Skip header and navigation

20 records – page 1 of 1.

L-Line Extension. Claremont Councilman Ed Reece to chair light rail line board, the Foothill Gold Line Construction Authority Board of Directors. The extension of the L-Line (formerly Gold Line) from Glendora to Pomona is 40% finished and scheduled for completion in early 2025. Reece will oversee the extension to Claremont and Montclair. The light rail line serves Arcadia, Pasadena, East Los Angeles and Los Angeles's Chinatown.

https://arcadiahistory.andornot.com/en/permalink/newspaper36156
Newspaper
Pasadena Star News
Date
January 19, 2022
Pages
p. A3, A7
Newspaper
Pasadena Star News
Date
January 19, 2022
Pages
p. A3, A7
Subjects
Foothill Gold Line Construction Authority Board
Light Rail
L-Line (formerly Gold Line)
Trains
Transportation
Collection
Newspaper Index
Less detail

A memorandum of understanding between the Blue Line Construction Authority board and the 13-member Gold Line Phase Two Construction Authority board will determine how much control the 11 cities from Arcadia to Montclair will get over the $1.3 billion rail expansion.

https://arcadiahistory.andornot.com/en/permalink/newspaper26501
Newspaper
Pasadena Star News
Date
October 6, 2003
Pages
p. A1
Newspaper
Pasadena Star News
Date
October 6, 2003
Pages
p. A1
Subjects
Gold Line
Blue line
Metro Rail
Metorlink Trains
Item ID
26702AN
Collection
Newspaper Index
Less detail

The Metropolitan Transportation Authority (MTA) Board approved $10 million for the 24-mile Gold Line Foothill Extension that is going through Arcadia to Claremont. The money comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper31491
Newspaper
Pasadena Star News
Date
May 29, 2009
Pages
p. A1, A14
Newspaper
Pasadena Star News
Date
May 29, 2009
Pages
p. A1, A14
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
31686AN
Collection
Newspaper Index
Less detail

The 13-member MTA board voted to leave the Gold Line Extension off a critical funding list. This delays the construction of the $1.4 billion project , a 24-mile rail link between Pasadena and Montclair, until at least the end of 2009.

https://arcadiahistory.andornot.com/en/permalink/newspaper30901
Newspaper
Pasadena Star News
Date
January 25, 2008
Pages
p. News 1
Newspaper
Pasadena Star News
Date
January 25, 2008
Pages
p. News 1
Subjects
Gold Line extension
Metropolitan Transportation Authority (MTA)
Item ID
31089AN
Collection
Newspaper Index
Less detail

Officials lobby for Gold Line extension funding. $764 million is needed to finish the final segment of the extension from Azusa-to-Claremont. The Gold Line Construction Authority board this week approved an updated expense plan for the entire 23-mile Pasadena-to-Claremont extension of nearly $1.6 billion, of which $810 million has already been allocated, with full completion planned for 2021. The Metropolitan Transportation Authority has already funded the Gold Line's 11.5 mile, $750 million Pasadena-to-Azusa segment with Measure R revenues, but the $780 million Azusa-to-Claremont segment has yet to be funded.

https://arcadiahistory.andornot.com/en/permalink/newspaper32945
Newspaper
Pasadena Star News
Date
April 28, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 28, 2012
Pages
p. A1, A4
Subjects
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33142AN
Collection
Newspaper Index
Less detail

Gold Line Extension for the phase from Azusa to Claremont is uncertain. The Metropolitan Transportation Authority (MTA) board has approved asking county voters to extend the Measure R half-cent sales tax for 30 years beyond its expiration date--without a strategy to fund the Gold Line Foothill Extension to Claremont. The Gold Line's 11.5 mile Pasadena-to-Azusa segment is already funded and scheduled for completion in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper33078
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33275AN
Collection
Newspaper Index
Less detail

The Gold Line Phase Two Construction Authority met at Arcadia City Hall to review the draft agreement submitted by the Blue Line Construction Authority.

https://arcadiahistory.andornot.com/en/permalink/newspaper26738
Newspaper
Pasadena Star News
Date
October 31, 2003
Pages
p. A3
Newspaper
Pasadena Star News
Date
October 31, 2003
Pages
p. A3
Subjects
Gold Line
Metro Rail
Metrolink Trains
Item ID
26940AN
Collection
Newspaper Index
Less detail

Metro Gold Line Construction Authority agrees to pay $24 million for a commercial property in Monrovia, to be used as a maintenance yard for the Pasadena to Azusa light rail extension. The 4.5 acres of land, on the southwest corner of Evergreen and Shamrock Avenues, is owned by George Brokate of Excalibur Holdings.

https://arcadiahistory.andornot.com/en/permalink/newspaper32831
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Subjects
Brokate, George
Light rail trains
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Transportation
Item ID
33028AN
Collection
Newspaper Index
Less detail

A Metro Gold Line deal to purchase land in Monrovia for a maintenance yard for $56 million, from George Brokate, a Marine veteran from Newport Beach, has been reached. This cleared the last major obstacle to the $735 million Pasadena to Azusa Metro Gold Line Foothill Extension. Photo shows the Gold Line bridge over the 210 Freeway in Arcadia under construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper32849
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Subjects
Brokate, George
Light Rail
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Trains
Transportation
Item ID
33046AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

