Skip header and navigation

20 records – page 1 of 1.

Colorado Boulevard between Santa Anita Avenue and San Antonio Road will be closed for nearly 5 months to allow crews to build a bridge needed for Metro Gold Line Foothill Extension. The Colorado Boulevard bridge is one of three Gold Line bridges to be built on Arcadia streets. The stretch of Colorado Boulevard will be closed 24 hours/day, 7 days/week until April 30.

https://arcadiahistory.andornot.com/en/permalink/newspaper33336
Newspaper
Pasadena Star News
Date
January 9, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 9, 2013
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33532AN
Collection
Newspaper Index
Less detail

Gold Line construction moving forward on schedule. First Avenue in Arcadia to open by the end of March. See hard copy VF "Railroads-Light Rail-Metro Gold Line."

https://arcadiahistory.andornot.com/en/permalink/newspaper33776
Newspaper
Arcadia Weekly
Date
March 13, 2014
Pages
p. 1, 6
Newspaper
Arcadia Weekly
Date
March 13, 2014
Pages
p. 1, 6
Subjects
Gold Line
Light Rail
Trains
Transportation
Item ID
33971AN
Collection
Newspaper Index
Less detail

The abandoned rail bridge over Colorado Boulevard in Arcadia will be removed because it could not accommodate the two-track light rail system and the Gold Line Construction Authority determined it was more efficient and cost effective to remove the structure than to widen it or add a second structure directly adjacent to the ole one. Bridge demolition was the first significant construction effort for Foothill Transit Constructors (FTC) and the alignment project. The Construction Authority will have three open houses in the next two weeks to update the community.

https://arcadiahistory.andornot.com/en/permalink/newspaper33080
Newspaper
Arcadia Weekly
Date
June 21, 2012
Pages
p. 10

Closures of southbound Baldwin Avenue in Arcadia starting July 6 for approximately 2 weeks. Crews will be installing underground duct banks and electrical vaults as part of the 11.5 mile Metro Gold Line Foothill Extension Light Rail project.

https://arcadiahistory.andornot.com/en/permalink/newspaper33882
Newspaper
Arcadia Weekly
Date
July 3, 2014
Pages
p. 24
Newspaper
Arcadia Weekly
Date
July 3, 2014
Pages
p. 24
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
34076AN
Collection
Newspaper Index
Less detail

Railroads-Light Rail (Metro Gold Line, L-Line, Blue Line, A-Line)

