Gold Line construction moving forward on schedule. First Avenue in Arcadia to open by the end of March. See hard copy VF "Railroads-Light Rail-Metro Gold Line."
History Lives Here-11th marker unveiled at Arcadia Transit Plaza. The latest marker features many railroads that once crisscrossed Arcadia and is placed at the former site of the Atchison Topeka and Santa Fe Railway's Arcadia Depot.
Gold Line construction extends closure of Colorado Boulevard for another three weeks, until the third week of May, due to underground utility work. See hard copy in VF Railroads-Light Rail-Gold Line.
Closure of Santa Anita Avenue today begins seven months of bridge construction in Arcadia. Crews will begin constructing a new bridge over Santa Anita Avenue at the railroad crossing in Arcadia, as part of the 11.5 mile Metro Gold Line Foothill Extension light rail project.
A team of designers and builders (photo) from Kiewit Parsons firm working on the Metro Gold Line Foothill Extension prepare to remove the existing railroad bridge on Colorado Boulevard between San Antonio Road and Santa Anita Avenue in Arcadia. That section of Colorado Boulevard may close today. The portion of Colorado Boulevard west of North Santa Anita Avenue, is scheduled to be closed from 7:00 AM to 5:00 PM weekdays through June 8, to remove the existing railroad bridge. Since the Colorado Boulevard bridge was once an old freight line bridge, it is not wide enough to accommodate light rail trains and tracks, and thus, will be demolished over the next 4 weeks.
Arcadia Depot and Oakwood Hotel historical marker dedication January 26 at Arcadia Transit Plaza, the former site of Atchison Topeka and Santa Fe Railway's Arcadia Depot. It is the Arcadia Historical Society's 11th History Lives Here historical marker.
All 14 at-grade rail crossings now complete for Foothill Gold Line, from Pasadena to Azusa. The at-grade crossing in Arcadia is at First Avenue and Santa Clara Street.
Santa Anita Avenue's Gold Line Bridge was dedicated Tuesday, December 1. Bridge was built by taxpayers of Arcadia, funded by Measure A. The Gold Line Grade Separation Bond Citizen Oversight Committee was on hand for the event.
All aboard: Gold Line extension opened yesterday with free rides, and nearly 30,000 people jammed into the 6 new stations from Arcadia to Azusa. Photos of the grand opening.
Four day full closure of Huntington Drive and Second Avenue intersection in Arcadia begins Friday, August 8, for Gold Line Foothill Extension light rail construction.
Metro to improve 210 Freeway barriers, after a series of crashes over the last 2 years involved cars and trucks landing on the Gold Line tracks. Metro plans to install taller, stronger barriers and a detection system on 6 miles of right-of-way down the middle of the 210 Freeway in Pasadena and Arcadia.
Metro Gold Line Foothill train set to roll on March 5. The 11.5 mile extension from East Pasadena's Sierra Madre Villa Station to Azusa/Glendora border is expected to have 13,600 riders per day and trains to arrive every 12 minutes. The new stations are Arcadia, Monrovia, Duarte/City of Hope, Irwindale, Azusa Downtown, and Azusa Pacific University.
Gold Line Foothill extension opens today. Timeline of history is shown. Parties begin at 10:00 AM for opening ceremony, free rides today. The $1 billion, 11.5-mile extension opens for passenger service. New stations in Arcadia, Monrovia, Duarte, Irwindale, and two in Azusa.
Metro Gold Line Foothill Extension officially starts March 5. The extension runs from its current terminus at Sierra Madre Villa Station in Pasadena to Azusa Pacific University/Citrus College Station.
Metro Gold Line Foothill Extension opens with big party. Thousands line up for free rides on Saturday, March 5, 2016. Jay Cohen (pictured), Santa Anita Park's legendary bugler plays a tune at the Arcadia Station.
Riders head to Pasadena, not Los Angeles. Ridership on the Metro Gold Line Foothill Extension is surpassing expectations. The east Pasadena to Azusa/Glendora extension, which opened March 5 is carrying 4000-5000 riders on weekdays and 3800 to 4000 on Saturday and Sunday. 18 percent of the riders from Arcadia Station went to Pasadena. Other rider statistics are given.
Metro adds Gold Line service. Every train will run from Azusa Pacific University/Citrus College to East Los Angeles. Due to unprecedented demand, the Gold Line will run every seven minutes during peak morning and afternoon hours on weekdays. See also Arcadia Weekly, p. 2, June 30, 2016 "LA Metro improves Gold Line; relieves crowding for SGV communities."
Mass transit riders take preview run on 11.5 mile Gold Line Foothill extension from is current terminus at Sierra Madre Villa Station (in Pasadena) to the six new stations to the east, including Arcadia Station, Monrovia Station, Duarte Station, Irwindale Station, Downtown Azusa Station, and Azusa Pacific University/Citrus College Station. The new rail cars are stainless steel, made by Kinkisharyo, Model P3010.
All aboard: Arcadia gets into training. The Metro Gold Line Station in Arcadia will have a grand opening on Saturday, March 5. The light rail Foothill Extension from Pasadena to Azusa will be offering free rides on March 5.