Skip header and navigation

20 records – page 1 of 1.

The 11.5 mile light rail Gold Line extension from Pasadena to Azusa was awarded to Foothill Transit Constructors. Kiewit-Parsons, a joint venture company, will design and build the project. Funding comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper32468
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Subjects
Contractors
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32667AN
Collection
Newspaper Index
Less detail

The Metropolitan Transportation Authority (MTA) has voted to fully fund the $690 million Gold Line Foothill Extension, from Pasadena to Azusa, and to complete it by 2014, with money from Measure R. Measure R was approved by voters in the November 2008 election. It created a half-cent county sales tax intended for transportation projects. The MTA has the funding for the first phase of the Gold Line light rail to Azusa. The first phase is an 11-mile extension that includes stops in Arcadia, Monrovia, Duarte, Irwindale and Azusa.

https://arcadiahistory.andornot.com/en/permalink/newspaper31950
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 26, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32147AN
Collection
Newspaper Index
Less detail

The abandoned rail bridge over Colorado Boulevard in Arcadia will be removed because it could not accommodate the two-track light rail system and the Gold Line Construction Authority determined it was more efficient and cost effective to remove the structure than to widen it or add a second structure directly adjacent to the ole one. Bridge demolition was the first significant construction effort for Foothill Transit Constructors (FTC) and the alignment project. The Construction Authority will have three open houses in the next two weeks to update the community.

https://arcadiahistory.andornot.com/en/permalink/newspaper33080
Newspaper
Arcadia Weekly
Date
June 21, 2012
Pages
p. 10

All 14 at-grade rail crossings now complete for Foothill Gold Line, from Pasadena to Azusa. The at-grade crossing in Arcadia is at First Avenue and Santa Clara Street.

https://arcadiahistory.andornot.com/en/permalink/newspaper34011
Newspaper
Arcadia Weekly
Date
October 30, 2014
Pages
p. 12
Newspaper
Arcadia Weekly
Date
October 30, 2014
Pages
p. 12
Subjects
Light rail trains
Metro Gold Line-Foothill Extension
Railroads
Transportation
Item ID
34205AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension had a ground breaking ceremony at Newcastle Park in Arcadia, for a project that would extend the line from East Pasadena to Azusa, with stops in Arcadia, Monrovia, Duarte and Irwindale. This phase is fully funded through Measure R, the Los Angeles County half-cent sales tax increase that voters approved to fund transportation projects. Eventually the Gold Line will reach the Inland Empire.

https://arcadiahistory.andornot.com/en/permalink/newspaper32103
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
June 27, 2010
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32300AN
Collection
Newspaper Index
Less detail

Gold Line Extension for the phase from Azusa to Claremont is uncertain. The Metropolitan Transportation Authority (MTA) board has approved asking county voters to extend the Measure R half-cent sales tax for 30 years beyond its expiration date--without a strategy to fund the Gold Line Foothill Extension to Claremont. The Gold Line's 11.5 mile Pasadena-to-Azusa segment is already funded and scheduled for completion in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper33078
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33275AN
Collection
Newspaper Index
Less detail

First Avenue at Santa Clara Street in Arcadia closed September 9, 2013 through February, 2014 for construction of grade crossing improvements, as part of the Metro Gold Line Foothill Extension light rail project in Arcadia. Also, to construct the parking structure and transit plaza adjacent to the crossing, Front Street between Santa Clara Street and Saint Joseph Street, will be permanently closing in September.

https://arcadiahistory.andornot.com/en/permalink/newspaper33608
Newspaper
Arcadia Weekly
Date
September 5, 2013
Pages
p. 1, 23
Newspaper
Arcadia Weekly
Date
September 5, 2013
Pages
p. 1, 23
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33803AN
Collection
Newspaper Index
Less detail

Local transit authorities are preparing to move forward with the Gold Line Foothill Extension to the Azusa-Glendora border and local cities are planning to place residential and commercial developments along the line. Those developments are intended to prepare for future population growth. The first phase of the extension is slated to be completed by 2014, adding new stops in Arcadia, Monrovia, Duarte, Irwindale and Azusa. Some plans near those stops could be scaled back due to the down economy. Arcadia officials are looking to build commercial developments centered on a planned station just east of Santa Anita Avenue. Arcadia's challenge will be land acquisition. Because Arcadia has ordinances limiting the use of eminent domain, Arcadia officials have to rely on negotiating land deals, a difficult process with limited redevelopment funds.

https://arcadiahistory.andornot.com/en/permalink/newspaper32082
Newspaper
Pasadena Star News
Date
June 6, 2010
Pages
p. A1
Newspaper
Pasadena Star News
Date
June 6, 2010
Pages
p. A1
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Redevelopment
Item ID
32279AN
Collection
Newspaper Index
Less detail

Elected officials from San Gabriel Valley foothill cities are angry after being told the second phase of the Gold Line Extension project (from Azusa to Claremont) will be given zero dollars from Measure R, despite an aggressive funding plan for other projects in Los Angeles, as proposed by the Metropolitan Transportation Authority (MTA). MTA staff wants to make permanent Measure R--the half cent sales tax passed by voters in 2008 that expires in 2039--to fund a list of transportation projects across the southland.

https://arcadiahistory.andornot.com/en/permalink/newspaper33075
Newspaper
Pasadena Star News
Date
June 27, 2012
Pages
p. A4
Newspaper
Pasadena Star News
Date
June 27, 2012
Pages
p. A4
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33272AN
Collection
Newspaper Index
Less detail

Foothill Gold Line construction update. The Gold Line light rail from Pasadena to Azusa has now surpassed 85% complete. Overview of bridge construction, track completion, grade crossings, and train testing. Substantial completion of entire project remains on schedule for late September 2015, when the project as a whole will be turned over to Metro for pre-revenue service. Metro will decide when the line will open for passenger service.

