Skip header and navigation

20 records – page 1 of 1.

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

A Metro Gold Line deal to purchase land in Monrovia for a maintenance yard for $56 million, from George Brokate, a Marine veteran from Newport Beach, has been reached. This cleared the last major obstacle to the $735 million Pasadena to Azusa Metro Gold Line Foothill Extension. Photo shows the Gold Line bridge over the 210 Freeway in Arcadia under construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper32849
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Subjects
Brokate, George
Light Rail
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Trains
Transportation
Item ID
33046AN
Collection
Newspaper Index
Less detail

Gold Line Foothill Extension Authority officials unveiled a San Gabriel Valley-themed design for a rail bridge honoring local wildlife and native cultures. The span of the 739-foot bridge will stretch diagonally across the 210 Freeway to Santa Anita Avenue in Arcadia. It will be adorned by four basket-shaped columns and the bridge itself will have individual grooves resembling the scales of a snake. Andrew Leicester is the artist and designer.

https://arcadiahistory.andornot.com/en/permalink/newspaper31849
Newspaper
Pasadena Star News
Date
December 19, 2009
Pages
p. A1
Newspaper
Pasadena Star News
Date
December 19, 2009
Pages
p. A1
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Public Art
Item ID
32046AN
Collection
Newspaper Index
Less detail

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

Gold Line has a new name. Now it is called the L Line, but it will be split to become the A Line or the E Line in 2022 after Metro's Regional Connector Project is finished.

https://arcadiahistory.andornot.com/en/permalink/newspaper35752
Newspaper
Pasadena Star News
Date
April 27, 2020
Pages
p. A3
Newspaper
Pasadena Star News
Date
April 27, 2020
Pages
p. A3
Subjects
Light Rail
Metro Gold Line
Trains
Transportation
Collection
Newspaper Index
Less detail

Gold Line Bridge over the 210 Foothill Freeway is progressing and artist Andrew Leicester, creator of the woven Native American basket design, approves. The final details of the $18.6 million bridge, including lighting and landscaping, will be completed next month.

https://arcadiahistory.andornot.com/en/permalink/newspaper33261
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
November 14, 2012
Pages
p. A3
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33458AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

New Gold Line Bridge in Arcadia defaced with graffiti. Eastbound lane of 210 Freeway could be closed for clean up.

https://arcadiahistory.andornot.com/en/permalink/newspaper33480
Newspaper
Pasadena Star News
Date
April 4, 2013
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 4, 2013
Pages
p. A1, A4
Subjects
Bridges
Metro Gold Line
Vandalism
Item ID
33675AN
Collection
Newspaper Index
Less detail

Metro Gold Line Construction Authority agrees to pay $24 million for a commercial property in Monrovia, to be used as a maintenance yard for the Pasadena to Azusa light rail extension. The 4.5 acres of land, on the southwest corner of Evergreen and Shamrock Avenues, is owned by George Brokate of Excalibur Holdings.

https://arcadiahistory.andornot.com/en/permalink/newspaper32831
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Subjects
Brokate, George
Light rail trains
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Transportation
Item ID
33028AN
Collection
Newspaper Index
Less detail

L-Line Extension. Claremont Councilman Ed Reece to chair light rail line board, the Foothill Gold Line Construction Authority Board of Directors. The extension of the L-Line (formerly Gold Line) from Glendora to Pomona is 40% finished and scheduled for completion in early 2025. Reece will oversee the extension to Claremont and Montclair. The light rail line serves Arcadia, Pasadena, East Los Angeles and Los Angeles's Chinatown.

https://arcadiahistory.andornot.com/en/permalink/newspaper36156
Newspaper
Pasadena Star News
Date
January 19, 2022
Pages
p. A3, A7
Newspaper
Pasadena Star News
Date
January 19, 2022
Pages
p. A3, A7
Subjects
Foothill Gold Line Construction Authority Board
Light Rail
L-Line (formerly Gold Line)
Trains
Transportation
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

Metro Gold Line Bridge, which represents woven baskets, over the 210 Foothill Freeway near Baldwin Avenue in Arcadia, gets its fifth award. The latest one was "Best Project in Southern California" for highways and bridges from Engineering News-Record, a national trade journal on construction and design. The award was presented to Habib Balian, CEO of Metro Gold Line Foothill Extension Construction Authority. Sharing in the award was AECOM, the lead architectural firm that implemented the concept from artist Andrew Leicester and Skanska USA, the construction contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper33698
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Newspaper
Pasadena Star News
Date
December 6, 2013
Pages
p. A5
Subjects
Awards
Balian, Habib
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33894AN
Collection
Newspaper Index
Less detail

