Skip header and navigation

20 records – page 1 of 1.

Gold Line has a new name. Now it is called the L Line, but it will be split to become the A Line or the E Line in 2022 after Metro's Regional Connector Project is finished.

https://arcadiahistory.andornot.com/en/permalink/newspaper35752
Newspaper
Pasadena Star News
Date
April 27, 2020
Pages
p. A3
Newspaper
Pasadena Star News
Date
April 27, 2020
Pages
p. A3
Subjects
Light Rail
Metro Gold Line
Trains
Transportation
Collection
Newspaper Index
Less detail

The county Metropolitan Transportation Authority will sell naming rights to all rail lines, bus lines, and transit stations, such as the Gold Line Monrovia Station (in photo) and Foothill Gold Line Arcadia Station (in photo). The Corporate Sponsorship/Naming Rights Program was approved by the Metro board. CEO Phil Washington wants to stretch revenue; board member objects to commercialization.

https://arcadiahistory.andornot.com/en/permalink/newspaper34730
Newspaper
Pasadena Star News
Date
December 8, 2016
Pages
p. A1, A13
Newspaper
Pasadena Star News
Date
December 8, 2016
Pages
p. A1, A13
Subjects
Bonin, Mike
Kuehl, Sheila
Metro Gold Line
Metropolitan Transportation Authority
Washington, Phil
Item ID
34922AN
Collection
Newspaper Index
Less detail

Metropolitan Transportation Agency (MTA) is not considering the Gold Line Foothill Extension from Sierra Madre to Claremont a priority now. County transportation officials recommended the so-called "Subway to the Sea," a proposed extension of the Purple Line out to Santa Monica and a "regional connector" project that would link several rail lines through downtown Los Angeles, as the priorities.

https://arcadiahistory.andornot.com/en/permalink/newspaper31723
Newspaper
Pasadena Star News
Date
September 22, 2009
Pages
p. A4
Newspaper
Pasadena Star News
Date
September 22, 2009
Pages
p. A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Agency (MTA)
Transportation
Item ID
31920AN
Collection
Newspaper Index
Less detail

Trainspotting in Arcadia. First tests of Gold Line light rail between Pasadena and Azusa start. Metro Gold Line Foothill Extension conducted the first of many clearance tests involving actual Metro Gold Line train from Sierra Madre Villa Station (in Pasadena) to Azusa. The train was a $4 million Ansaldo Breda P2250 with specialized gear to test clearances, wheel/rail interface, rail switches, and Overhead Catenary System.

https://arcadiahistory.andornot.com/en/permalink/newspaper34040
Newspaper
Arcadia Weekly
Date
December 11, 2014
Pages
p. 1, 17
Newspaper
Arcadia Weekly
Date
December 11, 2014
Pages
p. 1, 17
Subjects
Light rail trains
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34234AN
Collection
Newspaper Index
Less detail

Railroads-Light Rail (Metro Gold Line, L-Line, Blue Line, A-Line)

