Skip header and navigation

20 records – page 1 of 1.

Construction is stalled on a $11.9 million project to build sound walls on a stretch of the westbound 210 Foothill Freeway, between Baldwin Avenue and Rosemead Boulevard, but work is expected to resume soon. The delay is due to inaccurate design plans that are being modified.

https://arcadiahistory.andornot.com/en/permalink/newspaper31066
Newspaper
Pasadena Star News
Date
June 28, 2008
Pages
p. A1
Newspaper
Pasadena Star News
Date
June 28, 2008
Pages
p. A1
Subjects
210 Foothill Freeway
Acoustics
Caltrans
Noise
Sound Walls
Item ID
31261AN
Collection
Newspaper Index
Less detail

Construction will begin on a 14 foot high sound wall along the westbound lanes of the 210 freeway between Second and Fifth Avenues.

https://arcadiahistory.andornot.com/en/permalink/newspaper21227
Newspaper
Pasadena Star News
Date
July 9, 2001
Pages
p. A1
Newspaper
Pasadena Star News
Date
July 9, 2001
Pages
p. A1
Subjects
Freeways
Item ID
21454AN
Collection
Newspaper Index
Less detail

A temporary sound wall has been built to block the sound of drilling a new well along Baldwin Avenue, south of Colorado Boulevard, in Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper30399
Newspaper
Pasadena Star News
Date
February 8, 2007
Pages
p. Local 2
Newspaper
Pasadena Star News
Date
February 8, 2007
Pages
p. Local 2
Subjects
Noise
Sound
Sound Walls
Water
Wells
Item ID
30586AN
Collection
Newspaper Index
Less detail

Arcadia City Council commissioned Joe Wertheimer to create a pair of relief murals to be installed on freeway sound walls within the city limits.

https://arcadiahistory.andornot.com/en/permalink/newspaper25247
Newspaper
Pasadena Star News
Date
March 3, 2003
Pages
p. A1
Newspaper
Pasadena Star News
Date
March 3, 2003
Pages
p. A1
Subjects
Sound Walls
Wertheimer, Joe
Murals
Item ID
25444AN
Collection
Newspaper Index
Less detail

Part of the 210 Freeway was closed to clean up fuel leaked from a big rig. It happened on the eastbound lanes near Baldwin Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper28304
Newspaper
Pasadena Star News
Date
May 16, 2004
Pages
p. A5

210 Freeway closure returns this week. For second time in a month, motorists face delays during a 5-day shutdown for bridge construction, closing eastbound lanes of the 210 Freeway from the 605 Freeway interchange to Irwindale Avenue. The delays may be more pronounced in the weekday afternoon during peak hours through Pasadena, Arcadia, Monrovia, Duarte, and Irwindale, as the eastbound lanes detour from 6 lanes into 3 lanes.

https://arcadiahistory.andornot.com/en/permalink/newspaper36306
Newspaper
Pasadena Star News
Date
August 15, 2022
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
August 15, 2022
Pages
p. A1, A7
Subjects
Caltrans
Freeways
San Gabriel River Bridge Hinge Replacement Project
Traffic
Collection
Newspaper Index
Less detail

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

New Gold Line Bridge in Arcadia defaced with graffiti. Eastbound lane of 210 Freeway could be closed for clean up.

https://arcadiahistory.andornot.com/en/permalink/newspaper33480
Newspaper
Pasadena Star News
Date
April 4, 2013
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 4, 2013
Pages
p. A1, A4
Subjects
Bridges
Metro Gold Line
Vandalism
Item ID
33675AN
Collection
Newspaper Index
Less detail

A 37-year old Los Angeles man died early Saturday morning after exiting the Foothill Freeway (210) at Baldwin Avenue driving through a perimeter fence and smashing into a concrete wall.

https://arcadiahistory.andornot.com/en/permalink/newspaper30004
Newspaper
Pasadena Star News
Date
April 23, 2006
Pages
p. A4
Newspaper
Pasadena Star News
Date
April 23, 2006
Pages
p. A4
Subjects
Deaths
Automobile crashes
Traffic Accidents
Hernandez, Edmundo, Jr.
Item ID
30191AN
Collection
Newspaper Index
Less detail

