Skip header and navigation

20 records – page 1 of 1.

Metro Gold Line Foothill Extension Construction Authority announced that structural work is complete for Gold Line Bridge over Interstate 210 Freeway. "The bridge can now stand on its own," said Construction Authority CEO Habib F. Balian. The bridge is a 584-linear foot, $18.6 million rail bridge that helps extend the Gold Line from Pasadena to Azusa, in this first segment.

https://arcadiahistory.andornot.com/en/permalink/newspaper33151
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Subjects
Balian, Habib
Bridges
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
33348AN
Collection
Newspaper Index
Less detail

Foothill Gold Line construction update. The Gold Line light rail from Pasadena to Azusa has now surpassed 85% complete. Overview of bridge construction, track completion, grade crossings, and train testing. Substantial completion of entire project remains on schedule for late September 2015, when the project as a whole will be turned over to Metro for pre-revenue service. Metro will decide when the line will open for passenger service.

https://arcadiahistory.andornot.com/en/permalink/newspaper34152
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
34346AN
Collection
Newspaper Index
Less detail

Foothill Gold Line extension is complete. Metro anticipates starting service between Pasadena and Azusa in the spring. It cost $1 billion.

https://arcadiahistory.andornot.com/en/permalink/newspaper34315
Newspaper
Pasadena Star News
Date
September 24, 2015
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
September 24, 2015
Pages
p. A1, A7
Subjects
Metro Gold Line--Foothill Extension
Balian, Habib
Light rail trains
Railroads
Transportation
Item ID
34508AN
Collection
Newspaper Index
Less detail

Mass transit riders take preview run on 11.5 mile Gold Line Foothill extension from is current terminus at Sierra Madre Villa Station (in Pasadena) to the six new stations to the east, including Arcadia Station, Monrovia Station, Duarte Station, Irwindale Station, Downtown Azusa Station, and Azusa Pacific University/Citrus College Station. The new rail cars are stainless steel, made by Kinkisharyo, Model P3010.

https://arcadiahistory.andornot.com/en/permalink/newspaper34456
Newspaper
Pasadena Star News
Date
February 18, 2016
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
February 18, 2016
Pages
p. A1, A6
Subjects
Light rail trains
Kinkisharyo (train manufacturer)
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34648AN
Collection
Newspaper Index
Less detail

Metro Gold Line Bridge, which represents woven baskets, over the 210 Foothill Freeway near Baldwin Avenue in Arcadia, gets its fifth award. The latest one was "Best Project in Southern California" for highways and bridges from Engineering News-Record, a national trade journal on construction and design. The award was presented to Habib Balian, CEO of Metro Gold Line Foothill Extension Construction Authority. Sharing in the award was AECOM, the lead architectural firm that implemented the concept from artist Andrew Leicester and Skanska USA, the construction contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper33698
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Subjects
Awards
Balian, Habib
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33894AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension moves ahead. Contractor Kiewit Parsons is given full "notice to proceed" to build the 11.5 mile route for the light rail train from Pasadena to Azusa, with a stop in Arcadia, by a planned 2015 completion date.

https://arcadiahistory.andornot.com/en/permalink/newspaper32910
Newspaper
Pasadena Star News
Date
April 5, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 5, 2012
Pages
p. A1, A4
Subjects
Kiewit Parsons
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33107AN
Collection
Newspaper Index
Less detail

Trainspotting in Arcadia. First tests of Gold Line light rail between Pasadena and Azusa start. Metro Gold Line Foothill Extension conducted the first of many clearance tests involving actual Metro Gold Line train from Sierra Madre Villa Station (in Pasadena) to Azusa. The train was a $4 million Ansaldo Breda P2250 with specialized gear to test clearances, wheel/rail interface, rail switches, and Overhead Catenary System.

https://arcadiahistory.andornot.com/en/permalink/newspaper34040
Newspaper
Arcadia Weekly
Date
December 11, 2014
Pages
p. 1, 17
Newspaper
Arcadia Weekly
Date
December 11, 2014
Pages
p. 1, 17
Subjects
Light rail trains
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34234AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension Construction Authority opened bidding yesterday on Phase 2A of the light rail's extension toward Azusa, which would make a stop in Arcadia. The project is estimated to cost more than $450 million with a completion date in 2017. Measure R guarantees full funding for the Gold Line Extension minus a gap of $500,000. With possible help from a private investment, the completion could be moved up to 2013.

https://arcadiahistory.andornot.com/en/permalink/newspaper32161
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32358AN
Collection
Newspaper Index
Less detail

