Skip header and navigation

20 records – page 1 of 1.

Mass transit riders take preview run on 11.5 mile Gold Line Foothill extension from is current terminus at Sierra Madre Villa Station (in Pasadena) to the six new stations to the east, including Arcadia Station, Monrovia Station, Duarte Station, Irwindale Station, Downtown Azusa Station, and Azusa Pacific University/Citrus College Station. The new rail cars are stainless steel, made by Kinkisharyo, Model P3010.

https://arcadiahistory.andornot.com/en/permalink/newspaper34456
Newspaper
Pasadena Star News
Date
February 18, 2016
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
February 18, 2016
Pages
p. A1, A6
Subjects
Light rail trains
Kinkisharyo (train manufacturer)
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34648AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill train set to roll on March 5. The 11.5 mile extension from East Pasadena's Sierra Madre Villa Station to Azusa/Glendora border is expected to have 13,600 riders per day and trains to arrive every 12 minutes. The new stations are Arcadia, Monrovia, Duarte/City of Hope, Irwindale, Azusa Downtown, and Azusa Pacific University.

https://arcadiahistory.andornot.com/en/permalink/newspaper34354
Newspaper
Pasadena Star News
Date
October 23, 2015
Pages
p. A1, A5
Newspaper
Pasadena Star News
Date
October 23, 2015
Pages
p. A1, A5
Subjects
Metro Gold Line--Foothill Extension
Light Rail
Railroads
Trains
Train stations
Transportation
Item ID
34547AN
Collection
Newspaper Index
Less detail

Gold Line Foothill extension opens today. Timeline of history is shown. Parties begin at 10:00 AM for opening ceremony, free rides today. The $1 billion, 11.5-mile extension opens for passenger service. New stations in Arcadia, Monrovia, Duarte, Irwindale, and two in Azusa.

https://arcadiahistory.andornot.com/en/permalink/newspaper34457
Newspaper
Pasadena Star News
Date
March 5, 2016
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
March 5, 2016
Pages
p. A1, A6
Subjects
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34649AN
Collection
Newspaper Index
Less detail

Foothill Gold Line extension is complete. Metro anticipates starting service between Pasadena and Azusa in the spring. It cost $1 billion.

https://arcadiahistory.andornot.com/en/permalink/newspaper34315
Newspaper
Pasadena Star News
Date
September 24, 2015
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
September 24, 2015
Pages
p. A1, A7
Subjects
Metro Gold Line--Foothill Extension
Balian, Habib
Light rail trains
Railroads
Transportation
Item ID
34508AN
Collection
Newspaper Index
Less detail

Metro adds Gold Line service. Every train will run from Azusa Pacific University/Citrus College to East Los Angeles. Due to unprecedented demand, the Gold Line will run every seven minutes during peak morning and afternoon hours on weekdays. See also Arcadia Weekly, p. 2, June 30, 2016 "LA Metro improves Gold Line; relieves crowding for SGV communities."

https://arcadiahistory.andornot.com/en/permalink/newspaper34589
Newspaper
Pasadena Star News
Date
June 25, 2016
Pages
p. A1, A10
Newspaper
Pasadena Star News
Date
June 25, 2016
Pages
p. A1, A10
Subjects
Light Rail
Mass transit
Metro Gold Line Foothill Extension
Railroads
Trains
Transportation
Item ID
34781AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension moves ahead. Contractor Kiewit Parsons is given full "notice to proceed" to build the 11.5 mile route for the light rail train from Pasadena to Azusa, with a stop in Arcadia, by a planned 2015 completion date.

https://arcadiahistory.andornot.com/en/permalink/newspaper32910
Newspaper
Pasadena Star News
Date
April 5, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 5, 2012
Pages
p. A1, A4
Subjects
Kiewit Parsons
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33107AN
Collection
Newspaper Index
Less detail

The Gold Line Foothill Extension Construction Authority has predicted that people will get on the Pasadena-to-Azusa Gold Line extension 9,500 times a day in the year 2030.

https://arcadiahistory.andornot.com/en/permalink/newspaper30547
Newspaper
Pasadena Star News
Date
May 22, 2007
Pages
p. Local 1
Newspaper
Pasadena Star News
Date
May 22, 2007
Pages
p. Local 1
Subjects
Forecasting
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
30735AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

A draft report on the Metro Gold Line Foothill Extension proposes stops in Arcadia, Monrovia, Duarte, Irwindale, Azusa, Glendora, San Dimas, LaVerne, Pomona and Claremont. City hearing will be held at Arcadia City Hall on June 14.

https://arcadiahistory.andornot.com/en/permalink/newspaper28143
Newspaper
Pasadena Star News
Date
May 1, 2004
Pages
p. A1, A5
Newspaper
Pasadena Star News
Date
May 1, 2004
Pages
p. A1, A5
Subjects
Environmental impact report (EIR) -- draft
Light rail trains
Metro Gold Line Foothill Extension
Item ID
28336AN
Collection
Newspaper Index
Less detail

Officials lobby for Gold Line extension funding. $764 million is needed to finish the final segment of the extension from Azusa-to-Claremont. The Gold Line Construction Authority board this week approved an updated expense plan for the entire 23-mile Pasadena-to-Claremont extension of nearly $1.6 billion, of which $810 million has already been allocated, with full completion planned for 2021. The Metropolitan Transportation Authority has already funded the Gold Line's 11.5 mile, $750 million Pasadena-to-Azusa segment with Measure R revenues, but the $780 million Azusa-to-Claremont segment has yet to be funded.