John Fasana, a Duarte City Council member and Metropolitan Transportation Agency (MTA) board member, will introduce a measure today to include the 24-mile Gold Line Extension to Claremont in the MTA's long range transportation plan. To get federal stimulus money, the Gold Line needs to be listed in the MTA's long-range plan. Fasana wants to see the MTA reinforce the commitments made in Measure R, the tax measure that Los Angeles County voters approved to provide more than $700 million for the Gold Line.

https://arcadiahistory.andornot.com/en/permalink/newspaper31418
Newspaper
Pasadena Star News
Date
March 26, 2009
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 26, 2009
Pages
p. A1, A4
Subjects
Fasana, John
Metro Gold Line Extension
Light Rail
Metropolitan Transportation Agency (MTA)
Trains
Item ID
31611AN
Collection
Newspaper Index
Less detail

The Gold Line Foothill Extension Construction Authority has predicted that people will get on the Pasadena-to-Azusa Gold Line extension 9,500 times a day in the year 2030.

https://arcadiahistory.andornot.com/en/permalink/newspaper30547
Newspaper
Pasadena Star News
Date
May 22, 2007
Pages
p. Local 1
Newspaper
Pasadena Star News
Date
May 22, 2007
Pages
p. Local 1
Subjects
Forecasting
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
30735AN
Collection
Newspaper Index
Less detail

The Blue Line Construction Authority met at Arcadia City Hall and voted unanimously to negotiate a deal with San Bernardino Associated Goverments to pay for including Montclair in the Gold line environmental study.

https://arcadiahistory.andornot.com/en/permalink/newspaper25958
Newspaper
Pasadena Star News
Date
August 14, 2003
Pages
p. A3
Newspaper
Pasadena Star News
Date
August 14, 2003
Pages
p. A3
Subjects
Gold Line
Light Rail
Item ID
26159AN
Collection
Newspaper Index
Less detail

When the Gold Line trains leave Pasadena, Arcadia will be the first stop on what will be a 22.5 mile path to Claremont. Station site for the Metrolink trains will be at First Avenue and Santa Clara. The article features information on all the cities where stops will be made. A map is included.

https://arcadiahistory.andornot.com/en/permalink/newspaper24787
Newspaper
Pasadena Star News
Date
December 2, 2002
Pages
p. A8
Newspaper
Pasadena Star News
Date
December 2, 2002
Pages
p. A8
Subjects
Metro Gold Line
Metrolink Trains
Item ID
24982AN
Collection
Newspaper Index
Less detail

The Metropolitan Transportation Authority (MTA) has taken away $10 milion in funding for the Gold Line extension, but officials are determined to build it from Pasadena to Claremont.

https://arcadiahistory.andornot.com/en/permalink/newspaper26982
Newspaper
Pasadena Star News
Date
December 5, 2003
December 6, 2003
Pages
p. A1
Newspaper
Pasadena Star News
Date
December 5, 2003
December 6, 2003
Pages
p. A1
Subjects
Gold Line
Metro Rail
Metrolink Trains
Item ID
27181AN
Collection
Newspaper Index
Less detail

The 11.5 mile light rail Gold Line extension from Pasadena to Azusa was awarded to Foothill Transit Constructors. Kiewit-Parsons, a joint venture company, will design and build the project. Funding comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper32468
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Subjects
Contractors
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32667AN
Collection
Newspaper Index
Less detail

The county Metropolitan Transportation Authority will sell naming rights to all rail lines, bus lines, and transit stations, such as the Gold Line Monrovia Station (in photo) and Foothill Gold Line Arcadia Station (in photo). The Corporate Sponsorship/Naming Rights Program was approved by the Metro board. CEO Phil Washington wants to stretch revenue; board member objects to commercialization.

https://arcadiahistory.andornot.com/en/permalink/newspaper34730
Newspaper
Pasadena Star News
Date
December 8, 2016
Pages
p. A1, A13
Newspaper
Pasadena Star News
Date
December 8, 2016
Pages
p. A1, A13
Subjects
Bonin, Mike
Kuehl, Sheila
Metro Gold Line
Metropolitan Transportation Authority
Washington, Phil
Item ID
34922AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

The city council has decided to appropriate $35,000 toward the design of a light rail bridge over Santa Anita Avenue. This is to pay for early design work needed for an environmental impact report. The bridge project is expected to cost the city $10.7 million which may come from a bond. The Construction Authority would pay $18.4 million bringing total bridge cost to $29.1 million.

https://arcadiahistory.andornot.com/en/permalink/newspaper29512
Newspaper
Pasadena Star News
Date
May 5, 2005
Pages
p. A3

After receiving intense pressure from San Gabriel Valley lawmakers, the county's transportation board, the MTA, finally put the Gold Line extension in its long-term plans. This opens up the possibility of federal funding for the project. With this commitment, the Metropolitan Transportation Authority (MTA) has agreed to provide day-to-day operational funding for the first phase of the Gold Line Foothill extension once it is completed.

https://arcadiahistory.andornot.com/en/permalink/newspaper31763
Newspaper
Pasadena Star News
Date
October 23, 2009
Pages
p. A1, A12
Newspaper
Pasadena Star News
Date
October 23, 2009
Pages
p. A1, A12
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
31960AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.