Significant changes to Arcadia Transit System include ending the dial-a-ride service and switching to fixed route system. The dial-a-ride program will remain in service to seniors and the disabled.
Arcadia Dial-a-Ride service to return to seniors, disabled after years of students "monopolizing" the service. On July 1, the fare will increase from 25 cents to 50 cents per ride and will have new fixed routes. The Dial-a-Ride will be for seniors over 62 years old and riders who are disabled.
Changes for Arcadia Transit's Dial-a-Ride. The new two-tiered system reserves the Dial-a-Ride for senior citizens and the disabled, while three new fixed routes will serve the general public. Includes history of Dial-a-Ride in Arcadia.
Arcadia Transit launches expanded shuttle service with three fixed routes starting June 16. It will also operate as a Dial-a-Ride service for senior citizens and the disabled. Arcadia Transit has served the community since 1975.
Metro adds Gold Line service. Every train will run from Azusa Pacific University/Citrus College to East Los Angeles. Due to unprecedented demand, the Gold Line will run every seven minutes during peak morning and afternoon hours on weekdays. See also Arcadia Weekly, p. 2, June 30, 2016 "LA Metro improves Gold Line; relieves crowding for SGV communities."
First Transit, Inc. takes over the city's dial-a-ride system, which has been operated by Southland Transit for the last 30 years. The city is transitioning from a dial-a-ride to a full service transit system. The contract with First Transit is $8,248,078 for 5 years.
All aboard: Arcadia gets into training. The Metro Gold Line Station in Arcadia will have a grand opening on Saturday, March 5. The light rail Foothill Extension from Pasadena to Azusa will be offering free rides on March 5.
Foothill Gold Line construction update. The Gold Line light rail from Pasadena to Azusa has now surpassed 85% complete. Overview of bridge construction, track completion, grade crossings, and train testing. Substantial completion of entire project remains on schedule for late September 2015, when the project as a whole will be turned over to Metro for pre-revenue service. Metro will decide when the line will open for passenger service.
Metro Gold Line Foothill Extension officially starts March 5. The extension runs from its current terminus at Sierra Madre Villa Station in Pasadena to Azusa Pacific University/Citrus College Station.
Take the Gold Line to see the ponies at Santa Anita Park. Santa Anita Park offering the Santa Anita Shuttle to run on all race days and will operate in addition to Arcadia Transit's Shuttle service. The Santa Anita Shuttle runs non-stop from Arcadia Station (First Avenue and Santa Clara Street) of the Gold Line, through July 10, closing day of the spring meet.
Arcadia wrestles with homeless issue. Metro Gold Line is seen as factor by some in the growing numbers camping nearby. In 2016, the Arcadia Station of Metro Gold Line opened and police began seeing a marked increase in calls for service regarding homelessness, said Sergeant Dan Crowther.
Gold Line Foothill extension opens today. Timeline of history is shown. Parties begin at 10:00 AM for opening ceremony, free rides today. The $1 billion, 11.5-mile extension opens for passenger service. New stations in Arcadia, Monrovia, Duarte, Irwindale, and two in Azusa.
Lack of train cars may delay the openings of the Expo Line Phase 2 from Culver City to Santa Monica and the Gold Line Foothill Extension from Pasadena to Azusa. Metro reports delivery of rail cars won't be complete until January 2017, while construction of the extensions should be done July/August (Expo) and late September (Gold Line), of 2015. The builder of the train cars is Kinkisharyo International, a Japanese company that is assembling the light rail trains in Palmdale, California. The Expo Line needs 42 cars and the Gold Line needs 15.
Riders head to Pasadena, not Los Angeles. Ridership on the Metro Gold Line Foothill Extension is surpassing expectations. The east Pasadena to Azusa/Glendora extension, which opened March 5 is carrying 4000-5000 riders on weekdays and 3800 to 4000 on Saturday and Sunday. 18 percent of the riders from Arcadia Station went to Pasadena. Other rider statistics are given.
Arcadia has new hiking shuttle. U.S. Forest Service starts bus service to Chantry Flat trails from Arcadia Gold Line station. The shuttle goes to Chantry Flat Road, an area that connects to trails that lead to Sturtevant Falls, Hermit Falls, and historic Mount Wilson. The shuttle will run the next three weekends. Plans to make it permanent have not been formulated. See also Pasadena Star News, September 21, 2016, p. A7.
A Metro Gold Line deal to purchase land in Monrovia for a maintenance yard for $56 million, from George Brokate, a Marine veteran from Newport Beach, has been reached. This cleared the last major obstacle to the $735 million Pasadena to Azusa Metro Gold Line Foothill Extension. Photo shows the Gold Line bridge over the 210 Freeway in Arcadia under construction.
Trainspotting in Arcadia. First tests of Gold Line light rail between Pasadena and Azusa start. Metro Gold Line Foothill Extension conducted the first of many clearance tests involving actual Metro Gold Line train from Sierra Madre Villa Station (in Pasadena) to Azusa. The train was a $4 million Ansaldo Breda P2250 with specialized gear to test clearances, wheel/rail interface, rail switches, and Overhead Catenary System.
Arcadia commuters fed up with gridlock at First Avenue at the Gold Line Station, since trains started running through Arcadia in March 2016. City engineers are aware of the problems and public's frustration and looking at ways to improve the signals and wait times.
Metro Gold Line Foothill Extension opens with big party. Thousands line up for free rides on Saturday, March 5, 2016. Jay Cohen (pictured), Santa Anita Park's legendary bugler plays a tune at the Arcadia Station.