Skip header and navigation

20 records – page 1 of 1.

Construction of the Metro Gold Line Foothill Extension bridge, that will span the 210 Freeway, has begun. Preparation of the giant column supports included drilling over 100 feet into the ground. The 584-foot Gold Line bridge will take shape by December. It replaces an old railroad bridge across the freeway, which was built about 1969 and torn down in 1997, said Gary Baker, director of construction for the Metro Gold Line Foothill Extension Construction Authority. The bridge's design has been controversial, as some say it is not representative of the origins of the area. The entire bridge is slated to be finished summer 2012.

https://arcadiahistory.andornot.com/en/permalink/newspaper32566
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
32765AN
Collection
Newspaper Index
Less detail

The Blue Line Construction authority board supported creation of a 15-member panel to see the planning, design and construction of the Gold Line's 22.5 mile extension thru Arcadia to Claremont.

https://arcadiahistory.andornot.com/en/permalink/newspaper25859
Newspaper
Pasadena Star News
Date
July 10, 2003
Pages
p. A3
Newspaper
Pasadena Star News
Date
July 10, 2003
Pages
p. A3
Subjects
Blue Line Construction Authority
Gold Line
Item ID
26059AN
Collection
Newspaper Index
Less detail

L-Line Extension. Claremont Councilman Ed Reece to chair light rail line board, the Foothill Gold Line Construction Authority Board of Directors. The extension of the L-Line (formerly Gold Line) from Glendora to Pomona is 40% finished and scheduled for completion in early 2025. Reece will oversee the extension to Claremont and Montclair. The light rail line serves Arcadia, Pasadena, East Los Angeles and Los Angeles's Chinatown.

https://arcadiahistory.andornot.com/en/permalink/newspaper36156
Newspaper
Pasadena Star News
Date
January 19, 2022
Pages
p. A3, A7
Newspaper
Pasadena Star News
Date
January 19, 2022
Pages
p. A3, A7
Subjects
Foothill Gold Line Construction Authority Board
Light Rail
L-Line (formerly Gold Line)
Trains
Transportation
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension Construction Authority announced that structural work is complete for Gold Line Bridge over Interstate 210 Freeway. "The bridge can now stand on its own," said Construction Authority CEO Habib F. Balian. The bridge is a 584-linear foot, $18.6 million rail bridge that helps extend the Gold Line from Pasadena to Azusa, in this first segment.

https://arcadiahistory.andornot.com/en/permalink/newspaper33151
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Subjects
Balian, Habib
Bridges
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
33348AN
Collection
Newspaper Index
Less detail

The Metro Blue Line Construction Authority is working to create a joint powers agreement to oversee the construction of the transit line extension from Pasadena to Claremont, with participation from cities along the planned route. That would include Arcadia and Monrovia.

https://arcadiahistory.andornot.com/en/permalink/newspaper30536
Newspaper
Arcadia Weekly
Date
September 5, 2002
Pages
p. 1
Newspaper
Arcadia Weekly
Date
September 5, 2002
Pages
p. 1
Subjects
Gold Line
Light Rail
Metro Blue Line Construction Authority
Trains
Transportation
Item ID
30724AN
Collection
Newspaper Index
Less detail

Metro Gold Line Construction Authority agrees to pay $24 million for a commercial property in Monrovia, to be used as a maintenance yard for the Pasadena to Azusa light rail extension. The 4.5 acres of land, on the southwest corner of Evergreen and Shamrock Avenues, is owned by George Brokate of Excalibur Holdings.

https://arcadiahistory.andornot.com/en/permalink/newspaper32831
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 11, 2012
Pages
p. A1, A4
Subjects
Brokate, George
Light rail trains
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Transportation
Item ID
33028AN
Collection
Newspaper Index
Less detail

A Metro Gold Line deal to purchase land in Monrovia for a maintenance yard for $56 million, from George Brokate, a Marine veteran from Newport Beach, has been reached. This cleared the last major obstacle to the $735 million Pasadena to Azusa Metro Gold Line Foothill Extension. Photo shows the Gold Line bridge over the 210 Freeway in Arcadia under construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper32849
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Newspaper
Pasadena Star News
Date
February 24, 2012
Pages
p. A5
Subjects
Brokate, George
Light Rail
Metro Gold Line Foothill Extension--Construction Authority
Monrovia
Trains
Transportation
Item ID
33046AN
Collection
Newspaper Index
Less detail

Gold Line measure proposed. Supporters of the Metro Gold Line Extension through San Gabriel Valley are campaigning in Sacramento this week for legislation that would help create a new Gold Line authority. The new authority would provide for a 15-member board of representatives from the so-called Phase II cities, including Arcadia and Monrovia.

https://arcadiahistory.andornot.com/en/permalink/newspaper32716
Newspaper
Arcadia Weekly
Date
September 11, 2003
Pages
p. 1, 18
Newspaper
Arcadia Weekly
Date
September 11, 2003
Pages
p. 1, 18
Subjects
Cooper, Charles
Doyle, Bart
Light rail trains
Liu, Carol
Metro Gold Line Foothill Extension
Transportation
Item ID
32913AN
Collection
Newspaper Index
Less detail

A sculptural 584-foot Metro Gold Line bridge, that will span the eastbound 210 Freeway, is under construction now. The $18.6 million bridge will be a dramatic gateway to the San Gabriel Valley. The bridge builder is Skanska USA Civil. The bridge's design concept of Native American baskets was designed by artist Andrew Leicester. The bridge should be completed in summer 2012. The bridge will have a built-in technology that can gauge damage to underground pilings after an earthquake. The entire 11.5 mile eastward Gold Line Foothill Extension through Arcadia, Monrovia, Duarte, Irwindale and Azusa is due to be finished in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper32557
Newspaper
Pasadena Star News,
Date
October 4, 2011
Pages
p. A3

