Skip header and navigation

20 records – page 1 of 1.

Taking the A Train: Metro nixing colors. Los Angeles Metropolitan Transportation Authority is getting rid of the colored names of the train lines and switching to letter names. The transition period will begin in about nine months, during which both colors and letters would be used, then the colors will be phased out. The revamped Blue Line to Long Beach will become the A Line. The Red Line subway will become the B Line. Parts of the Green Line will become the C Line. The Purple Line will become the D Line. The Orange Line bus rapid transit in the San Fernando Valley will be the F Line. The Silver Line rapid busway will become the G Line. The Gold Line light rail from Azusa to Los Angeles will be renamed once the downtown Regional Connector is completed at the end of 2021 or early 2022.

https://arcadiahistory.andornot.com/en/permalink/newspaper35351
Newspaper
Pasadena Star News
Date
December 14, 2018
Pages
p. A1, A5
Newspaper
Pasadena Star News
Date
December 14, 2018
Pages
p. A1, A5
Subjects
Los Angeles Metropolitan Transportation Authority
Metro
Trains
Transportation
Item ID
35541AN
Collection
Newspaper Index
Less detail

Trainspotting in Arcadia. First tests of Gold Line light rail between Pasadena and Azusa start. Metro Gold Line Foothill Extension conducted the first of many clearance tests involving actual Metro Gold Line train from Sierra Madre Villa Station (in Pasadena) to Azusa. The train was a $4 million Ansaldo Breda P2250 with specialized gear to test clearances, wheel/rail interface, rail switches, and Overhead Catenary System.

https://arcadiahistory.andornot.com/en/permalink/newspaper34040
Newspaper
Arcadia Weekly
Date
December 11, 2014
Pages
p. 1, 17
Newspaper
Arcadia Weekly
Date
December 11, 2014
Pages
p. 1, 17
Subjects
Light rail trains
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34234AN
Collection
Newspaper Index
Less detail

The 11.5 mile light rail Gold Line extension from Pasadena to Azusa was awarded to Foothill Transit Constructors. Kiewit-Parsons, a joint venture company, will design and build the project. Funding comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper32468
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Subjects
Contractors
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32667AN
Collection
Newspaper Index
Less detail

Gold Line Extension for the phase from Azusa to Claremont is uncertain. The Metropolitan Transportation Authority (MTA) board has approved asking county voters to extend the Measure R half-cent sales tax for 30 years beyond its expiration date--without a strategy to fund the Gold Line Foothill Extension to Claremont. The Gold Line's 11.5 mile Pasadena-to-Azusa segment is already funded and scheduled for completion in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper33078
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33275AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension Construction Authority announced that structural work is complete for Gold Line Bridge over Interstate 210 Freeway. "The bridge can now stand on its own," said Construction Authority CEO Habib F. Balian. The bridge is a 584-linear foot, $18.6 million rail bridge that helps extend the Gold Line from Pasadena to Azusa, in this first segment.

https://arcadiahistory.andornot.com/en/permalink/newspaper33151
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Subjects
Balian, Habib
Bridges
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
33348AN
Collection
Newspaper Index
Less detail

The Metropolitan Transportation Authority (MTA) has voted to fully fund the $690 million Gold Line Foothill Extension, from Pasadena to Azusa, and to complete it by 2014, with money from Measure R. Measure R was approved by voters in the November 2008 election. It created a half-cent county sales tax intended for transportation projects. The MTA has the funding for the first phase of the Gold Line light rail to Azusa. The first phase is an 11-mile extension that includes stops in Arcadia, Monrovia, Duarte, Irwindale and Azusa.

https://arcadiahistory.andornot.com/en/permalink/newspaper31950
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32147AN
Collection
Newspaper Index
Less detail

All aboard: Arcadia gets into training. The Metro Gold Line Station in Arcadia will have a grand opening on Saturday, March 5. The light rail Foothill Extension from Pasadena to Azusa will be offering free rides on March 5.

https://arcadiahistory.andornot.com/en/permalink/newspaper34475
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Subjects
Arcadia Station (Gold Line)
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34667AN
Collection
Newspaper Index
Less detail

Gold Line construction moving forward on schedule. First Avenue in Arcadia to open by the end of March. See hard copy VF "Railroads-Light Rail-Metro Gold Line."

https://arcadiahistory.andornot.com/en/permalink/newspaper33776
Newspaper
Arcadia Weekly
Date
March 13, 2014
Pages
p. 1, 6
Newspaper
Arcadia Weekly
Date
March 13, 2014
Pages
p. 1, 6
Subjects
Gold Line
Light Rail
Trains
Transportation
Item ID
33971AN
Collection
Newspaper Index
Less detail

Foothill Metro Gold Line wins four industry awards, including Outstanding Rail Project of the Year, Sustainability Excellence Distinction Award.

https://arcadiahistory.andornot.com/en/permalink/newspaper34664
Newspaper
Arcadia Weekly
Date
September 14, 2016
Pages
p. 2
Newspaper
Arcadia Weekly
Date
September 14, 2016
Pages
p. 2
Subjects
Awards
Metro Gold Line
Item ID
34856AN
Collection
Newspaper Index
Less detail

Mass transit riders take preview run on 11.5 mile Gold Line Foothill extension from is current terminus at Sierra Madre Villa Station (in Pasadena) to the six new stations to the east, including Arcadia Station, Monrovia Station, Duarte Station, Irwindale Station, Downtown Azusa Station, and Azusa Pacific University/Citrus College Station. The new rail cars are stainless steel, made by Kinkisharyo, Model P3010.

https://arcadiahistory.andornot.com/en/permalink/newspaper34456
Newspaper
Pasadena Star News
Date
February 18, 2016
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
February 18, 2016
Pages
p. A1, A6
Subjects
Light rail trains
Kinkisharyo (train manufacturer)
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34648AN
Collection
Newspaper Index
Less detail