https://arcadiahistory.andornot.com/en/permalink/newspaper34152
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
34346AN
Collection
Newspaper Index
Less detail

Four day full closure of Huntington Drive and Second Avenue intersection in Arcadia begins Friday, August 8, for Gold Line Foothill Extension light rail construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper33970
Newspaper
Arcadia Weekly
Date
August 7, 2014
Pages
p. 1, 10
Newspaper
Arcadia Weekly
Date
August 7, 2014
Pages
p. 1, 10
Subjects
Light Rail
Metro Gold Line Foothill Extension
Railroads
Trains
Transportation
Item ID
34164AN
Collection
Newspaper Index
Less detail

Gold Line construction moving forward on schedule. First Avenue in Arcadia to open by the end of March. See hard copy VF "Railroads-Light Rail-Metro Gold Line."

https://arcadiahistory.andornot.com/en/permalink/newspaper33776
Newspaper
Arcadia Weekly
Date
March 13, 2014
Pages
p. 1, 6
Newspaper
Arcadia Weekly
Date
March 13, 2014
Pages
p. 1, 6
Subjects
Gold Line
Light Rail
Trains
Transportation
Item ID
33971AN
Collection
Newspaper Index
Less detail

All aboard: Arcadia gets into training. The Metro Gold Line Station in Arcadia will have a grand opening on Saturday, March 5. The light rail Foothill Extension from Pasadena to Azusa will be offering free rides on March 5.

https://arcadiahistory.andornot.com/en/permalink/newspaper34475
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Subjects
Arcadia Station (Gold Line)
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34667AN
Collection
Newspaper Index
Less detail

Trainspotting in Arcadia. First tests of Gold Line light rail between Pasadena and Azusa start. Metro Gold Line Foothill Extension conducted the first of many clearance tests involving actual Metro Gold Line train from Sierra Madre Villa Station (in Pasadena) to Azusa. The train was a $4 million Ansaldo Breda P2250 with specialized gear to test clearances, wheel/rail interface, rail switches, and Overhead Catenary System.

https://arcadiahistory.andornot.com/en/permalink/newspaper34040
Newspaper
Arcadia Weekly
Date
December 11, 2014
Pages
p. 1, 17
Newspaper
Arcadia Weekly
Date
December 11, 2014
Pages
p. 1, 17
Subjects
Light rail trains
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34234AN
Collection
Newspaper Index
Less detail

Lack of train cars may delay the openings of the Expo Line Phase 2 from Culver City to Santa Monica and the Gold Line Foothill Extension from Pasadena to Azusa. Metro reports delivery of rail cars won't be complete until January 2017, while construction of the extensions should be done July/August (Expo) and late September (Gold Line), of 2015. The builder of the train cars is Kinkisharyo International, a Japanese company that is assembling the light rail trains in Palmdale, California. The Expo Line needs 42 cars and the Gold Line needs 15.

https://arcadiahistory.andornot.com/en/permalink/newspaper34025
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Subjects
Balian, Habib
Kinkisharyo International
Light rail trains
Metro Gold Line Foothill Extension
Item ID
34219AN
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension Construction Authority opened bidding yesterday on Phase 2A of the light rail's extension toward Azusa, which would make a stop in Arcadia. The project is estimated to cost more than $450 million with a completion date in 2017. Measure R guarantees full funding for the Gold Line Extension minus a gap of $500,000. With possible help from a private investment, the completion could be moved up to 2013.

https://arcadiahistory.andornot.com/en/permalink/newspaper32161
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32358AN
Collection
Newspaper Index
Less detail

Arcadia Transit Plaza ready to welcome light rail travelers to Arcadia. Photo and article by Terry Miller. See also page 7.

https://arcadiahistory.andornot.com/en/permalink/newspaper34016
Newspaper
Arcadia Weekly
Date
November 13, 2014
Pages
p. 14
Newspaper
Arcadia Weekly
Date
November 13, 2014
Pages
p. 14
Subjects
Arcadia Transit Plaza
Light rail trains
Miller, Terry
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34210AN
Collection
Newspaper Index
Less detail

Metro Gold Line Construction Authority agrees to pay $24 million for a commercial property in Monrovia, to be used as a maintenance yard for the Pasadena to Azusa light rail extension. The 4.5 acres of land, on the southwest corner of Evergreen and Shamrock Avenues, is owned by George Brokate of Excalibur Holdings.

https://arcadiahistory.andornot.com/en/permalink/newspaper32831
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Subjects
Brokate, George
Light rail trains
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Transportation
Item ID
33028AN
Collection
Newspaper Index
Less detail

Gold Line construction extends closure of Colorado Boulevard for another three weeks, until the third week of May, due to underground utility work. See hard copy in VF Railroads-Light Rail-Gold Line.

https://arcadiahistory.andornot.com/en/permalink/newspaper33493
Newspaper
Pasadena Star News
Date
May 4, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
May 4, 2013
Pages
p. A3
Subjects
Bridges
Colorado Boulevard bridge
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33687AN
Collection
Newspaper Index
Less detail

Gold Line construction will cause closure of intersection of First Avenue and Santa Clara Street for six months starting tomorrow. Front Street between Santa Clara Street and Saint Joseph Street will be permanently closing in September for the building of a parking structure and transit plaza on that site.

https://arcadiahistory.andornot.com/en/permalink/newspaper33609
Newspaper
Pasadena Star News
Date
September 8, 2013
Pages
p. A5
Newspaper
Pasadena Star News
Date
September 8, 2013
Pages
p. A5
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33804AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.