https://arcadiahistory.andornot.com/en/permalink/subject291
Contents
Original name of the light rail was the Gold Line. Later, Gold Line was temporarily renamed L-Line and officially renamed A-Line aka Blue Line effective June 16, 2023. 1. Metro Gold Line Foothill Extension, Winter 2011. A 2-sided information flyer including quick facts, project funding, constructio…
Contents
Original name of the light rail was the Gold Line. Later, Gold Line was temporarily renamed L-Line and officially renamed A-Line aka Blue Line effective June 16, 2023.
1. Metro Gold Line Foothill Extension, Winter 2011. A 2-sided information flyer including quick facts, project funding, construction authority background that accompanied a model of the Metro Gold Line on display at the library starting in early 2011.
2. Metro Gold Line Extension information in a supplement called "Civic Leadership" in the Pasadena Star News, January 31, 2011. "Once the environmental process is completed in 2012, the project will be ready for funding at the local and federal levels. Metro has made funding the Foothill Extension from Azusa to Montclair a priority project for the agency.
3. Memo from Jason Kruckeberg, Asst. City Manager / Development Services Director and Phil Wray, Deputy Director of Development Services/City Engineer to Mayor and City Council re: Discussion of Gold Line Project Status-City's Commitments and Progress Review. August 16, 2011.
4. Artist renderings of future Arcadia Station and I-210 Gold Line Bridge (to resemble weaved baskets).
5. Introducing six new stations in five cities--Arcadia, Monrovia, Duarte, Irwindale, Azusa-Alameda and Azusa-Citrus. Construction completion on track for 2015. Habib F. Balian, CEO of Metro Gold Line Foothill Extension Construction Authority is pictured. An award winning team of contractors and engineers include Skanska, Hill International, Jacobs, Patterson & Associates, Inc.
6. Staff report from Jason Kruckeberg to Mayor and City Council, April 3, 2012 re: report, discussion and direction regarding Gold Line parking structure and transit plaza, with drawings.
7. Three train bridges, station coming. Mountain Views News, p. 6, February 16, 2013.
8. Foothill Gold Line extension updates. Arcadia Weekly, p. 8, February 21, 2013. Updates on design work, demolition, station locations.
9. Santa Anita Bridge groundbreaking.Mountain Views News, p. 7, April 20, 2013.
10. Gold Line construction extends closure of Colorado Boulevard, Pasadena Star News, p. A3, May 4, 2013.
11. Gold Line bridge project to conclude on Colorado Boulevard. Nearly five months of construction ends, but heavy work to begin on Santa Anita Avenue. Pasadena Star News, p. A10. May 29, 2013.
12. Gold Line construction moving forward. First Avenue in Arcadia to open by the end of March. Arcadia Weekly, March 13, 2014.
13. Gold Line station art revealed, April 29, 2014. Retrieved from http://arcadiachamber.org on May 1, 2014.
14. Foothill Gold Line Pasadena to Azusa Update. Construction (bridges, at-grade crossings) continues on time and on budget for a September 2015 turn-over to Metro. Mountain Views News, Section B-p. 1, June 6, 2014.
15. Downtown Arcadia intersection at Huntington and Second will be closed for Gold Line construction, August 6, 2014. Retrieved from www.pasadenastarnews.com on August 11, 2014.
16. Chamber's key role in Gold Line station by Scott Hettrick, August 24, 2015. Retrieved from ArcadiaCAChamber.org on August 25, 2015.
17. Foothill Gold Line Newsletter. Third quarter 2014, with construction update and inserts about Arcadia Station (station artist Michael Davis) and Who Knew Building a Light Rail Track Could Be So Interesting?
18. A-C. 18A. City of Arcadia Holiday Tree Lighting and Dedication December 5, 2015 at Arcadia Transit Plaza. 18B. Arcadia Transit Plaza Dedication Ceremony November 6, 2014. 18C. Arcadia's Grand Opening Celebrationg. Gold Line is coming to Arcadia Saturday, March 5, 2016-Ribbon cutting and station celebration (2 copies).
19. Metro to offer free rides on new Gold Line extension March 5: community events planned at five stations. Arcadia Station at 201 N. First Avenue. Arcadia Weekly, February 25, 2016.
20. Gold Line extension unlikely to affect big traffic jams: history shows trains won't impact freeways. Pasadena Star News, March 2, 2016.
21.Two articles. Where the gold train takes you. Riding the new Gold Line Foothill Extension? Check out 21 activities, local attractions. Art at new Gold Line stations tells cities' stories. Pasadena Star News, March 1, 2016.
22. Opening Day of Metro Gold Line Arcadia Station marketing items: Metro Map & Pocket Guide; Metro Rider's Guide; Arcadia Shop dine stay enjoy coupon book; What is Tap? Instructional Coloring Book; Celebrate the grand opening March 5, 2016 flyer; Heads up watch for trains perforated train model of Kinkisharyo P3010.
23. The ABCs of the Gold Line. Arcadia Weekly, March 3, 2016.
24. All aboard! Metro's Gold Line comes a long way to connect Pasadena to Azusa on Saturday. Pasadena Weekly, March 3, 2016.
25. City of Arcadia celebrates opening of the Gold Line Extension. Arcadia Transit introduces new shuttle service in conjunction with Metro Gold Line opening. Mountain Views News, February 27, 2016.
26. Gold Line fuels nearby projects: extension generating money for area cities. Pasadena Star News, p. A1, A5, February 29, 2016.
27. Wheels: Go east young man: Gold Line opening ceremony prompts historic musings on the Atchison, Topeka and the Santa Fe. Pasadena Weekly, p. 14, March 3, 2016. By Lauren Holland.
28. L Line (Gold) Metro Rail Schedule, Metro Rail Azusa-Union Station-East LA, effective April 9, 2023.
29. A-B. 29A. June 2023 map of all Metro rail lines, Metro busway routes, regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). 29B. A Line Metro Rail schedule effective June 16, 2023 on two sheets. Includes map, connections and parking.
30. A-D. 30A. Meet the Line Letters - Nuevos Nombres. Folded map of Metro Rail & Busway. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Explanations in English and Spanish. Dated October 2022. 30B. Metro rail is growing! Brochure explaining changes in names, stations, and routes when Metro completes the Regional Connector Transit Project on June 16, 2023. Includes map. In English and Spanish. 30C. Meet the new lineup = Conozca nuestra neva alineacion. Folded map of Metro Rail and Busway routes. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Explanations In English and Spanish. Dated June 2023. 30D. Go Metro map & pocket guide. Folded map of Metro Rail & Busway. Shows all Metro Rail lines, Metro Busway routes, Regional rail (Amtrak and Metrolink) and airport transportation (airport shuttle, LAX FlyAway and LAX shuttle). Includes information on fares, hours, and important contacts. Dated August 2023.
Subjects
Railroads-Light Rail-Metro Gold Line
Railroads-Light Rail-L Line
Railroads-Light Rail-Blue Line
Railroads-Light Rail-A Line
Item ID
293AF
Collection
Subject Files
Less detail