Arcadia wrestles with homeless issue. Metro Gold Line is seen as factor by some in the growing numbers camping nearby. In 2016, the Arcadia Station of Metro Gold Line opened and police began seeing a marked increase in calls for service regarding homelessness, said Sergeant Dan Crowther.

https://arcadiahistory.andornot.com/en/permalink/newspaper35544
Newspaper
Pasadena Star News
Date
August 29, 2019
Pages
p. A1, A5
Newspaper
Pasadena Star News
Date
August 29, 2019
Pages
p. A1, A5
Subjects
Arcadia Station
Homeless
Light rail trains
Metro Gold Line
Social problems
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension had a ground breaking ceremony at Newcastle Park in Arcadia, for a project that would extend the line from East Pasadena to Azusa, with stops in Arcadia, Monrovia, Duarte and Irwindale. This phase is fully funded through Measure R, the Los Angeles County half-cent sales tax increase that voters approved to fund transportation projects. Eventually the Gold Line will reach the Inland Empire.

https://arcadiahistory.andornot.com/en/permalink/newspaper32103
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32300AN
Collection
Newspaper Index
Less detail

Metro responds to concerns over paid parking at Arcadia Gold Line Station. It costs $3 to park there but it had been free. Now that there is a cost to parking at Arcadia Station, there are more open spaces and this was Metro's anticipated and desired effect.

https://arcadiahistory.andornot.com/en/permalink/newspaper35537
Newspaper
Arcadia Weekly
Date
June 27, 2019
Pages
p. 3
Newspaper
Arcadia Weekly
Date
June 27, 2019
Pages
p. 3
Subjects
Arcadia Gold Line Station
Light rail trains
Metro Gold Line
Transportation
Collection
Newspaper Index
Less detail

Arcadia Gold Line plaza design chosen. Concept is "Town Square" for the transit plaza adjacent to the Gold Line Arcadia station and parking lot, to be built on the northwest corner of First Avenue, across Santa Clara Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper33095
Newspaper
Mountain Views News
Date
July 14, 2012
Pages
p. 6
Newspaper
Mountain Views News
Date
July 14, 2012
Pages
p. 6
Subjects
Gold Line--Arcadia Station
Item ID
33292AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension Construction Authority Board of Directors adopts new policies to enhance agency's transparency and accountability.

https://arcadiahistory.andornot.com/en/permalink/newspaper32643
Newspaper
Arcadia Weekly,
Date
November 24, 2011
Pages
p. 6
Newspaper
Arcadia Weekly,
Date
November 24, 2011
Pages
p. 6
Subjects
Metro Gold Line Foothill Extension Construction Authority--policies
Item ID
32840AN
Collection
Newspaper Index
Less detail

First Avenue at Santa Clara Street in Arcadia closed September 9, 2013 through February, 2014 for construction of grade crossing improvements, as part of the Metro Gold Line Foothill Extension light rail project in Arcadia. Also, to construct the parking structure and transit plaza adjacent to the crossing, Front Street between Santa Clara Street and Saint Joseph Street, will be permanently closing in September.

https://arcadiahistory.andornot.com/en/permalink/newspaper33608
Newspaper
Arcadia Weekly
Date
September 5, 2013
Pages
p. 1, 23
Newspaper
Arcadia Weekly
Date
September 5, 2013
Pages
p. 1, 23
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33803AN
Collection
Newspaper Index
Less detail

Metro amps up security to protect Arcadia, Monrovia and Pasadena public transportation residents. Metro has added local Los Angeles Police Department law enforcement to patrol the rail and bus lines.

https://arcadiahistory.andornot.com/en/permalink/newspaper34927
Newspaper
Arcadia Weekly
Date
July 6, 2017
Pages
p. 3
Newspaper
Arcadia Weekly
Date
July 6, 2017
Pages
p. 3
Subjects
Metro Gold Line
Light rail trains
Item ID
35117AN
Collection
Newspaper Index
Less detail

Foothill Gold Line construction update. The Gold Line light rail from Pasadena to Azusa has now surpassed 85% complete. Overview of bridge construction, track completion, grade crossings, and train testing. Substantial completion of entire project remains on schedule for late September 2015, when the project as a whole will be turned over to Metro for pre-revenue service. Metro will decide when the line will open for passenger service.

https://arcadiahistory.andornot.com/en/permalink/newspaper34152
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
34346AN
Collection
Newspaper Index
Less detail

California Philharmonic's (Cal Phil) "Be Instrumental" Holiday Haul 2011 will benefit Union Station Homeless. Services have been extended through December 21.

https://arcadiahistory.andornot.com/en/permalink/newspaper32682
Newspaper
Arcadia Weekly
Date
December 15, 2011
Pages
p. 6
Newspaper
Arcadia Weekly
Date
December 15, 2011
Pages
p. 6
Subjects
California Philharmonic (Cal Phil)
Charity
Item ID
32879AN
Collection
Newspaper Index
Less detail

Lack of train cars may delay the openings of the Expo Line Phase 2 from Culver City to Santa Monica and the Gold Line Foothill Extension from Pasadena to Azusa. Metro reports delivery of rail cars won't be complete until January 2017, while construction of the extensions should be done July/August (Expo) and late September (Gold Line), of 2015. The builder of the train cars is Kinkisharyo International, a Japanese company that is assembling the light rail trains in Palmdale, California. The Expo Line needs 42 cars and the Gold Line needs 15.

https://arcadiahistory.andornot.com/en/permalink/newspaper34025
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Subjects
Balian, Habib
Kinkisharyo International
Light rail trains
Metro Gold Line Foothill Extension
Item ID
34219AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.