold Line extension funding. $764 million is needed to finish the final segment of the extension from Azusa-to-Claremont. The Gold Line Construction Authority board this week approved an updated expense plan for the entire 23-mile Pasadena-to-Claremont extension of nearly $1.6 billion, of which $810 million has already been allocated, with full completion planned for 2021. The Metropolitan Transportation Authority has already funded the Gold Line's 11.5 mile, $750 million Pasadena-to-Azusa segment with Measure R revenues, but the $780 million Azusa-to-Claremont segment has yet to be funded.

https://arcadiahistory.andornot.com/en/permalink/newspaper32945
Newspaper
Pasadena Star News
Date
April 28, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 28, 2012
Pages
p. A1, A4
Subjects
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33142AN
Collection
Newspaper Index
Less detail

All aboard: Arcadia gets into training. The Metro Gold Line Station in Arcadia will have a grand opening on Saturday, March 5. The light rail Foothill Extension from Pasadena to Azusa will be offering free rides on March 5.

https://arcadiahistory.andornot.com/en/permalink/newspaper34475
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Subjects
Arcadia Station (Gold Line)
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34667AN
Collection
Newspaper Index
Less detail

Riders head to Pasadena, not Los Angeles. Ridership on the Metro Gold Line Foothill Extension is surpassing expectations. The east Pasadena to Azusa/Glendora extension, which opened March 5 is carrying 4000-5000 riders on weekdays and 3800 to 4000 on Saturday and Sunday. 18 percent of the riders from Arcadia Station went to Pasadena. Other rider statistics are given.

https://arcadiahistory.andornot.com/en/permalink/newspaper34523
Newspaper
Pasadena Star News
Date
April 12, 2016
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
April 12, 2016
Pages
p. A1, A6
Subjects
Light Rail
Mass transit
Metro Gold Line Foothill Extension
Railroads
Trains
Transportation
Item ID
34715AN
Collection
Newspaper Index
Less detail

Metro Foothill Gold Line crossing gates snarl traffic. Faulty part that was recalled worldwide blamed for malfunctions. There are 14 at-grade crossings throughout the 5 cities along the new extension: Arcadia, Monrovia, Duarte, Irwindale and Azusa (has two stations). Arcadia has only one at-grade crossing, but some cars were stuck at the crossing for 5 minutes or more. Each of the cities is working closely with Foothill Gold Line Construction Authority to synchronize traffic signals with train crossings to improve traffic flow.

https://arcadiahistory.andornot.com/en/permalink/newspaper34490
Newspaper
Pasadena Star News
Date
March 12, 2016
Pages
p. A1, A10
Newspaper
Pasadena Star News
Date
March 12, 2016
Pages
p. A1, A10
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Traffic
Transportation
Item ID
34682AN
Collection
Newspaper Index
Less detail

All 14 at-grade rail crossings now complete for Foothill Gold Line, from Pasadena to Azusa. The at-grade crossing in Arcadia is at First Avenue and Santa Clara Street.

https://arcadiahistory.andornot.com/en/permalink/newspaper34011
Newspaper
Arcadia Weekly
Date
October 30, 2014
Pages
p. 12
Newspaper
Arcadia Weekly
Date
October 30, 2014
Pages
p. 12
Subjects
Light rail trains
Metro Gold Line-Foothill Extension
Railroads
Transportation
Item ID
34205AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension officially starts March 5. The extension runs from its current terminus at Sierra Madre Villa Station in Pasadena to Azusa Pacific University/Citrus College Station.

https://arcadiahistory.andornot.com/en/permalink/newspaper34467
Newspaper
Arcadia Weekly
Date
February 18, 2016
Pages
p. 2
Newspaper
Arcadia Weekly
Date
February 18, 2016
Pages
p. 2
Subjects
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34659AN
Collection
Newspaper Index
Less detail

Gold Line Foothill extension opens today. Timeline of history is shown. Parties begin at 10:00 AM for opening ceremony, free rides today. The $1 billion, 11.5-mile extension opens for passenger service. New stations in Arcadia, Monrovia, Duarte, Irwindale, and two in Azusa.

https://arcadiahistory.andornot.com/en/permalink/newspaper34457
Newspaper
Pasadena Star News
Date
March 5, 2016
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
March 5, 2016
Pages
p. A1, A6
Subjects
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34649AN
Collection
Newspaper Index
Less detail

