Skip header and navigation

20 records – page 1 of 1.

During construction on the Gold Line's Santa Anita Avenue bridge, In-N-Out Burger customers will be asked to line up their cars on Colorado Boulevard, instead of Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper33368
Newspaper
Pasadena Star News
Date
February 5, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 5, 2013
Pages
p. A3
Subjects
Bridges
In-N-Out Burger
Light rail trains
Metro Gold Line Foothill Extension
Item ID
33564AN
Collection
Newspaper Index
Less detail

Colorado Boulevard between Santa Anita Avenue and San Antonio Road will be closed for nearly 5 months to allow crews to build a bridge needed for Metro Gold Line Foothill Extension. The Colorado Boulevard bridge is one of three Gold Line bridges to be built on Arcadia streets. The stretch of Colorado Boulevard will be closed 24 hours/day, 7 days/week until April 30.

https://arcadiahistory.andornot.com/en/permalink/newspaper33336
Newspaper
Pasadena Star News
Date
January 9, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 9, 2013
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33532AN
Collection
Newspaper Index
Less detail

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

Santa Anita Avenue's Gold Line Bridge was dedicated Tuesday, December 1. Bridge was built by taxpayers of Arcadia, funded by Measure A. The Gold Line Grade Separation Bond Citizen Oversight Committee was on hand for the event.

https://arcadiahistory.andornot.com/en/permalink/newspaper34394
Newspaper
Arcadia Weekly
Date
December 3, 2015
Pages
p. 1
Newspaper
Arcadia Weekly
Date
December 3, 2015
Pages
p. 1
Subjects
Metro Gold Line-Foothill Extension
Light rail trains
Railroads
Transportation
Item ID
34587AN
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

New bridge over 210 Freeway taking shape at Santa Anita Avenue offramp. Skanska USA is the lead bridge contractor.

https://arcadiahistory.andornot.com/en/permalink/newspaper32835
Newspaper
Arcadia Weekly
Date
February 16, 2012
Pages
p. 1, 4
Newspaper
Arcadia Weekly
Date
February 16, 2012
Pages
p. 1, 4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Skanska USA
Item ID
33032AN
Collection
Newspaper Index
Less detail

Closure of Santa Anita Avenue today begins seven months of bridge construction in Arcadia. Crews will begin constructing a new bridge over Santa Anita Avenue at the railroad crossing in Arcadia, as part of the 11.5 mile Metro Gold Line Foothill Extension light rail project.

https://arcadiahistory.andornot.com/en/permalink/newspaper33509
Newspaper
Arcadia Weekly
Date
May 23, 2013
Pages
p. 1, 14
Newspaper
Arcadia Weekly
Date
May 23, 2013
Pages
p. 1, 14
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Santa Anita Avenue bridge
Transportation
Item ID
33704AN
Collection
Newspaper Index
Less detail

City of Arcadia discusses a costly proposal, the building of a rail bridge over the Santa Anita Avenue crossing of the Gold Line.

https://arcadiahistory.andornot.com/en/permalink/newspaper29310
Newspaper
Pasadena Star News
Date
November 20, 2004
Pages
p. A1
Newspaper
Pasadena Star News
Date
November 20, 2004
Pages
p. A1
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Santa Anita Avenue crossing
Rail bridge
Item ID
29494AN
Collection
Newspaper Index
Less detail

Gold Line bridge work to cause more closures. The construction remains on schedule and will require as many as 20 late-night full eastbound lane closures in the next two months. The final abutment, or end of the bridge, will be poured next week. The full lane closures generally occur from midnight to 5:00 AM, during which traffic will be detoured off the 210 Freeway at Baldwin Avenue and routed along Foothill Boulevard to Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32809
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 22, 2012
Pages
p. A3
Subjects
Bridges
Metro Gold Line Foothill Extension
Item ID
33006AN
Collection
Newspaper Index
Less detail

Gold Line bridge across the 210 Freeway just west of Santa Anita Avenue is underway. There is a temporary support structure across the lanes which allows trucks under 15 feet tall to pass freely. When the structure is complete, the Gold Line Construction Authority says the height allowance will be 19 feet. The $18.6 million, 584-foot Gold Line Bridge, the first component of the 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension, started last summer and expected to be completed later this year.

https://arcadiahistory.andornot.com/en/permalink/newspaper32841
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 23, 2012
Pages
p. 1
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33038AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

