Skip header and navigation

20 records – page 1 of 1.

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper32557
Newspaper
Pasadena Star News,
Date
October 4, 2011
Pages
p. A3

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

New bridge over 210 Freeway taking shape at Santa Anita Avenue offramp. Skanska USA is the lead bridge contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper32835
Newspaper
Arcadia Weekly
Date
February 16, 2012
Pages
p. 1, 4
Newspaper
Arcadia Weekly
Date
February 16, 2012
Pages
p. 1, 4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Skanska USA
Item ID
33032AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

Completion of the Gold Line Bridge over the 210 Foothill Freeway in Arcadia is celebrated. The $18.6 million bridge, completed on time and on budget, is only one element of the $1.2 billion eastward extension of the Gold Line through Arcadia, Monrovia, Duarte, Irwindale, and Azusa. Andrew Leicester is the artist and designer of the bridge baskets.

https://arcadiahistory.andornot.com/en/permalink/newspaper33270
Newspaper
Arcadia Weekly
Date
December 13, 2012
Pages
p. 1, 18
Newspaper
Arcadia Weekly
Date
December 13, 2012
Pages
p. 1, 18
Subjects
Balian, Habib
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33467AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

New Gold Line Bridge in Arcadia defaced with graffiti. Eastbound lane of 210 Freeway could be closed for clean up.

https://arcadiahistory.andornot.com/en/permalink/newspaper33480
Newspaper
Pasadena Star News
Date
April 4, 2013
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 4, 2013
Pages
p. A1, A4
Subjects
Bridges
Metro Gold Line
Vandalism
Item ID
33675AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension Construction Authority announced that structural work is complete for Gold Line Bridge over Interstate 210 Freeway. "The bridge can now stand on its own," said Construction Authority CEO Habib F. Balian. The bridge is a 584-linear foot, $18.6 million rail bridge that helps extend the Gold Line from Pasadena to Azusa, in this first segment.

https://arcadiahistory.andornot.com/en/permalink/newspaper33151
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Subjects
Balian, Habib
Bridges
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
33348AN
Collection
Newspaper Index
Less detail

Gold Line bridge work to cause more closures. The construction remains on schedule and will require as many as 20 late-night full eastbound lane closures in the next two months. The final abutment, or end of the bridge, will be poured next week. The full lane closures generally occur from midnight to 5:00 AM, during which traffic will be detoured off the 210 Freeway at Baldwin Avenue and routed along Foothill Boulevard to Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32809
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Item ID
33006AN
Collection
Newspaper Index
Less detail

Gold Line Bridge over the 210 Foothill Freeway is progressing and artist Andrew Leicester, creator of the woven Native American basket design, approves. The final details of the $18.6 million bridge, including lighting and landscaping, will be completed next month.

https://arcadiahistory.andornot.com/en/permalink/newspaper33261
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33458AN
Collection
Newspaper Index
Less detail

Construction of the Metro Gold Line Foothill Extension bridge, that will span the 210 Freeway, has begun. Preparation of the giant column supports included drilling over 100 feet into the ground. The 584-foot Gold Line bridge will take shape by December. It replaces an old railroad bridge across the freeway, which was built about 1969 and torn down in 1997, said Gary Baker, director of construction for the Metro Gold Line Foothill Extension Construction Authority. The bridge's design has been controversial, as some say it is not representative of the origins of the area. The entire bridge is slated to be finished summer 2012.

https://arcadiahistory.andornot.com/en/permalink/newspaper32566
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
32765AN
Collection
Newspaper Index
Less detail

2,100 cubic yards of concrete has been poured now and the 584-foot Gold Line Bridge is taking shape inside the wood forms above the eastbound lanes of the 210 Freeway.

https://arcadiahistory.andornot.com/en/permalink/newspaper33073
Newspaper
Pasadena Star News
Date
June 20, 2012
Pages
p. A3

