Skip header and navigation

20 records – page 2 of 1.

All aboard: Arcadia gets into training. The Metro Gold Line Station in Arcadia will have a grand opening on Saturday, March 5. The light rail Foothill Extension from Pasadena to Azusa will be offering free rides on March 5.

https://arcadiahistory.andornot.com/en/permalink/newspaper34475
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Subjects
Arcadia Station (Gold Line)
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34667AN
Collection
Newspaper Index
Less detail

John Fasana, a Duarte City Council member and Metropolitan Transportation Agency (MTA) board member, will introduce a measure today to include the 24-mile Gold Line Extension to Claremont in the MTA's long range transportation plan. To get federal stimulus money, the Gold Line needs to be listed in the MTA's long-range plan. Fasana wants to see the MTA reinforce the commitments made in Measure R, the tax measure that Los Angeles County voters approved to provide more than $700 million for the Gold Line.

https://arcadiahistory.andornot.com/en/permalink/newspaper31418
Newspaper
Pasadena Star News
Date
March 26, 2009
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 26, 2009
Pages
p. A1, A4
Subjects
Fasana, John
Metro Gold Line Extension
Light Rail
Metropolitan Transportation Agency (MTA)
Trains
Item ID
31611AN
Collection
Newspaper Index
Less detail

The abandoned rail bridge over Colorado Boulevard in Arcadia will be removed because it could not accommodate the two-track light rail system and the Gold Line Construction Authority determined it was more efficient and cost effective to remove the structure than to widen it or add a second structure directly adjacent to the ole one. Bridge demolition was the first significant construction effort for Foothill Transit Constructors (FTC) and the alignment project. The Construction Authority will have three open houses in the next two weeks to update the community.

https://arcadiahistory.andornot.com/en/permalink/newspaper33080
Newspaper
Arcadia Weekly
Date
June 21, 2012
Pages
p. 10

All 14 at-grade rail crossings now complete for Foothill Gold Line, from Pasadena to Azusa. The at-grade crossing in Arcadia is at First Avenue and Santa Clara Street.

https://arcadiahistory.andornot.com/en/permalink/newspaper34011
Newspaper
Arcadia Weekly
Date
October 30, 2014
Pages
p. 12
Newspaper
Arcadia Weekly
Date
October 30, 2014
Pages
p. 12
Subjects
Light rail trains
Metro Gold Line-Foothill Extension
Railroads
Transportation
Item ID
34205AN
Collection
Newspaper Index
Less detail

Local transit authorities are preparing to move forward with the Gold Line Foothill Extension to the Azusa-Glendora border and local cities are planning to place residential and commercial developments along the line. Those developments are intended to prepare for future population growth. The first phase of the extension is slated to be completed by 2014, adding new stops in Arcadia, Monrovia, Duarte, Irwindale and Azusa. Some plans near those stops could be scaled back due to the down economy. Arcadia officials are looking to build commercial developments centered on a planned station just east of Santa Anita Avenue. Arcadia's challenge will be land acquisition. Because Arcadia has ordinances limiting the use of eminent domain, Arcadia officials have to rely on negotiating land deals, a difficult process with limited redevelopment funds.

https://arcadiahistory.andornot.com/en/permalink/newspaper32082
Newspaper
Pasadena Star News
Date
June 6, 2010
Pages
p. A1
Newspaper
Pasadena Star News
Date
June 6, 2010
Pages
p. A1
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Redevelopment
Item ID
32279AN
Collection
Newspaper Index
Less detail

The Gold Line received federal financial support in the final House appropriations bill. Monrovia, Arcadia and other cities along the planned extension of the route from Pasadena to Claremont have formed a joint powers authority to study grade separations.

https://arcadiahistory.andornot.com/en/permalink/newspaper31069
Newspaper
Arcadia Weekly
Date
February 20, 2003
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 20, 2003
Pages
p. 1
Subjects
Gold Line extension
Light Rail
Metropolitan Transit Authority (MTA)
Public transportation
Trains
Item ID
31264AN
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill train set to roll on March 5. The 11.5 mile extension from East Pasadena's Sierra Madre Villa Station to Azusa/Glendora border is expected to have 13,600 riders per day and trains to arrive every 12 minutes. The new stations are Arcadia, Monrovia, Duarte/City of Hope, Irwindale, Azusa Downtown, and Azusa Pacific University.