https://arcadiahistory.andornot.com/en/permalink/subject291
Contents
Original name of the light rail was the Gold Line. Later, Gold Line was temporarily renamed L-Line and officially renamed A-Line aka Blue Line effective June 16, 2023. 1. Metro Gold Line Foothill Extension, Winter 2011. A 2-sided information flyer including quick facts, project funding, constructio…
Contents
Original name of the light rail was the Gold Line. Later, Gold Line was temporarily renamed L-Line and officially renamed A-Line aka Blue Line effective June 16, 2023.
1. Metro Gold Line Foothill Extension, Winter 2011. A 2-sided information flyer including quick facts, project funding, construction authority background that accompanied a model of the Metro Gold Line on display at the library starting in early 2011.
2. Metro Gold Line Extension information in a supplement called "Civic Leadership" in the Pasadena Star News, January 31, 2011. "Once the environmental process is completed in 2012, the project will be ready for funding at the local and federal levels. Metro has made funding the Foothill Extension from Azusa to Montclair a priority project for the agency.
3. Memo from Jason Kruckeberg, Asst. City Manager / Development Services Director and Phil Wray, Deputy Director of Development Services/City Engineer to Mayor and City Council re: Discussion of Gold Line Project Status-City's Commitments and Progress Review. August 16, 2011.
4. Artist renderings of future Arcadia Station and I-210 Gold Line Bridge (to resemble weaved baskets).
5. Introducing six new stations in five cities--Arcadia, Monrovia, Duarte, Irwindale, Azusa-Alameda and Azusa-Citrus. Construction completion on track for 2015. Habib F. Balian, CEO of Metro Gold Line Foothill Extension Construction Authority is pictured. An award winning team of contractors and engineers include Skanska, Hill International, Jacobs, Patterson & Associates, Inc.
6. Staff report from Jason Kruckeberg to Mayor and City Council, April 3, 2012 re: report, discussion and direction regarding Gold Line parking structure and transit plaza, with drawings.
7. Three train bridges, station coming. Mountain Views News, p. 6, February 16, 2013.
8. Foothill Gold Line extension updates. Arcadia Weekly, p. 8, February 21, 2013. Updates on design work, demolition, station locations.
9. Santa Anita Bridge groundbreaking.Mountain Views News, p. 7, April 20, 2013.
10. Gold Line construction extends closure of Colorado Boulevard, Pasadena Star News, p. A3, May 4, 2013.
11. Gold Line bridge project to conclude on Colorado Boulevard. Nearly five months of construction ends, but heavy work to begin on Santa Anita Avenue. Pasadena Star News, p. A10. May 29, 2013.
12. Gold Line construction moving forward. First Avenue in Arcadia to open by the end of March. Arcadia Weekly, March 13, 2014.
13. Gold Line station art revealed, April 29, 2014. Retrieved from http://arcadiachamber.org on May 1, 2014.
14. Foothill Gold Line Pasadena to Azusa Update. Construction (bridges, at-grade crossings) continues on time and on budget for a September 2015 turn-over to Metro. Mountain Views News, Section B-p. 1, June 6, 2014.
15. Downtown Arcadia intersection at Huntington and Second will be closed for Gold Line construction, August 6, 2014. Retrieved from www.pasadenastarnews.com on August 11, 2014.
16. Chamber's key role in Gold Line station by Scott Hettrick, August 24, 2015. Retrieved from ArcadiaCAChamber.org on August 25, 2015.
17. Foothill Gold Line Newsletter. Third quarter 2014, with construction update and inserts about Arcadia Station (station artist Michael Davis) and Who Knew Building a Light Rail Track Could Be So Interesting?
18. A-C. 18A. City of Arcadia Holiday Tree Lighting and Dedication December 5, 2015 at Arcadia Transit Plaza. 18B. Arcadia Transit Plaza Dedication Ceremony November 6, 2014. 18C. Arcadia's Grand Opening Celebrationg. Gold Line is coming to Arcadia Saturday, March 5, 2016-Ribbon cutting and station celebration (2 copies).
19. Metro to offer free rides on new Gold Line extension March 5: community events planned at five stations. Arcadia Station at 201 N. First Avenue. Arcadia Weekly, February 25, 2016.
20. Gold Line extension unlikely to affect big traffic jams: history shows trains won't impact freeways. Pasadena Star News, March 2, 2016.
21.Two articles. Where the gold train takes you. Riding the new Gold Line Foothill Extension? Check out 21 activities, local attractions. Art at new Gold Line stations tells cities' stories. Pasadena Star News, March 1, 2016.
22. Opening Day of Metro Gold Line Arcadia Station marketing items: Metro Map & Pocket Guide; Metro Rider's Guide; Arcadia Shop dine stay enjoy coupon book; What is Tap? Instructional Coloring Book; Celebrate the grand opening March 5, 2016 flyer; Heads up watch for trains perforated train model of Kinkisharyo P3010.
23. The ABCs of the Gold Line. Arcadia Weekly, March 3, 2016.
24. All aboard! Metro's Gold Line comes a long way to connect Pasadena to Azusa on Saturday. Pasadena Weekly, March 3, 2016.
25. City of Arcadia celebrates opening of the Gold Line Extension. Arcadia Transit introduces new shuttle service in conjunction with Metro Gold Line opening. Mountain Views News, February 27, 2016.
26. Gold Line fuels nearby projects: extension generating money for area cities. Pasadena Star News, p. A1, A5, February 29, 2016.
27. Wheels: Go east young man: Gold Line opening ceremony prompts historic musings on the Atchison, Topeka and the Santa Fe. Pasadena Weekly, p. 14, March 3, 2016. By Lauren Holland.
28. L Line (Gold) Metro Rail Schedule, Metro Rail Azusa-Union Station-East LA, effective April 9, 2023.
29. A-B. 29A. June 2023 map of all Metro rail lines, Metro busway routes, regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). 29B. A Line Metro Rail schedule effective June 16, 2023 on two sheets. Includes map, connections and parking.
30. A-D. 30A. Meet the Line Letters - Nuevos Nombres. Folded map of Metro Rail & Busway. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Explanations in English and Spanish. Dated October 2022. 30B. Metro rail is growing! Brochure explaining changes in names, stations, and routes when Metro completes the Regional Connector Transit Project on June 16, 2023. Includes map. In English and Spanish. 30C. Meet the new lineup = Conozca nuestra neva alineacion. Folded map of Metro Rail and Busway routes. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Explanations In English and Spanish. Dated June 2023. 30D. Go Metro map & pocket guide. Folded map of Metro Rail & Busway. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Includes information on fares, hours, and important contacts. Dated August 2023.
Subjects
Railroads-Light Rail-Metro Gold Line
Railroads-Light Rail-L Line
Railroads-Light Rail-Blue Line
Railroads-Light Rail-A Line
Item ID
293AF
Collection
Subject Files
Less detail