A team of designers and builders (photo) from Kiewit Parsons firm working on the Metro Gold Line Foothill Extension prepare to remove the existing railroad bridge on Colorado Boulevard between San Antonio Road and Santa Anita Avenue in Arcadia. That section of Colorado Boulevard may close today. The portion of Colorado Boulevard west of North Santa Anita Avenue, is scheduled to be closed from 7:00 AM to 5:00 PM weekdays through June 8, to remove the existing railroad bridge. Since the Colorado Boulevard bridge was once an old freight line bridge, it is not wide enough to accommodate light rail trains and tracks, and thus, will be demolished over the next 4 weeks.

https://arcadiahistory.andornot.com/en/permalink/newspaper32976
Newspaper
Pasadena Star News
Date
May 23, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
May 23, 2012
Pages
p. A3
Subjects
Bridges
Demolition
Kiewit Parsons
Metro Gold Line Foothill Extension
Item ID
33173AN
Collection
Newspaper Index
Less detail

Testing of Gold Line light rail cars began on Monday. It passed over the newly built bridge on Santa Anita Avenue in Arcadia. See also Arcadia Weekly, p. 1, 17, December 11, 2014.

https://arcadiahistory.andornot.com/en/permalink/newspaper34039
Newspaper
Pasadena Star News
Date
December 9, 2014
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
December 9, 2014
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34233AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

Gold Line Foothill Extension Authority officials unveiled a San Gabriel Valley-themed design for a rail bridge honoring local wildlife and native cultures. The span of the 739-foot bridge will stretch diagonally across the 210 Freeway to Santa Anita Avenue in Arcadia. It will be adorned by four basket-shaped columns and the bridge itself will have individual grooves resembling the scales of a snake. Andrew Leicester is the artist and designer.

https://arcadiahistory.andornot.com/en/permalink/newspaper31849
Newspaper
Pasadena Star News
Date
December 19, 2009
Pages
p. A1
Newspaper
Pasadena Star News
Date
December 19, 2009
Pages
p. A1
Subjects
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Public Art
Item ID
32046AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

The city council has decided to appropriate $35,000 toward the design of a light rail bridge over Santa Anita Avenue. This is to pay for early design work needed for an environmental impact report. The bridge project is expected to cost the city $10.7 million which may come from a bond. The Construction Authority would pay $18.4 million bringing total bridge cost to $29.1 million.

https://arcadiahistory.andornot.com/en/permalink/newspaper29512
Newspaper
Pasadena Star News
Date
May 5, 2005
Pages
p. A3

The proposed site for Arcadia's Gold Line station is just east of Santa Anita Avenue, at the First Avenue/Santa Clara intersection. City leaders want to separate the railroad tracks from the street.

https://arcadiahistory.andornot.com/en/permalink/newspaper28351
Newspaper
Pasadena Star News
Date
May 19, 2004
Pages
p. A3
Newspaper
Pasadena Star News
Date
May 19, 2004
Pages
p. A3
Subjects
Gold Line --Pasadena to Montclair
Light rail trains
Metro Gold Line Foothill Extension
Item ID
28548AN
Collection
Newspaper Index
Less detail

Construction of the Metro Gold Line Foothill Extension bridge, that will span the 210 Freeway, has begun. Preparation of the giant column supports included drilling over 100 feet into the ground. The 584-foot Gold Line bridge will take shape by December. It replaces an old railroad bridge across the freeway, which was built about 1969 and torn down in 1997, said Gary Baker, director of construction for the Metro Gold Line Foothill Extension Construction Authority. The bridge's design has been controversial, as some say it is not representative of the origins of the area. The entire bridge is slated to be finished summer 2012.

https://arcadiahistory.andornot.com/en/permalink/newspaper32566
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Newspaper
Arcadia Weekly
Date
October 6, 2011
Pages
p. 1, 3
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
32765AN
Collection
Newspaper Index
Less detail

The abandoned rail bridge over Colorado Boulevard in Arcadia will be removed because it could not accommodate the two-track light rail system and the Gold Line Construction Authority determined it was more efficient and cost effective to remove the structure than to widen it or add a second structure directly adjacent to the ole one. Bridge demolition was the first significant construction effort for Foothill Transit Constructors (FTC) and the alignment project. The Construction Authority will have three open houses in the next two weeks to update the community.

https://arcadiahistory.andornot.com/en/permalink/newspaper33080
Newspaper
Arcadia Weekly
Date
June 21, 2012
Pages
p. 10

20 records – page 1 of 1.