During construction on the Gold Line's Santa Anita Avenue bridge, In-N-Out Burger customers will be asked to line up their cars on Colorado Boulevard, instead of Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper33368
Newspaper
Pasadena Star News
Date
February 5, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 5, 2013
Pages
p. A3
Subjects
Bridges
In-N-Out Burger
Light rail trains
Metro Gold Line Foothill Extension
Item ID
33564AN
Collection
Newspaper Index
Less detail

Gold Line extension may be contributing factor in Arcadia homeless population. Arcadia is seeing a drastic increase in homeless compared to recent years, specifically in Downtown Arcadia and Arcadia County Park, largely due to the Gold Line light rail extension that opened in early 2016 with a stop in Arcadia. Arcadia Police Department has seen a 46% increase in transient calls to deal with in 2017, compared to 2016.

https://arcadiahistory.andornot.com/en/permalink/newspaper35074
Newspaper
Arcadia Weekly
Date
January 25, 2018
Pages
p. 1, 7
Newspaper
Arcadia Weekly
Date
January 25, 2018
Pages
p. 1, 7
Subjects
Homeless people
Homelessness
Light rail trains
Metro Gold Line
Item ID
35263AN
Collection
Newspaper Index
Less detail

Testing of Gold Line light rail cars began on Monday. It passed over the newly built bridge on Santa Anita Avenue in Arcadia. See also Arcadia Weekly, p. 1, 17, December 11, 2014.

https://arcadiahistory.andornot.com/en/permalink/newspaper34039
Newspaper
Pasadena Star News
Date
December 9, 2014
Pages
p. A1, A7
Newspaper
Pasadena Star News
Date
December 9, 2014
Pages
p. A1, A7
Subjects
Light rail trains
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34233AN
Collection
Newspaper Index
Less detail

Lack of train cars may delay the openings of the Expo Line Phase 2 from Culver City to Santa Monica and the Gold Line Foothill Extension from Pasadena to Azusa. Metro reports delivery of rail cars won't be complete until January 2017, while construction of the extensions should be done July/August (Expo) and late September (Gold Line), of 2015. The builder of the train cars is Kinkisharyo International, a Japanese company that is assembling the light rail trains in Palmdale, California. The Expo Line needs 42 cars and the Gold Line needs 15.

https://arcadiahistory.andornot.com/en/permalink/newspaper34025
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Newspaper
Pasadena Star News
Date
November 4, 2014
Pages
p. A1, A6
Subjects
Balian, Habib
Kinkisharyo International
Light rail trains
Metro Gold Line Foothill Extension
Item ID
34219AN
Collection
Newspaper Index
Less detail

A team of designers and builders (photo) from Kiewit Parsons firm working on the Metro Gold Line Foothill Extension prepare to remove the existing railroad bridge on Colorado Boulevard between San Antonio Road and Santa Anita Avenue in Arcadia. That section of Colorado Boulevard may close today. The portion of Colorado Boulevard west of North Santa Anita Avenue, is scheduled to be closed from 7:00 AM to 5:00 PM weekdays through June 8, to remove the existing railroad bridge. Since the Colorado Boulevard bridge was once an old freight line bridge, it is not wide enough to accommodate light rail trains and tracks, and thus, will be demolished over the next 4 weeks.

https://arcadiahistory.andornot.com/en/permalink/newspaper32976
Newspaper
Pasadena Star News
Date
May 23, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
May 23, 2012
Pages
p. A3
Subjects
Bridges
Demolition
Kiewit Parsons
Metro Gold Line Foothill Extension
Item ID
33173AN
Collection
Newspaper Index
Less detail

Closure of Santa Anita Avenue today begins seven months of bridge construction in Arcadia. Crews will begin constructing a new bridge over Santa Anita Avenue at the railroad crossing in Arcadia, as part of the 11.5 mile Metro Gold Line Foothill Extension light rail project.

https://arcadiahistory.andornot.com/en/permalink/newspaper33509
Newspaper
Arcadia Weekly
Date
May 23, 2013
Pages
p. 1, 14
Newspaper
Arcadia Weekly
Date
May 23, 2013
Pages
p. 1, 14
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Santa Anita Avenue bridge
Transportation
Item ID
33704AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work on track; more eastbound 210 Freeway closures ahead. Motorists can expect up to 14 more full-lane, night closures in the coming weeks as workers complete a temporary structure needed to support the $18.6 million Gold Line Bridge. The bridge is expected to be completed next summer.