https://arcadiahistory.andornot.com/en/permalink/newspaper34354
Newspaper
Pasadena Star News
Date
October 23, 2015
Pages
p. A1, A5
Newspaper
Pasadena Star News
Date
October 23, 2015
Pages
p. A1, A5
Subjects
Metro Gold Line--Foothill Extension
Light Rail
Railroads
Trains
Train stations
Transportation
Item ID
34547AN
Collection
Newspaper Index
Less detail

After receiving intense pressure from San Gabriel Valley lawmakers, the county's transportation board, the MTA, finally put the Gold Line extension in its long-term plans. This opens up the possibility of federal funding for the project. With this commitment, the Metropolitan Transportation Authority (MTA) has agreed to provide day-to-day operational funding for the first phase of the Gold Line Foothill extension once it is completed.

https://arcadiahistory.andornot.com/en/permalink/newspaper31763
Newspaper
Pasadena Star News
Date
October 23, 2009
Pages
p. A1, A12
Newspaper
Pasadena Star News
Date
October 23, 2009
Pages
p. A1, A12
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
31960AN
Collection
Newspaper Index
Less detail

Railroads-Light Rail (Metro Gold Line, L-Line, Blue Line, A-Line)

https://arcadiahistory.andornot.com/en/permalink/subject291
Contents
Original name of the light rail was the Gold Line. Later, Gold Line was temporarily renamed L-Line and officially renamed A-Line aka Blue Line effective June 16, 2023. 1. Metro Gold Line Foothill Extension, Winter 2011. A 2-sided information flyer including quick facts, project funding, constructio…
Contents
Original name of the light rail was the Gold Line. Later, Gold Line was temporarily renamed L-Line and officially renamed A-Line aka Blue Line effective June 16, 2023.
1. Metro Gold Line Foothill Extension, Winter 2011. A 2-sided information flyer including quick facts, project funding, construction authority background that accompanied a model of the Metro Gold Line on display at the library starting in early 2011.
2. Metro Gold Line Extension information in a supplement called "Civic Leadership" in the Pasadena Star News, January 31, 2011. "Once the environmental process is completed in 2012, the project will be ready for funding at the local and federal levels. Metro has made funding the Foothill Extension from Azusa to Montclair a priority project for the agency.
3. Memo from Jason Kruckeberg, Asst. City Manager / Development Services Director and Phil Wray, Deputy Director of Development Services/City Engineer to Mayor and City Council re: Discussion of Gold Line Project Status-City's Commitments and Progress Review. August 16, 2011.
4. Artist renderings of future Arcadia Station and I-210 Gold Line Bridge (to resemble weaved baskets).
5. Introducing six new stations in five cities--Arcadia, Monrovia, Duarte, Irwindale, Azusa-Alameda and Azusa-Citrus. Construction completion on track for 2015. Habib F. Balian, CEO of Metro Gold Line Foothill Extension Construction Authority is pictured. An award winning team of contractors and engineers include Skanska, Hill International, Jacobs, Patterson & Associates, Inc.
6. Staff report from Jason Kruckeberg to Mayor and City Council, April 3, 2012 re: report, discussion and direction regarding Gold Line parking structure and transit plaza, with drawings.
7. Three train bridges, station coming. Mountain Views News, p. 6, February 16, 2013.
8. Foothill Gold Line extension updates. Arcadia Weekly, p. 8, February 21, 2013. Updates on design work, demolition, station locations.
9. Santa Anita Bridge groundbreaking.Mountain Views News, p. 7, April 20, 2013.
10. Gold Line construction extends closure of Colorado Boulevard, Pasadena Star News, p. A3, May 4, 2013.
11. Gold Line bridge project to conclude on Colorado Boulevard. Nearly five months of construction ends, but heavy work to begin on Santa Anita Avenue. Pasadena Star News, p. A10. May 29, 2013.
12. Gold Line construction moving forward. First Avenue in Arcadia to open by the end of March. Arcadia Weekly, March 13, 2014.
13. Gold Line station art revealed, April 29, 2014. Retrieved from http://arcadiachamber.org on May 1, 2014.
14. Foothill Gold Line Pasadena to Azusa Update. Construction (bridges, at-grade crossings) continues on time and on budget for a September 2015 turn-over to Metro. Mountain Views News, Section B-p. 1, June 6, 2014.
15. Downtown Arcadia intersection at Huntington and Second will be closed for Gold Line construction, August 6, 2014. Retrieved from www.pasadenastarnews.com on August 11, 2014.
16. Chamber's key role in Gold Line station by Scott Hettrick, August 24, 2015. Retrieved from ArcadiaCAChamber.org on August 25, 2015.