The 11.5 mile light rail Gold Line extension from Pasadena to Azusa was awarded to Foothill Transit Constructors. Kiewit-Parsons, a joint venture company, will design and build the project. Funding comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper32468
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Subjects
Contractors
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32667AN
Collection
Newspaper Index
Less detail

If a 1948 plan by the Rapid Transit Action Group to salvage a portion of the Pacific Electric Red Car system had become a reality, Arcadia and Monrovia would have been enjoying the benefits of light rail transit for the last 54 years. Arcadia Weekly writer Charles Cooper provides historical information and rider statistics of the old rail lines.

https://arcadiahistory.andornot.com/en/permalink/newspaper30506
Newspaper
Arcadia Weekly
Date
August 1, 2002
Pages
p. 9
Newspaper
Arcadia Weekly
Date
August 1, 2002
Pages
p. 9
Subjects
Light Rail
Rapid Transit Action Group
Trains
Transportation - history
Item ID
30693AN
Collection
Newspaper Index
Less detail

The Metropolitan Transportation Authority (MTA) has voted to fully fund the $690 million Gold Line Foothill Extension, from Pasadena to Azusa, and to complete it by 2014, with money from Measure R. Measure R was approved by voters in the November 2008 election. It created a half-cent county sales tax intended for transportation projects. The MTA has the funding for the first phase of the Gold Line light rail to Azusa. The first phase is an 11-mile extension that includes stops in Arcadia, Monrovia, Duarte, Irwindale and Azusa.

https://arcadiahistory.andornot.com/en/permalink/newspaper31950
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32147AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension moves ahead. Contractor Kiewit Parsons is given full "notice to proceed" to build the 11.5 mile route for the light rail train from Pasadena to Azusa, with a stop in Arcadia, by a planned 2015 completion date.

https://arcadiahistory.andornot.com/en/permalink/newspaper32910
Newspaper
Pasadena Star News
Date
April 5, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 5, 2012
Pages
p. A1, A4
Subjects
Kiewit Parsons
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33107AN
Collection
Newspaper Index
Less detail

The Arcadia city council endorsed the construction of the second phase of the Gold Line as a light rail transit system. Grade level of the major street crossings was discussed.

https://arcadiahistory.andornot.com/en/permalink/newspaper30347
Newspaper
Arcadia Weekly
Date
May 23, 2002
Pages
p. 1
Newspaper
Arcadia Weekly
Date
May 23, 2002
Pages
p. 1
Subjects
Gold Line extension
Light Rail
Metropolitan Transit Authority (MTA)
Transit
Item ID
30533AN
Collection
Newspaper Index
Less detail

All aboard: Arcadia gets into training. The Metro Gold Line Station in Arcadia will have a grand opening on Saturday, March 5. The light rail Foothill Extension from Pasadena to Azusa will be offering free rides on March 5.

https://arcadiahistory.andornot.com/en/permalink/newspaper34475
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Subjects
Arcadia Station (Gold Line)
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34667AN
Collection
Newspaper Index
Less detail

Rail project in final stages. Test ongoing. New train line extensions will connect Azusa to Santa Monica.

https://arcadiahistory.andornot.com/en/permalink/newspaper34254
Newspaper
Pasadena Star News
Date
July 9, 2015
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 9, 2015
Pages
p. A1, A4
Subjects
Expo Line Phase 2
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
34448AN
Collection
Newspaper Index
Less detail