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

210 Freeway sound wall is finished. The Metro project, which started in 2009, consists of 2 miles of sound walls along westbound and eastbound lanes of the 210 Freeway between Santa Anita Avenue and California Avenue in Arcadia and Monrovia, paid with Measure R funds. The sound walls provide at least 5 decibels of noise reduction. A ribbon cutting ceremony was held. Several Arcadia residents near Victory Chapel on N. First Avenue, where the sound wall ends, are disappointed the barrier doesn't extend farther west.

https://arcadiahistory.andornot.com/en/permalink/newspaper33107
Newspaper
Pasadena Star News
Date
July 17, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
July 17, 2012
Pages
p. A3
Subjects
Los Angeles County Metropolitan Transportation Authority
Noise pollution
Sound Walls
Item ID
33304AN
Collection
Newspaper Index
Less detail

Gold Line bridge across the 210 Freeway just west of Santa Anita Avenue is underway. There is a temporary support structure across the lanes which allows trucks under 15 feet tall to pass freely. When the structure is complete, the Gold Line Construction Authority says the height allowance will be 19 feet. The $18.6 million, 584-foot Gold Line Bridge, the first component of the 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension, started last summer and expected to be completed later this year.

https://arcadiahistory.andornot.com/en/permalink/newspaper32841
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33038AN
Collection
Newspaper Index
Less detail

A Metro Gold Line deal to purchase land in Monrovia for a maintenance yard for $56 million, from George Brokate, a Marine veteran from Newport Beach, has been reached. This cleared the last major obstacle to the $735 million Pasadena to Azusa Metro Gold Line Foothill Extension. Photo shows the Gold Line bridge over the 210 Freeway in Arcadia under construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper32849
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Subjects
Brokate, George
Light Rail
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Trains
Transportation
Item ID
33046AN
Collection
Newspaper Index
Less detail

Metro to improve 210 Freeway barriers, after a series of crashes over the last 2 years involved cars and trucks landing on the Gold Line tracks. Metro plans to install taller, stronger barriers and a detection system on 6 miles of right-of-way down the middle of the 210 Freeway in Pasadena and Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper35243
Newspaper
Mountain Views News
Date
July 28, 2018
Pages
p. 5
Newspaper
Mountain Views News
Date
July 28, 2018
Pages
p. 5
Subjects
210 Foothill Freeway
Light rail trains
Metro Gold Line
Railroads
Transportation
Item ID
35432AN
Collection
Newspaper Index
Less detail

Miss Junior Taiwan Verena Wong, 5, of Arcadia (photo) and Miss Taiwan Paula Wu of Palo Alto together give away toys to preschoolers at La Casa de San Gabriel Community Center. They also presented the center with a $3000 check from Chinatrust Bank.

https://arcadiahistory.andornot.com/en/permalink/newspaper32249
Newspaper
Pasadena Star News
Date
December 4, 2010
Pages
p. A3
Newspaper
Pasadena Star News
Date
December 4, 2010
Pages
p. A3
Subjects
La Casa de San Gabriel Community Center
Wong, Verena
Wu, Paula
Item ID
32448AN
Collection
Newspaper Index
Less detail

Veterans Administration (VA) opens clinic medical offices in May in San Gabriel Valley, in Arcadia, eight years after a VA clinic closed in Pasadena. It is called San Gabriel Valley Community Based Outpatient Clinic and provides--on an interm basis--basic clinical services that do not require surgery, such as physical exams and X-rays. Veterans also will have access to primary care, mental health care, telehealth and basic lab services. It will remain operational for 3-5 years and eventually be replaced by a permanent, full clinic. It is at 7 West Foothill Boulevard.

https://arcadiahistory.andornot.com/en/permalink/newspaper35531
Newspaper
Pasadena Star News
Date
June 27, 2019
Pages
p. A5
Newspaper
Pasadena Star News
Date
June 27, 2019
Pages
p. A5
Subjects
Medicine
San Gabriel Valley Community Based Outpatient Clinic
Veterans Administration (VA)
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.