Foothill Gold Line construction update. The Gold Line light rail from Pasadena to Azusa has now surpassed 85% complete. Overview of bridge construction, track completion, grade crossings, and train testing. Substantial completion of entire project remains on schedule for late September 2015, when the project as a whole will be turned over to Metro for pre-revenue service. Metro will decide when the line will open for passenger service.

https://arcadiahistory.andornot.com/en/permalink/newspaper34152
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
34346AN
Collection
Newspaper Index
Less detail

Gold Line bridge across the 210 Freeway just west of Santa Anita Avenue is underway. There is a temporary support structure across the lanes which allows trucks under 15 feet tall to pass freely. When the structure is complete, the Gold Line Construction Authority says the height allowance will be 19 feet. The $18.6 million, 584-foot Gold Line Bridge, the first component of the 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension, started last summer and expected to be completed later this year.

https://arcadiahistory.andornot.com/en/permalink/newspaper32841
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33038AN
Collection
Newspaper Index
Less detail

Mass transit riders take preview run on 11.5 mile Gold Line Foothill extension from is current terminus at Sierra Madre Villa Station (in Pasadena) to the six new stations to the east, including Arcadia Station, Monrovia Station, Duarte Station, Irwindale Station, Downtown Azusa Station, and Azusa Pacific University/Citrus College Station. The new rail cars are stainless steel, made by Kinkisharyo, Model P3010.

https://arcadiahistory.andornot.com/en/permalink/newspaper34456
Newspaper
Pasadena Star News
Date
February 18, 2016
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
February 18, 2016
Pages
p. A1, A6
Subjects
Light rail trains
Kinkisharyo (train manufacturer)
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34648AN
Collection
Newspaper Index
Less detail

Metro adds Gold Line service. Every train will run from Azusa Pacific University/Citrus College to East Los Angeles. Due to unprecedented demand, the Gold Line will run every seven minutes during peak morning and afternoon hours on weekdays. See also Arcadia Weekly, p. 2, June 30, 2016 "LA Metro improves Gold Line; relieves crowding for SGV communities."

https://arcadiahistory.andornot.com/en/permalink/newspaper34589
Newspaper
Pasadena Star News
Date
June 25, 2016
Pages
p. A1, A10
Newspaper
Pasadena Star News
Date
June 25, 2016
Pages
p. A1, A10
Subjects
Light Rail
Mass transit
Metro Gold Line Foothill Extension
Railroads
Trains
Transportation
Item ID
34781AN
Collection
Newspaper Index
Less detail

Santa Anita Avenue's Gold Line Bridge was dedicated Tuesday, December 1. Bridge was built by taxpayers of Arcadia, funded by Measure A. The Gold Line Grade Separation Bond Citizen Oversight Committee was on hand for the event.

https://arcadiahistory.andornot.com/en/permalink/newspaper34394
Newspaper
Arcadia Weekly
Date
December 3, 2015
Pages
p. 1
Newspaper
Arcadia Weekly
Date
December 3, 2015
Pages
p. 1
Subjects
Metro Gold Line-Foothill Extension
Light rail trains
Railroads
Transportation
Item ID
34587AN
Collection
Newspaper Index
Less detail

Arcadia commuters fed up with gridlock at First Avenue at the Gold Line Station, since trains started running through Arcadia in March 2016. City engineers are aware of the problems and public's frustration and looking at ways to improve the signals and wait times.

https://arcadiahistory.andornot.com/en/permalink/newspaper35257
Newspaper
Arcadia Weekly
Date
August 23, 2018
Pages
p. 1, 11
Newspaper
Arcadia Weekly
Date
August 23, 2018
Pages
p. 1, 11
Subjects
Light rail trains
Metro Gold Line
Traffic
Transit
Transportation
Item ID
35446AN
Collection
Newspaper Index
Less detail

A Metro Gold Line deal to purchase land in Monrovia for a maintenance yard for $56 million, from George Brokate, a Marine veteran from Newport Beach, has been reached. This cleared the last major obstacle to the $735 million Pasadena to Azusa Metro Gold Line Foothill Extension. Photo shows the Gold Line bridge over the 210 Freeway in Arcadia under construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper32849
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Subjects
Brokate, George
Light Rail
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Trains
Transportation
Item ID
33046AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.