Completion of the Gold Line Bridge over the 210 Foothill Freeway in Arcadia is celebrated. The $18.6 million bridge, completed on time and on budget, is only one element of the $1.2 billion eastward extension of the Gold Line through Arcadia, Monrovia, Duarte, Irwindale, and Azusa. Andrew Leicester is the artist and designer of the bridge baskets.

https://arcadiahistory.andornot.com/en/permalink/newspaper33270
Newspaper
Arcadia Weekly
Date
December 13, 2012
Pages
p. 1, 18
Newspaper
Arcadia Weekly
Date
December 13, 2012
Pages
p. 1, 18
Subjects
Balian, Habib
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33467AN
Collection
Newspaper Index
Less detail

Railroads-Light Rail (Metro Gold Line, L-Line, Blue Line, A-Line)

https://arcadiahistory.andornot.com/en/permalink/subject291
Contents
Original name of the light rail was the Gold Line. Later, Gold Line was temporarily renamed L-Line and officially renamed A-Line aka Blue Line effective June 16, 2023. 1. Metro Gold Line Foothill Extension, Winter 2011. A 2-sided information flyer including quick facts, project funding, constructio…
Contents
Original name of the light rail was the Gold Line. Later, Gold Line was temporarily renamed L-Line and officially renamed A-Line aka Blue Line effective June 16, 2023.
1. Metro Gold Line Foothill Extension, Winter 2011. A 2-sided information flyer including quick facts, project funding, construction authority background that accompanied a model of the Metro Gold Line on display at the library starting in early 2011.
2. Metro Gold Line Extension information in a supplement called "Civic Leadership" in the Pasadena Star News, January 31, 2011. "Once the environmental process is completed in 2012, the project will be ready for funding at the local and federal levels. Metro has made funding the Foothill Extension from Azusa to Montclair a priority project for the agency.
3. Memo from Jason Kruckeberg, Asst. City Manager / Development Services Director and Phil Wray, Deputy Director of Development Services/City Engineer to Mayor and City Council re: Discussion of Gold Line Project Status-City's Commitments and Progress Review. August 16, 2011.
4. Artist renderings of future Arcadia Station and I-210 Gold Line Bridge (to resemble weaved baskets).
5. Introducing six new stations in five cities--Arcadia, Monrovia, Duarte, Irwindale, Azusa-Alameda and Azusa-Citrus. Construction completion on track for 2015. Habib F. Balian, CEO of Metro Gold Line Foothill Extension Construction Authority is pictured. An award winning team of contractors and engineers include Skanska, Hill International, Jacobs, Patterson & Associates, Inc.
6. Staff report from Jason Kruckeberg to Mayor and City Council, April 3, 2012 re: report, discussion and direction regarding Gold Line parking structure and transit plaza, with drawings.
7. Three train bridges, station coming. Mountain Views News, p. 6, February 16, 2013.
8. Foothill Gold Line extension updates. Arcadia Weekly, p. 8, February 21, 2013. Updates on design work, demolition, station locations.
9. Santa Anita Bridge groundbreaking.Mountain Views News, p. 7, April 20, 2013.
10. Gold Line construction extends closure of Colorado Boulevard, Pasadena Star News, p. A3, May 4, 2013.
11. Gold Line bridge project to conclude on Colorado Boulevard. Nearly five months of construction ends, but heavy work to begin on Santa Anita Avenue. Pasadena Star News, p. A10. May 29, 2013.
12. Gold Line construction moving forward. First Avenue in Arcadia to open by the end of March. Arcadia Weekly, March 13, 2014.
13. Gold Line station art revealed, April 29, 2014. Retrieved from http://arcadiachamber.org on May 1, 2014.
14. Foothill Gold Line Pasadena to Azusa Update. Construction (bridges, at-grade crossings) continues on time and on budget for a September 2015 turn-over to Metro. Mountain Views News, Section B-p. 1, June 6, 2014.
15. Downtown Arcadia intersection at Huntington and Second will be closed for Gold Line construction, August 6, 2014. Retrieved from www.pasadenastarnews.com on August 11, 2014.
16. Chamber's key role in Gold Line station by Scott Hettrick, August 24, 2015. Retrieved from ArcadiaCAChamber.org on August 25, 2015.
17. Foothill Gold Line Newsletter. Third quarter 2014, with construction update and inserts about Arcadia Station (station artist Michael Davis) and Who Knew Building a Light Rail Track Could Be So Interesting?
18. A-C. 18A. City of Arcadia Holiday Tree Lighting and Dedication December 5, 2015 at Arcadia Transit Plaza. 18B. Arcadia Transit Plaza Dedication Ceremony November 6, 2014. 18C. Arcadia's Grand Opening Celebrationg. Gold Line is coming to Arcadia Saturday, March 5, 2016-Ribbon cutting and station celebration (2 copies).
19. Metro to offer free rides on new Gold Line extension March 5: community events planned at five stations. Arcadia Station at 201 N. First Avenue. Arcadia Weekly, February 25, 2016.
20. Gold Line extension unlikely to affect big traffic jams: history shows trains won't impact freeways. Pasadena Star News, March 2, 2016.
21.Two articles. Where the gold train takes you. Riding the new Gold Line Foothill Extension? Check out 21 activities, local attractions. Art at new Gold Line stations tells cities' stories. Pasadena Star News, March 1, 2016.
22. Opening Day of Metro Gold Line Arcadia Station marketing items: Metro Map & Pocket Guide; Metro Rider's Guide; Arcadia Shop dine stay enjoy coupon book; What is Tap? Instructional Coloring Book; Celebrate the grand opening March 5, 2016 flyer; Heads up watch for trains perforated train model of Kinkisharyo P3010.
23. The ABCs of the Gold Line. Arcadia Weekly, March 3, 2016.
24. All aboard! Metro's Gold Line comes a long way to connect Pasadena to Azusa on Saturday. Pasadena Weekly, March 3, 2016.
25. City of Arcadia celebrates opening of the Gold Line Extension. Arcadia Transit introduces new shuttle service in conjunction with Metro Gold Line opening. Mountain Views News, February 27, 2016.
26. Gold Line fuels nearby projects: extension generating money for area cities. Pasadena Star News, p. A1, A5, February 29, 2016.
27. Wheels: Go east young man: Gold Line opening ceremony prompts historic musings on the Atchison, Topeka and the Santa Fe. Pasadena Weekly, p. 14, March 3, 2016. By Lauren Holland.
28. L Line (Gold) Metro Rail Schedule, Metro Rail Azusa-Union Station-East LA, effective April 9, 2023.
29. A-B. 29A. June 2023 map of all Metro rail lines, Metro busway routes, regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). 29B. A Line Metro Rail schedule effective June 16, 2023 on two sheets. Includes map, connections and parking.
30. A-D. 30A. Meet the Line Letters - Nuevos Nombres. Folded map of Metro Rail & Busway. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Explanations in English and Spanish. Dated October 2022. 30B. Metro rail is growing! Brochure explaining changes in names, stations, and routes when Metro completes the Regional Connector Transit Project on June 16, 2023. Includes map. In English and Spanish. 30C. Meet the new lineup = Conozca nuestra neva alineacion. Folded map of Metro Rail and Busway routes. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Explanations In English and Spanish. Dated June 2023. 30D. Go Metro map & pocket guide. Folded map of Metro Rail & Busway. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Includes information on fares, hours, and important contacts. Dated August 2023.
Subjects
Railroads-Light Rail-Metro Gold Line
Railroads-Light Rail-L Line
Railroads-Light Rail-Blue Line
Railroads-Light Rail-A Line
Item ID
293AF
Collection
Subject Files
Less detail