Christopher Carl Eastland was killed when his disabled car was struck by a Jeep driven by an alleged drunk driver on the eastbound Foothill Freeway (210).

https://arcadiahistory.andornot.com/en/permalink/newspaper27836
Newspaper
Pasadena Star News
Date
March 6, 2004
Pages
p. A2
Newspaper
Pasadena Star News
Date
March 6, 2004
Pages
p. A2
Subjects
Eastland, Christopher Earl
Automobile Accident
Obituary/death notice
Item ID
28033AN
Collection
Newspaper Index
Less detail

Gold Line bridge work to cause more closures. The construction remains on schedule and will require as many as 20 late-night full eastbound lane closures in the next two months. The final abutment, or end of the bridge, will be poured next week. The full lane closures generally occur from midnight to 5:00 AM, during which traffic will be detoured off the 210 Freeway at Baldwin Avenue and routed along Foothill Boulevard to Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32809
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Item ID
33006AN
Collection
Newspaper Index
Less detail

Monrovia woman, 35, killed in eastbound 210 Freeway shooting, is identified as Bertha Hernandez. A car-to-car shooting occurred and calls to the CHP came in 9:06 AM on Saturday, September 4, 2021, and a solo vehicle crash involving a black Mercedes-Benz at the Baldwin Avenue off-ramp.

https://arcadiahistory.andornot.com/en/permalink/newspaper36031
Newspaper
Pasadena Star News
Date
September 9, 2021
Pages
p. A1
Newspaper
Pasadena Star News
Date
September 9, 2021
Pages
p. A1
Subjects
Crime and Criminals
Deaths
Hernandez, Bertha
Shootings
Collection
Newspaper Index
Less detail

2,100 cubic yards of concrete has been poured now and the 584-foot Gold Line Bridge is taking shape inside the wood forms above the eastbound lanes of the 210 Freeway.

https://arcadiahistory.andornot.com/en/permalink/newspaper33073
Newspaper
Pasadena Star News
Date
June 20, 2012
Pages
p. A3

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

In the first 7 week phase, eastbound Huntington Drive at Second Avenue in Arcadia, has been narrowed to one lane as the Los Angeles County Department of Public Works prepares to begin a seismic retrofit of the overhead train trestle (bridge) for the future Metro Gold Line. During phase 2, westbound Huntington Drive at Second Avenue will be reduced to one lane. It should take 4 months to complete the retrofit.

https://arcadiahistory.andornot.com/en/permalink/newspaper32288
Newspaper
Pasadena Star News
Date
January 8, 2011
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 8, 2011
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Seismic retrofitting
Item ID
32487AN
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

The 13-member MTA board voted to leave the Gold Line Extension off a critical funding list. This delays the construction of the $1.4 billion project , a 24-mile rail link between Pasadena and Montclair, until at least the end of 2009.

https://arcadiahistory.andornot.com/en/permalink/newspaper30901
Newspaper
Pasadena Star News
Date
January 25, 2008
Pages
p. News 1
Newspaper
Pasadena Star News
Date
January 25, 2008
Pages
p. News 1
Subjects
Gold Line extension
Metropolitan Transportation Authority (MTA)
Item ID
31089AN
Collection
Newspaper Index
Less detail

A proposed 739-feet bridge to span the eastbound 210 freeway diagonally from Santa Anita Avenue may become a landmark gateway sign welcoming people to the San Gabriel Valley. If Measure R funding comes through for this project, construction could begin in Fall 2010. Artists are being asked to submit proposals for the bridge design by the end of next month. Total cost of the bridge is estimated at $20 million and selected artists will receive a $20,000 budget to design the bridge.

https://arcadiahistory.andornot.com/en/permalink/newspaper31421
Newspaper
Pasadena Star News
Date
March 28, 2009
Pages
p. A1
Newspaper
Pasadena Star News
Date
March 28, 2009
Pages
p. A1
Subjects
Artists
Bridges (proposed)
Landmarks
Metro Gold Line Foothill Extension
Item ID
31614AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.