Lack of train cars may delay the openings of the Expo Line Phase 2 from Culver City to Santa Monica and the Gold Line Foothill Extension from Pasadena to Azusa. Metro reports delivery of rail cars won't be complete until January 2017, while construction of the extensions should be done July/August (Expo) and late September (Gold Line), of 2015. The builder of the train cars is Kinkisharyo International, a Japanese company that is assembling the light rail trains in Palmdale, California. The Expo Line needs 42 cars and the Gold Line needs 15.

https://arcadiahistory.andornot.com/en/permalink/newspaper34025
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Subjects
Balian, Habib
Kinkisharyo International
Light rail trains
Metro Gold Line Foothill Extension
Item ID
34219AN
Collection
Newspaper Index
Less detail

Foothill Gold Line construction update. The Gold Line light rail from Pasadena to Azusa has now surpassed 85% complete. Overview of bridge construction, track completion, grade crossings, and train testing. Substantial completion of entire project remains on schedule for late September 2015, when the project as a whole will be turned over to Metro for pre-revenue service. Metro will decide when the line will open for passenger service.

https://arcadiahistory.andornot.com/en/permalink/newspaper34152
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
34346AN
Collection
Newspaper Index
Less detail

Ridership on the Gold Line has fallen below expectations. The MTA is now considering a new express service to encourage residents in East Pasadena and Arcadia to take the light rail train.

https://arcadiahistory.andornot.com/en/permalink/newspaper29507
Newspaper
Pasadena Star News
Date
April 18, 2005
Pages
p. A1
Newspaper
Pasadena Star News
Date
April 18, 2005
Pages
p. A1
Subjects
Gold Line
Metropolitan Transportation Authority (MTA)
Commuters
Light rail trains
Item ID
29691AN
Collection
Newspaper Index
Less detail

Gold Line Extension for the phase from Azusa to Claremont is uncertain. The Metropolitan Transportation Authority (MTA) board has approved asking county voters to extend the Measure R half-cent sales tax for 30 years beyond its expiration date--without a strategy to fund the Gold Line Foothill Extension to Claremont. The Gold Line's 11.5 mile Pasadena-to-Azusa segment is already funded and scheduled for completion in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper33078
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33275AN
Collection
Newspaper Index
Less detail

The Metro Blue Line Construction Authority is working to create a joint powers agreement to oversee the construction of the transit line extension from Pasadena to Claremont, with participation from cities along the planned route. That would include Arcadia and Monrovia.

https://arcadiahistory.andornot.com/en/permalink/newspaper30536
Newspaper
Arcadia Weekly
Date
September 5, 2002
Pages
p. 1
Newspaper
Arcadia Weekly
Date
September 5, 2002
Pages
p. 1
Subjects
Gold Line
Light Rail
Metro Blue Line Construction Authority
Trains
Transportation
Item ID
30724AN
Collection
Newspaper Index
Less detail

A Metro Gold Line deal to purchase land in Monrovia for a maintenance yard for $56 million, from George Brokate, a Marine veteran from Newport Beach, has been reached. This cleared the last major obstacle to the $735 million Pasadena to Azusa Metro Gold Line Foothill Extension. Photo shows the Gold Line bridge over the 210 Freeway in Arcadia under construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper32849
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Subjects
Brokate, George
Light Rail
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Trains
Transportation
Item ID
33046AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension had a ground breaking ceremony at Newcastle Park in Arcadia, for a project that would extend the line from East Pasadena to Azusa, with stops in Arcadia, Monrovia, Duarte and Irwindale. This phase is fully funded through Measure R, the Los Angeles County half-cent sales tax increase that voters approved to fund transportation projects. Eventually the Gold Line will reach the Inland Empire.

https://arcadiahistory.andornot.com/en/permalink/newspaper32103
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32300AN
Collection
Newspaper Index
Less detail

Train testing underway throughout summer along the Foothill Gold Line light rail project from Pasadena to Azusa. Testing is currently taking place in Duarte and portions of Irwindale, and will expand to the cities of Pasadena, Arcadia, Monrovia and Azusa over the next several months.

https://arcadiahistory.andornot.com/en/permalink/newspaper34093
Newspaper
Arcadia Weekly
Date
February 12, 2015
Pages
p. 1, 8
Newspaper
Arcadia Weekly
Date
February 12, 2015
Pages
p. 1, 8
Subjects
Metro Gold Line Foothill Extension
Light trail
Trains
Transportation
Item ID
34287AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.