All aboard: Arcadia gets into training. The Metro Gold Line Station in Arcadia will have a grand opening on Saturday, March 5. The light rail Foothill Extension from Pasadena to Azusa will be offering free rides on March 5.

https://arcadiahistory.andornot.com/en/permalink/newspaper34475
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Subjects
Arcadia Station (Gold Line)
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34667AN
Collection
Newspaper Index
Less detail

Rail project in final stages. Test ongoing. New train line extensions will connect Azusa to Santa Monica.

https://arcadiahistory.andornot.com/en/permalink/newspaper34254
Newspaper
Pasadena Star News
Date
July 9, 2015
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 9, 2015
Pages
p. A1, A4
Subjects
Expo Line Phase 2
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
34448AN
Collection
Newspaper Index
Less detail

Gold Line construction moving forward on schedule. First Avenue in Arcadia to open by the end of March. See hard copy VF "Railroads-Light Rail-Metro Gold Line."

https://arcadiahistory.andornot.com/en/permalink/newspaper33776
Newspaper
Arcadia Weekly
Date
March 13, 2014
Pages
p. 1, 6
Newspaper
Arcadia Weekly
Date
March 13, 2014
Pages
p. 1, 6
Subjects
Gold Line
Light Rail
Trains
Transportation
Item ID
33971AN
Collection
Newspaper Index
Less detail

Gold Line measure proposed. Supporters of the Metro Gold Line Extension through San Gabriel Valley are campaigning in Sacramento this week for legislation that would help create a new Gold Line authority. The new authority would provide for a 15-member board of representatives from the so-called Phase II cities, including Arcadia and Monrovia.

