Skip header and navigation

20 records – page 1 of 1.

The City Council has decided to spend about $100,000 for vines on the 4.5 miles of sound walls the Metropolitan Transportation Authority will build along the 210 Freeway in 2004-2005.

https://arcadiahistory.andornot.com/en/permalink/newspaper30539
Newspaper
Arcadia Weekly
Date
September 12, 2002
Pages
p. 1
Newspaper
Arcadia Weekly
Date
September 12, 2002
Pages
p. 1
Subjects
Noise
Sound Walls
210 Freeway
Item ID
30727AN
Collection
Newspaper Index
Less detail

Sound walls will be built along the 210 Freeway by Metropolitan Transit Authority (MTA) at a cost of $549 million. Under state rules, walls can be built wherever freeway noise is above 67 decibels.

https://arcadiahistory.andornot.com/en/permalink/newspaper30388
Newspaper
Arcadia Weekly
Date
June 13, 2002
Pages
p. 1
Newspaper
Arcadia Weekly
Date
June 13, 2002
Pages
p. 1
Subjects
Noise
Sound Walls
Item ID
30575AN
Collection
Newspaper Index
Less detail

Freeway sound walls promised for Arcadia and Monrovia appear to be still on schedule, according to the Metropolitan Transit Authority (MTA). The sound walls scheduled for construction as early as 2005 run from Michillinda Avenue to Santa Anita Avenue in Arcadia, and from Huntington Drive to California Avenue in Monrovia. Lower priority sound wall project locations are also given.

https://arcadiahistory.andornot.com/en/permalink/newspaper31375
Newspaper
Arcadia Weekly
Date
May 1, 2003
Pages
p. 1
Newspaper
Arcadia Weekly
Date
May 1, 2003
Pages
p. 1
Subjects
Freeways
Metropolitan Transit Authority (MTA)
Noise
Sound Walls
Item ID
31569AN
Collection
Newspaper Index
Less detail

Cal-Trans will demolish and rebuild the Santa Anita underpass of Route 210 located between Santa Anita Avenue and Baldwin Avenue exits. The bridge is being replaced for safety reasons.

https://arcadiahistory.andornot.com/en/permalink/newspaper25834
Newspaper
Arcadia Weekly
Date
June 26, 1997
Pages
p. 1
Newspaper
Arcadia Weekly
Date
June 26, 1997
Pages
p. 1
Subjects
Bridges
Item ID
26034AN
Collection
Newspaper Index
Less detail

In a joint venture, the Monrovia and Arcadia redevelopment agencies have created a new logo which reads "Huntington Crossing" and it will top the sign where the 210 Freeway crosses Fifth Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper26879
Newspaper
Arcadia Weekly
Date
March 11, 1999
Pages
p. 1
Newspaper
Arcadia Weekly
Date
March 11, 1999
Pages
p. 1
Subjects
Redevelopment
Signage
Item ID
27079AN
Collection
Newspaper Index
Less detail

Arcadia City Council has put out a design contract for landscaping and streetscape design on Baldwin Avenue between Duarte Road and Naomi Avenue. The contract went to Willdan, not to exceed $64,410. Another project proposes widening of the street to four lanes, 75 feet from curb to curb, with landscaped median, curb parking and additional landscaping, along with street resurfacing, to cost $380,000.

https://arcadiahistory.andornot.com/en/permalink/newspaper33433
Newspaper
Arcadia Weekly
Date
February 14, 2002
Pages
p. 1, 9
Newspaper
Arcadia Weekly
Date
February 14, 2002
Pages
p. 1, 9
Subjects
Baldwin Avenue
Streets
Item ID
33629AN
Collection
Newspaper Index
Less detail

Gold Line bridge across the 210 Freeway just west of Santa Anita Avenue is underway. There is a temporary support structure across the lanes which allows trucks under 15 feet tall to pass freely. When the structure is complete, the Gold Line Construction Authority says the height allowance will be 19 feet. The $18.6 million, 584-foot Gold Line Bridge, the first component of the 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension, started last summer and expected to be completed later this year.