17. Foothill Gold Line Newsletter. Third quarter 2014, with construction update and inserts about Arcadia Station (station artist Michael Davis) and Who Knew Building a Light Rail Track Could Be So Interesting?
18. A-C. 18A. City of Arcadia Holiday Tree Lighting and Dedication December 5, 2015 at Arcadia Transit Plaza. 18B. Arcadia Transit Plaza Dedication Ceremony November 6, 2014. 18C. Arcadia's Grand Opening Celebrationg. Gold Line is coming to Arcadia Saturday, March 5, 2016-Ribbon cutting and station celebration (2 copies).
19. Metro to offer free rides on new Gold Line extension March 5: community events planned at five stations. Arcadia Station at 201 N. First Avenue. Arcadia Weekly, February 25, 2016.
20. Gold Line extension unlikely to affect big traffic jams: history shows trains won't impact freeways. Pasadena Star News, March 2, 2016.
21.Two articles. Where the gold train takes you. Riding the new Gold Line Foothill Extension? Check out 21 activities, local attractions. Art at new Gold Line stations tells cities' stories. Pasadena Star News, March 1, 2016.
22. Opening Day of Metro Gold Line Arcadia Station marketing items: Metro Map & Pocket Guide; Metro Rider's Guide; Arcadia Shop dine stay enjoy coupon book; What is Tap? Instructional Coloring Book; Celebrate the grand opening March 5, 2016 flyer; Heads up watch for trains perforated train model of Kinkisharyo P3010.
23. The ABCs of the Gold Line. Arcadia Weekly, March 3, 2016.
24. All aboard! Metro's Gold Line comes a long way to connect Pasadena to Azusa on Saturday. Pasadena Weekly, March 3, 2016.
25. City of Arcadia celebrates opening of the Gold Line Extension. Arcadia Transit introduces new shuttle service in conjunction with Metro Gold Line opening. Mountain Views News, February 27, 2016.
26. Gold Line fuels nearby projects: extension generating money for area cities. Pasadena Star News, p. A1, A5, February 29, 2016.
27. Wheels: Go east young man: Gold Line opening ceremony prompts historic musings on the Atchison, Topeka and the Santa Fe. Pasadena Weekly, p. 14, March 3, 2016. By Lauren Holland.
28. L Line (Gold) Metro Rail Schedule, Metro Rail Azusa-Union Station-East LA, effective April 9, 2023.
29. A-B. 29A. June 2023 map of all Metro rail lines, Metro busway routes, regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). 29B. A Line Metro Rail schedule effective June 16, 2023 on two sheets. Includes map, connections and parking.
30. A-D. 30A. Meet the Line Letters - Nuevos Nombres. Folded map of Metro Rail & Busway. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Explanations in English and Spanish. Dated October 2022. 30B. Metro rail is growing! Brochure explaining changes in names, stations, and routes when Metro completes the Regional Connector Transit Project on June 16, 2023. Includes map. In English and Spanish. 30C. Meet the new lineup = Conozca nuestra neva alineacion. Folded map of Metro Rail and Busway routes. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Explanations In English and Spanish. Dated June 2023. 30D. Go Metro map & pocket guide. Folded map of Metro Rail & Busway. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Includes information on fares, hours, and important contacts. Dated August 2023.
Subjects
Railroads-Light Rail-Metro Gold Line
Railroads-Light Rail-L Line
Railroads-Light Rail-Blue Line
Railroads-Light Rail-A Line
Item ID
293AF
Collection
Subject Files
Less detail

A county transportation committee has recommended the Gold Line extension receive $10 million in initial funding from Measure R, instead of the $127,000 that was originally budgeted for the light rail line.

https://arcadiahistory.andornot.com/en/permalink/newspaper31481
Newspaper
Pasadena Star News
Date
May 22, 2009
Pages
p. A1, A16
Newspaper
Pasadena Star News
Date
May 22, 2009
Pages
p. A1, A16
Subjects
Gold Line extension
Metropolitan Transportation Authority (MTA)
Item ID
31675AN
Collection
Newspaper Index
Less detail

Lack of train cars may delay the openings of the Expo Line Phase 2 from Culver City to Santa Monica and the Gold Line Foothill Extension from Pasadena to Azusa. Metro reports delivery of rail cars won't be complete until January 2017, while construction of the extensions should be done July/August (Expo) and late September (Gold Line), of 2015. The builder of the train cars is Kinkisharyo International, a Japanese company that is assembling the light rail trains in Palmdale, California. The Expo Line needs 42 cars and the Gold Line needs 15.