https://arcadiahistory.andornot.com/en/permalink/newspaper32716
Newspaper
Arcadia Weekly
Date
September 11, 2003
Pages
p. 1, 18
Newspaper
Arcadia Weekly
Date
September 11, 2003
Pages
p. 1, 18
Subjects
Cooper, Charles
Doyle, Bart
Light rail trains
Liu, Carol
Metro Gold Line Foothill Extension
Transportation
Item ID
32913AN
Collection
Newspaper Index
Less detail

Foothill Metro Gold Line wins four industry awards, including Outstanding Rail Project of the Year, Sustainability Excellence Distinction Award.

https://arcadiahistory.andornot.com/en/permalink/newspaper34664
Newspaper
Arcadia Weekly
Date
September 14, 2016
Pages
p. 2
Newspaper
Arcadia Weekly
Date
September 14, 2016
Pages
p. 2
Subjects
Awards
Metro Gold Line
Item ID
34856AN
Collection
Newspaper Index
Less detail

Taking the A Train: Metro nixing colors. Los Angeles Metropolitan Transportation Authority is getting rid of the colored names of the train lines and switching to letter names. The transition period will begin in about nine months, during which both colors and letters would be used, then the colors will be phased out. The revamped Blue Line to Long Beach will become the A Line. The Red Line subway will become the B Line. Parts of the Green Line will become the C Line. The Purple Line will become the D Line. The Orange Line bus rapid transit in the San Fernando Valley will be the F Line. The Silver Line rapid busway will become the G Line. The Gold Line light rail from Azusa to Los Angeles will be renamed once the downtown Regional Connector is completed at the end of 2021 or early 2022.

https://arcadiahistory.andornot.com/en/permalink/newspaper35351
Newspaper
Pasadena Star News
Date
December 14, 2018
Pages
p. A1, A5
Newspaper
Pasadena Star News
Date
December 14, 2018
Pages
p. A1, A5
Subjects
Los Angeles Metropolitan Transportation Authority
Metro
Trains
Transportation
Item ID
35541AN
Collection
Newspaper Index
Less detail

Metro adds Gold Line service. Every train will run from Azusa Pacific University/Citrus College to East Los Angeles. Due to unprecedented demand, the Gold Line will run every seven minutes during peak morning and afternoon hours on weekdays. See also Arcadia Weekly, p. 2, June 30, 2016 "LA Metro improves Gold Line; relieves crowding for SGV communities."

https://arcadiahistory.andornot.com/en/permalink/newspaper34589
Newspaper
Pasadena Star News
Date
June 25, 2016
Pages
p. A1, A10
Newspaper
Pasadena Star News
Date
June 25, 2016
Pages
p. A1, A10
Subjects
Light Rail
Mass transit
Metro Gold Line Foothill Extension
Railroads
Trains
Transportation
Item ID
34781AN
Collection
Newspaper Index
Less detail

A memorandum of understanding between the Blue Line Construction Authority board and the 13-member Gold Line Phase Two Construction Authority board will determine how much control the 11 cities from Arcadia to Montclair will get over the $1.3 billion rail expansion.

https://arcadiahistory.andornot.com/en/permalink/newspaper26501
Newspaper
Pasadena Star News
Date
October 6, 2003
Pages
p. A1
Newspaper
Pasadena Star News
Date
October 6, 2003
Pages
p. A1
Subjects
Gold Line
Blue line
Metro Rail
Metorlink Trains
Item ID
26702AN
Collection
Newspaper Index
Less detail

The Arcadia city council endorsed the construction of the second phase of the Gold Line as a light rail transit system. Grade level of the major street crossings was discussed.

https://arcadiahistory.andornot.com/en/permalink/newspaper30347
Newspaper
Arcadia Weekly
Date
May 23, 2002
Pages
p. 1
Newspaper
Arcadia Weekly
Date
May 23, 2002
Pages
p. 1
Subjects
Gold Line extension
Light Rail
Metropolitan Transit Authority (MTA)
Transit
Item ID
30533AN
Collection
Newspaper Index
Less detail

Metropolitan Transportation Agency (MTA) is not considering the Gold Line Foothill Extension from Sierra Madre to Claremont a priority now. County transportation officials recommended the so-called "Subway to the Sea," a proposed extension of the Purple Line out to Santa Monica and a "regional connector" project that would link several rail lines through downtown Los Angeles, as the priorities.

https://arcadiahistory.andornot.com/en/permalink/newspaper31723
Newspaper
Pasadena Star News
Date
September 22, 2009
Pages
p. A4
Newspaper
Pasadena Star News
Date
September 22, 2009
Pages
p. A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Agency (MTA)
Transportation
Item ID
31920AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.