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

The county Metropolitan Transportation Authority will sell naming rights to all rail lines, bus lines, and transit stations, such as the Gold Line Monrovia Station (in photo) and Foothill Gold Line Arcadia Station (in photo). The Corporate Sponsorship/Naming Rights Program was approved by the Metro board. CEO Phil Washington wants to stretch revenue; board member objects to commercialization.

https://arcadiahistory.andornot.com/en/permalink/newspaper34730
Newspaper
Pasadena Star News
Date
December 8, 2016
Pages
p. A1, A13
Newspaper
Pasadena Star News
Date
December 8, 2016
Pages
p. A1, A13
Subjects
Bonin, Mike
Kuehl, Sheila
Metro Gold Line
Metropolitan Transportation Authority
Washington, Phil
Item ID
34922AN
Collection
Newspaper Index
Less detail

The Metropolitan Transportation Authority (MTA) Board approved $10 million for the 24-mile Gold Line Foothill Extension that is going through Arcadia to Claremont. The money comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper31491
Newspaper
Pasadena Star News
Date
May 29, 2009
Pages
p. A1, A14
Newspaper
Pasadena Star News
Date
May 29, 2009
Pages
p. A1, A14
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
31686AN
Collection
Newspaper Index
Less detail

After receiving intense pressure from San Gabriel Valley lawmakers, the county's transportation board, the MTA, finally put the Gold Line extension in its long-term plans. This opens up the possibility of federal funding for the project. With this commitment, the Metropolitan Transportation Authority (MTA) has agreed to provide day-to-day operational funding for the first phase of the Gold Line Foothill extension once it is completed.

https://arcadiahistory.andornot.com/en/permalink/newspaper31763
Newspaper
Pasadena Star News
Date
October 23, 2009
Pages
p. A1, A12
Newspaper
Pasadena Star News
Date
October 23, 2009
Pages
p. A1, A12
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
31960AN
Collection
Newspaper Index
Less detail

The abandoned rail bridge over Colorado Boulevard in Arcadia will be removed because it could not accommodate the two-track light rail system and the Gold Line Construction Authority determined it was more efficient and cost effective to remove the structure than to widen it or add a second structure directly adjacent to the ole one. Bridge demolition was the first significant construction effort for Foothill Transit Constructors (FTC) and the alignment project. The Construction Authority will have three open houses in the next two weeks to update the community.

https://arcadiahistory.andornot.com/en/permalink/newspaper33080
Newspaper
Arcadia Weekly
Date
June 21, 2012
Pages
p. 10

Gold Line Extension for the phase from Azusa to Claremont is uncertain. The Metropolitan Transportation Authority (MTA) board has approved asking county voters to extend the Measure R half-cent sales tax for 30 years beyond its expiration date--without a strategy to fund the Gold Line Foothill Extension to Claremont. The Gold Line's 11.5 mile Pasadena-to-Azusa segment is already funded and scheduled for completion in 2015.

https://arcadiahistory.andornot.com/en/permalink/newspaper33078
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Newspaper
Pasadena Star News
Date
June 30, 2012
Pages
p. A1, A3
Subjects
Light rail trains
Measure R
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Transportation
Item ID
33275AN
Collection
Newspaper Index
Less detail

An eastern extension of the Metro Gold line from Pasadena to Clarement has not been funded but government leaders and residents are planning for the trains to go east. Cost of the extension may top $1 billion.

https://arcadiahistory.andornot.com/en/permalink/newspaper24786
Newspaper
Pasadena Star News
Date
December 2, 2002
Pages
p. A3
Newspaper
Pasadena Star News
Date
December 2, 2002
Pages
p. A3
Subjects
Metro Gold Line
Metrolink Trains
Item ID
24981AN
Collection
Newspaper Index
Less detail

The Gold Line Foothill Extension Construction Authority has predicted that people will get on the Pasadena-to-Azusa Gold Line extension 9,500 times a day in the year 2030.

https://arcadiahistory.andornot.com/en/permalink/newspaper30547
Newspaper
Pasadena Star News
Date
May 22, 2007
Pages
p. Local 1
Newspaper
Pasadena Star News
Date
May 22, 2007
Pages
p. Local 1
Subjects
Forecasting
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
30735AN
Collection
Newspaper Index
Less detail

2,100 cubic yards of concrete has been poured now and the 584-foot Gold Line Bridge is taking shape inside the wood forms above the eastbound lanes of the 210 Freeway.

https://arcadiahistory.andornot.com/en/permalink/newspaper33073
Newspaper
Pasadena Star News
Date
June 20, 2012
Pages
p. A3

Gold Line has a new name. Now it is called the L Line, but it will be split to become the A Line or the E Line in 2022 after Metro's Regional Connector Project is finished.

https://arcadiahistory.andornot.com/en/permalink/newspaper35752
Newspaper
Pasadena Star News
Date
April 27, 2020
Pages
p. A3
Newspaper
Pasadena Star News
Date
April 27, 2020
Pages
p. A3
Subjects
Light Rail
Metro Gold Line
Trains
Transportation
Collection
Newspaper Index
Less detail

The Metro Gold Line Foothill Extension Construction Authority opened bidding yesterday on Phase 2A of the light rail's extension toward Azusa, which would make a stop in Arcadia. The project is estimated to cost more than $450 million with a completion date in 2017. Measure R guarantees full funding for the Gold Line Extension minus a gap of $500,000. With possible help from a private investment, the completion could be moved up to 2013.

https://arcadiahistory.andornot.com/en/permalink/newspaper32161
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 1, 2010
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32358AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.