https://arcadiahistory.andornot.com/en/permalink/newspaper34025
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Subjects
Balian, Habib
Kinkisharyo International
Light rail trains
Metro Gold Line Foothill Extension
Item ID
34219AN
Collection
Newspaper Index
Less detail

The city council has decided to appropriate $35,000 toward the design of a light rail bridge over Santa Anita Avenue. This is to pay for early design work needed for an environmental impact report. The bridge project is expected to cost the city $10.7 million which may come from a bond. The Construction Authority would pay $18.4 million bringing total bridge cost to $29.1 million.

https://arcadiahistory.andornot.com/en/permalink/newspaper29512
Newspaper
Pasadena Star News
Date
May 5, 2005
Pages
p. A3

Gold Line bridge across the 210 Freeway just west of Santa Anita Avenue is underway. There is a temporary support structure across the lanes which allows trucks under 15 feet tall to pass freely. When the structure is complete, the Gold Line Construction Authority says the height allowance will be 19 feet. The $18.6 million, 584-foot Gold Line Bridge, the first component of the 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension, started last summer and expected to be completed later this year.

https://arcadiahistory.andornot.com/en/permalink/newspaper32841
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33038AN
Collection
Newspaper Index
Less detail

The 13-member MTA board voted to leave the Gold Line Extension off a critical funding list. This delays the construction of the $1.4 billion project , a 24-mile rail link between Pasadena and Montclair, until at least the end of 2009.

https://arcadiahistory.andornot.com/en/permalink/newspaper30901
Newspaper
Pasadena Star News
Date
January 25, 2008
Pages
p. News 1
Newspaper
Pasadena Star News
Date
January 25, 2008
Pages
p. News 1
Subjects
Gold Line extension
Metropolitan Transportation Authority (MTA)
Item ID
31089AN
Collection
Newspaper Index
Less detail

The Metro Blue Line Construction Authority is working to create a joint powers agreement to oversee the construction of the transit line extension from Pasadena to Claremont, with participation from cities along the planned route. That would include Arcadia and Monrovia.

https://arcadiahistory.andornot.com/en/permalink/newspaper30536
Newspaper
Arcadia Weekly
Date
September 5, 2002
Pages
p. 1
Newspaper
Arcadia Weekly
Date
September 5, 2002
Pages
p. 1
Subjects
Gold Line
Light Rail
Metro Blue Line Construction Authority
Trains
Transportation
Item ID
30724AN
Collection
Newspaper Index
Less detail

Metro Gold Line Construction Authority agrees to pay $24 million for a commercial property in Monrovia, to be used as a maintenance yard for the Pasadena to Azusa light rail extension. The 4.5 acres of land, on the southwest corner of Evergreen and Shamrock Avenues, is owned by George Brokate of Excalibur Holdings.

https://arcadiahistory.andornot.com/en/permalink/newspaper32831
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Subjects
Brokate, George
Light rail trains
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Transportation
Item ID
33028AN
Collection
Newspaper Index
Less detail

First Avenue at Santa Clara Street in Arcadia closed September 9, 2013 through February, 2014 for construction of grade crossing improvements, as part of the Metro Gold Line Foothill Extension light rail project in Arcadia. Also, to construct the parking structure and transit plaza adjacent to the crossing, Front Street between Santa Clara Street and Saint Joseph Street, will be permanently closing in September.

https://arcadiahistory.andornot.com/en/permalink/newspaper33608
Newspaper
Arcadia Weekly
Date
September 5, 2013
Pages
p. 1, 23
Newspaper
Arcadia Weekly
Date
September 5, 2013
Pages
p. 1, 23
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33803AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

Gold Line Foothill extension opens today. Timeline of history is shown. Parties begin at 10:00 AM for opening ceremony, free rides today. The $1 billion, 11.5-mile extension opens for passenger service. New stations in Arcadia, Monrovia, Duarte, Irwindale, and two in Azusa.

https://arcadiahistory.andornot.com/en/permalink/newspaper34457
Newspaper
Pasadena Star News
Date
March 5, 2016
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
March 5, 2016
Pages
p. A1, A6
Subjects
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34649AN
Collection
Newspaper Index
Less detail

20 records – page 2 of 1.