Officials lobby for Gold Line extension funding. $764 million is needed to finish the final segment of the extension from Azusa-to-Claremont. The Gold Line Construction Authority board this week approved an updated expense plan for the entire 23-mile Pasadena-to-Claremont extension of nearly $1.6 billion, of which $810 million has already been allocated, with full completion planned for 2021. The Metropolitan Transportation Authority has already funded the Gold Line's 11.5 mile, $750 million Pasadena-to-Azusa segment with Measure R revenues, but the $780 million Azusa-to-Claremont segment has yet to be funded.

https://arcadiahistory.andornot.com/en/permalink/newspaper32945
Newspaper
Pasadena Star News
Date
April 28, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 28, 2012
Pages
p. A1, A4
Subjects
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33142AN
Collection
Newspaper Index
Less detail

The Gold Line Foothill Extension Construction Authority has predicted that people will get on the Pasadena-to-Azusa Gold Line extension 9,500 times a day in the year 2030.

https://arcadiahistory.andornot.com/en/permalink/newspaper30547
Newspaper
Pasadena Star News
Date
May 22, 2007
Pages
p. Local 1
Newspaper
Pasadena Star News
Date
May 22, 2007
Pages
p. Local 1
Subjects
Forecasting
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
30735AN
Collection
Newspaper Index
Less detail

Artist Andrew Leicester, 61, has been chosen to design a bridge meant to be an iconic gateway to the San Gabriel Valley along the Gold Line Foothill Extension. The bridge will cost an estimated $20-25 million to build. Leicester, who is based in Minneapolis, plans to incorporate artistic traditions from the Native American tribes of the San Gabriel Valley (Chumash and Gabrielenos a.k.a. Tongva), and references to the region's native animal and plant life, into a contemporary structure.

https://arcadiahistory.andornot.com/en/permalink/newspaper31620
Newspaper
Pasadena Star News
Date
August 26, 2009
Pages
p. A3
Newspaper
Pasadena Star News
Date
August 26, 2009
Pages
p. A3
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Public Art
Item ID
31817AN
Collection
Newspaper Index
Less detail

New Gold Line Bridge a wonderful gift. The design of the Foothill Basket Bridge was inspired by the indigenous Native American people and wildlife in San Gabriel Valley. The project created local jobs and the bridge was constructed by Skanska USA.

https://arcadiahistory.andornot.com/en/permalink/newspaper33277
Newspaper
Pasadena Star News
Date
December 19, 2012
Pages
p. A15
Newspaper
Pasadena Star News
Date
December 19, 2012
Pages
p. A15
Subjects
Bridges
Foothill Gold Line Bridge
Kurtz, Cynthia
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33474AN
Collection
Newspaper Index
Less detail

Metropolitan Transportation Agency (MTA) is not considering the Gold Line Foothill Extension from Sierra Madre to Claremont a priority now. County transportation officials recommended the so-called "Subway to the Sea," a proposed extension of the Purple Line out to Santa Monica and a "regional connector" project that would link several rail lines through downtown Los Angeles, as the priorities.

https://arcadiahistory.andornot.com/en/permalink/newspaper31723
Newspaper
Pasadena Star News
Date
September 22, 2009
Pages
p. A4
Newspaper
Pasadena Star News
Date
September 22, 2009
Pages
p. A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Agency (MTA)
Transportation
Item ID
31920AN
Collection
Newspaper Index
Less detail

The proposed site for Arcadia's Gold Line station is just east of Santa Anita Avenue, at the First Avenue/Santa Clara intersection. City leaders want to separate the railroad tracks from the street.

https://arcadiahistory.andornot.com/en/permalink/newspaper28351
Newspaper
Pasadena Star News
Date
May 19, 2004
Pages
p. A3
Newspaper
Pasadena Star News
Date
May 19, 2004
Pages
p. A3
Subjects
Gold Line --Pasadena to Montclair
Light rail trains
Metro Gold Line Foothill Extension
Item ID
28548AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension Construction Authority opened bidding yesterday on Phase 2A of the light rail's extension toward Azusa, which would make a stop in Arcadia. The project is estimated to cost more than $450 million with a completion date in 2017. Measure R guarantees full funding for the Gold Line Extension minus a gap of $500,000. With possible help from a private investment, the completion could be moved up to 2013.

https://arcadiahistory.andornot.com/en/permalink/newspaper32161
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32358AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.