https://arcadiahistory.andornot.com/en/permalink/newspaper32841
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33038AN
Collection
Newspaper Index
Less detail

Arcadia man Yue Zhao, 56, shot to death Sunday morning in the 1000 block of South 5th Avenue. See also Pasadena Star News, p. A7, June 1, 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper34183
Newspaper
Arcadia Weekly
Date
June 4, 2015
Pages
p. 14
Newspaper
Arcadia Weekly
Date
June 4, 2015
Pages
p. 14
Subjects
Castro, Mike (Arcadia Police Department)
Deaths
Zhao, Yue
Item ID
34377AN
Collection
Newspaper Index
Less detail

Three arrested for marijuana cultivation in the 1000 block of North First Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper33837
Newspaper
Arcadia Weekly
Date
May 22, 2014
Pages
p. 1, 25
Newspaper
Arcadia Weekly
Date
May 22, 2014
Pages
p. 1, 25
Subjects
Arcadia Police Department
Arrests
Crime and Criminals
Chu, Jessie Soi
Drugs
Marijuana
Rodriguez, Rodrigo Salas
Tran, Viet Van
Item ID
34031AN
Collection
Newspaper Index
Less detail

A new Sav-on drug store will open at Fifth Avenue and Foothill Boulevard in Arcadia, the former location of Foothill Gym.

https://arcadiahistory.andornot.com/en/permalink/newspaper30032
Newspaper
Arcadia Weekly
Date
August 23, 2001
Pages
p. 1
Newspaper
Arcadia Weekly
Date
August 23, 2001
Pages
p. 1
Subjects
Business and Industry
Sav-on Drugs
Drug Stores
Pharmacies
Item ID
30219AN
Collection
Newspaper Index
Less detail

Construction of the Metro Gold Line Foothill Extension bridge, that will span the 210 Freeway, has begun. Preparation of the giant column supports included drilling over 100 feet into the ground. The 584-foot Gold Line bridge will take shape by December. It replaces an old railroad bridge across the freeway, which was built about 1969 and torn down in 1997, said Gary Baker, director of construction for the Metro Gold Line Foothill Extension Construction Authority. The bridge's design has been controversial, as some say it is not representative of the origins of the area. The entire bridge is slated to be finished summer 2012.

https://arcadiahistory.andornot.com/en/permalink/newspaper32566
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
32765AN
Collection
Newspaper Index
Less detail

Strong winds at 70+ mph caused 29 light poles to topple over on Live Oak Avenue. There was damage to six other poles between Santa Anita Avenue and Sixth Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper30799
Newspaper
Arcadia Weekly
Date
January 9, 2003
Pages
p. 1
Newspaper
Arcadia Weekly
Date
January 9, 2003
Pages
p. 1
Subjects
Light poles
Weather
Winds
Item ID
30987AN
Collection
Newspaper Index
Less detail

New bridge over 210 Freeway taking shape at Santa Anita Avenue offramp. Skanska USA is the lead bridge contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper32835
Newspaper
Arcadia Weekly
Date
February 16, 2012
Pages
p. 1, 4
Newspaper
Arcadia Weekly
Date
February 16, 2012
Pages
p. 1, 4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Skanska USA
Item ID
33032AN
Collection
Newspaper Index
Less detail

Arcadia's new city government first formed in 1903 and its first meeting took place at Elias J. "Lucky" Baldwin's Oakwood Hotel, located at First Avenue and Santa Clara Road. Baldwin's hotel featured gambling and fine dining along with city government. The Oakwood Hotel burned down in 1911, and the city government moved to the McCoy Building at First Avenue and St. Joseph Street. Two years later, City Hall moved across the street to the Hibbard Building. In 1917, the first building was constructed as a City Hall at Huntington Drive and Second Avenue (?). A two-story colonial building was built for $18,000. This City Hall opened on July 13, 1918. City Hall moved in 1949 to a 13-acre parcel between Huntington Drive and the Pacific Electric railroad tracks.