https://arcadiahistory.andornot.com/en/permalink/newspaper32945
Newspaper
Pasadena Star News
Date
April 28, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
April 28, 2012
Pages
p. A1, A4
Subjects
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33142AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension Construction Authority opened bidding yesterday on Phase 2A of the light rail's extension toward Azusa, which would make a stop in Arcadia. The project is estimated to cost more than $450 million with a completion date in 2017. Measure R guarantees full funding for the Gold Line Extension minus a gap of $500,000. With possible help from a private investment, the completion could be moved up to 2013.

https://arcadiahistory.andornot.com/en/permalink/newspaper32161
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32358AN
Collection
Newspaper Index
Less detail

A Metro Gold Line deal to purchase land in Monrovia for a maintenance yard for $56 million, from George Brokate, a Marine veteran from Newport Beach, has been reached. This cleared the last major obstacle to the $735 million Pasadena to Azusa Metro Gold Line Foothill Extension. Photo shows the Gold Line bridge over the 210 Freeway in Arcadia under construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper32849
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Subjects
Brokate, George
Light Rail
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Trains
Transportation
Item ID
33046AN
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

Metro Gold Line Construction Authority agrees to pay $24 million for a commercial property in Monrovia, to be used as a maintenance yard for the Pasadena to Azusa light rail extension. The 4.5 acres of land, on the southwest corner of Evergreen and Shamrock Avenues, is owned by George Brokate of Excalibur Holdings.

https://arcadiahistory.andornot.com/en/permalink/newspaper32831
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Subjects
Brokate, George
Light rail trains
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Transportation
Item ID
33028AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension had a ground breaking ceremony at Newcastle Park in Arcadia, for a project that would extend the line from East Pasadena to Azusa, with stops in Arcadia, Monrovia, Duarte and Irwindale. This phase is fully funded through Measure R, the Los Angeles County half-cent sales tax increase that voters approved to fund transportation projects. Eventually the Gold Line will reach the Inland Empire.

https://arcadiahistory.andornot.com/en/permalink/newspaper32103
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32300AN
Collection
Newspaper Index
Less detail

Lack of train cars may delay the openings of the Expo Line Phase 2 from Culver City to Santa Monica and the Gold Line Foothill Extension from Pasadena to Azusa. Metro reports delivery of rail cars won't be complete until January 2017, while construction of the extensions should be done July/August (Expo) and late September (Gold Line), of 2015. The builder of the train cars is Kinkisharyo International, a Japanese company that is assembling the light rail trains in Palmdale, California. The Expo Line needs 42 cars and the Gold Line needs 15.

https://arcadiahistory.andornot.com/en/permalink/newspaper34025
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Subjects
Balian, Habib
Kinkisharyo International
Light rail trains
Metro Gold Line Foothill Extension
Item ID
34219AN
Collection
Newspaper Index
Less detail

Gold Line Extension for the phase from Azusa to Claremont is uncertain. The Metropolitan Transportation Authority (MTA) board has approved asking county voters to extend the Measure R half-cent sales tax for 30 years beyond its expiration date--without a strategy to fund the Gold Line Foothill Extension to Claremont. The Gold Line's 11.5 mile Pasadena-to-Azusa segment is already funded and scheduled for completion in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper33078
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33275AN
Collection
Newspaper Index
Less detail

The Metropolitan Transportation Authority (MTA) has voted to fully fund the $690 million Gold Line Foothill Extension, from Pasadena to Azusa, and to complete it by 2014, with money from Measure R. Measure R was approved by voters in the November 2008 election. It created a half-cent county sales tax intended for transportation projects. The MTA has the funding for the first phase of the Gold Line light rail to Azusa. The first phase is an 11-mile extension that includes stops in Arcadia, Monrovia, Duarte, Irwindale and Azusa.

https://arcadiahistory.andornot.com/en/permalink/newspaper31950
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32147AN
Collection
Newspaper Index
Less detail

L-Line Extension. Claremont Councilman Ed Reece to chair light rail line board, the Foothill Gold Line Construction Authority Board of Directors. The extension of the L-Line (formerly Gold Line) from Glendora to Pomona is 40% finished and scheduled for completion in early 2025. Reece will oversee the extension to Claremont and Montclair. The light rail line serves Arcadia, Pasadena, East Los Angeles and Los Angeles's Chinatown.

https://arcadiahistory.andornot.com/en/permalink/newspaper36156
Newspaper
Pasadena Star News
Date
January 19, 2022
Pages
p. A3, A7
Newspaper
Pasadena Star News
Date
January 19, 2022
Pages
p. A3, A7
Subjects
Foothill Gold Line Construction Authority Board
Light Rail
L-Line (formerly Gold Line)
Trains
Transportation
Collection
Newspaper Index
Less detail

The 11.5 mile light rail Gold Line extension from Pasadena to Azusa was awarded to Foothill Transit Constructors. Kiewit-Parsons, a joint venture company, will design and build the project. Funding comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper32468
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Subjects
Contractors
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32667AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.