https://arcadiahistory.andornot.com/en/permalink/newspaper31749
Newspaper
Arcadia Weekly
Date
July 17, 2003
Pages
p. 1, 18
Newspaper
Arcadia Weekly
Date
July 17, 2003
Pages
p. 1, 18
Subjects
Arcadia civic buildings
Arcadia City Hall - history - 1903-2003
Item ID
31946AN
Collection
Newspaper Index
Less detail

Harris & Associates will design streetscape and landscape improvements for the Santa Anita Entry Corridor, meaning Santa Anita Avenue from Huntington Drive to the Foothill 210 Freeway and on areas adjacent to the Santa Anita Avenue and Baldwin Avenue freeway ramps. The project will include pavement work. The contract for the project is for $107,211.

https://arcadiahistory.andornot.com/en/permalink/newspaper31526
Newspaper
Arcadia Weekly
Date
May 29, 2003
Pages
p. 18
Newspaper
Arcadia Weekly
Date
May 29, 2003
Pages
p. 18
Subjects
Harris and Associates - Harris & Associates
Landscaping
Item ID
31722AN
Collection
Newspaper Index
Less detail

Traffic conditions at the intersection of Foothill Boulevard and Fifth Avenue have caused the city councils of Arcadia and Monrovia to approve a resolution for $30,670 to widen the intersection.

https://arcadiahistory.andornot.com/en/permalink/newspaper27685
Newspaper
Arcadia Weekly
Date
August 3, 2000
Pages
p. 1
Newspaper
Arcadia Weekly
Date
August 3, 2000
Pages
p. 1
Subjects
Streets - Foothill Boulevard
Streets - Fifth Avenue
Item ID
27882AN
Collection
Newspaper Index
Less detail

Medical offices to be built adjacent to Arcadia Methodist Hospital. Developer Dick Hale will create a new 4 story, 72,000 square feet, state of the art medical office building. It is a joint venture between Hale Corporation and The Stronach Group, owner of Santa Anita Park Race Track. Groundbreaking slated for 2013, with space available for tenants in 2014.

https://arcadiahistory.andornot.com/en/permalink/newspaper33148
Newspaper
Arcadia Weekly
Date
August 30, 2012
Pages
p. 11
Newspaper
Arcadia Weekly
Date
August 30, 2012
Pages
p. 11
Subjects
Developers and developments
Hale Corporation
Stronach Group
Item ID
33345AN
Collection
Newspaper Index
Less detail

Toyota Motors Credit Corporation will lease 9,350 square feet of space at the new office building at 488 Santa Clara Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper30349
Newspaper
Arcadia Weekly
Date
May 23, 2002
Pages
p. 8
Newspaper
Arcadia Weekly
Date
May 23, 2002
Pages
p. 8
Subjects
Business and Industry
Office buildings
Toyota Motors Credit Corporation
Item ID
30535AN
Collection
Newspaper Index
Less detail

Residents object to proposed home to be built at 920 South Fifth Street. At issue are the size of the house and how its design may not fit in with the neighborhood.

https://arcadiahistory.andornot.com/en/permalink/newspaper34663
Newspaper
Arcadia Weekly
Date
September 8, 2016
Pages
p. 1, 13
Newspaper
Arcadia Weekly
Date
September 8, 2016
Pages
p. 1, 13
Subjects
Houses
Mansions
Item ID
34855AN
Collection
Newspaper Index
Less detail

Proposed two-story home at 1101 S. Fifth Avenue causes kerfuffle. At this week's Arcadia City Council meeting, the project's neighbors appealed the Planning Commission's decision to approve the design of the 3588 s.f. house. Neighbors complain of loss of light and privacy. In a 3-2 vote, the Planning Commission's decision was upheld on the conditions that the owner remove windows on the north and south sides of the second floor.

https://arcadiahistory.andornot.com/en/permalink/newspaper34613
Newspaper
Arcadia Weekly
Date
July 21, 2016
Pages
p. 1, 13
Newspaper
Arcadia Weekly
Date
July 21, 2016
Pages
p. 1, 13
Subjects
Arcadia City Council
Arcadia Planning Commission
Chan, Phillip
Floor-area-ratio (FAR)
Mansions
Verlato, April
Zoning codes
Item ID
34805AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.