https://arcadiahistory.andornot.com/en/permalink/newspaper32833
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Newspaper
Pasadena Star News
Date
February 18, 2012
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33030AN
Collection
Newspaper Index
Less detail

Work continues on Metro Gold Line Foothill Extension project. Workers installed a 130-foot-high steel cage that will make up a portion of a rapid transit bridge spanning the eastbound 210 Freeway between Baldwin Avenue and Santa Anita Avenue. When complete, the 584-foot-long, $18.6 million Metro Gold Line bridge will be buttressed by columns designed to resemble Native American baskets. The bridge work is expected to be completed in the summer of 2012, while the entire 11.5-mile extension is due to be finished 2015. The bridge contractor is Skanska USA Civil. Construction of the rest of the line may be delayed due to problems with Monrovia's Redevelopment Agency.

https://arcadiahistory.andornot.com/en/permalink/newspaper32527
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 15, 2011
Pages
p. A1, A4
Subjects
Bridges
Construction
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
32726AN
Collection
Newspaper Index
Less detail

Four day full closure of Huntington Drive and Second Avenue intersection in Arcadia begins Friday, August 8, for Gold Line Foothill Extension light rail construction.

https://arcadiahistory.andornot.com/en/permalink/newspaper33970
Newspaper
Arcadia Weekly
Date
August 7, 2014
Pages
p. 1, 10
Newspaper
Arcadia Weekly
Date
August 7, 2014
Pages
p. 1, 10
Subjects
Light Rail
Metro Gold Line Foothill Extension
Railroads
Trains
Transportation
Item ID
34164AN
Collection
Newspaper Index
Less detail

Metro Gold Line Foothill Extension Construction Authority announced that structural work is complete for Gold Line Bridge over Interstate 210 Freeway. "The bridge can now stand on its own," said Construction Authority CEO Habib F. Balian. The bridge is a 584-linear foot, $18.6 million rail bridge that helps extend the Gold Line from Pasadena to Azusa, in this first segment.

https://arcadiahistory.andornot.com/en/permalink/newspaper33151
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Newspaper
Arcadia Weekly
Date
September 6, 2012
Pages
p. 9
Subjects
Balian, Habib
Bridges
Light rail trains
Metro Gold Line Foothill Extension Construction Authority
Transportation
Item ID
33348AN
Collection
Newspaper Index
Less detail

Trainspotting in Arcadia. First tests of Gold Line light rail between Pasadena and Azusa start. Metro Gold Line Foothill Extension conducted the first of many clearance tests involving actual Metro Gold Line train from Sierra Madre Villa Station (in Pasadena) to Azusa. The train was a $4 million Ansaldo Breda P2250 with specialized gear to test clearances, wheel/rail interface, rail switches, and Overhead Catenary System.

https://arcadiahistory.andornot.com/en/permalink/newspaper34040
Newspaper
Arcadia Weekly
Date
December 11, 2014
Pages
p. 1, 17
Newspaper
Arcadia Weekly
Date
December 11, 2014
Pages
p. 1, 17
Subjects
Light rail trains
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34234AN
Collection
Newspaper Index
Less detail

City of Arcadia discusses a costly proposal, the building of a rail bridge over the Santa Anita Avenue crossing of the Gold Line.

https://arcadiahistory.andornot.com/en/permalink/newspaper29310
Newspaper
Pasadena Star News
Date
November 20, 2004
Pages
p. A1
Newspaper
Pasadena Star News
Date
November 20, 2004
Pages
p. A1
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Santa Anita Avenue crossing
Rail bridge
Item ID
29494AN
Collection
Newspaper Index
Less detail

Gold Line bridge construction work will cause up to 20 nights of complete closures on the 210 Freeway in the next two months. The freeway bridge is the first part of the $735 million, 11.5 mile Pasadena to Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper32828
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 9, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33025AN
Collection
Newspaper Index
Less detail

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

Foothill Gold Line construction update. The Gold Line light rail from Pasadena to Azusa has now surpassed 85% complete. Overview of bridge construction, track completion, grade crossings, and train testing. Substantial completion of entire project remains on schedule for late September 2015, when the project as a whole will be turned over to Metro for pre-revenue service. Metro will decide when the line will open for passenger service.

https://arcadiahistory.andornot.com/en/permalink/newspaper34152
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Newspaper
Mountain Views News
Date
April 11, 2015
Pages
p. 6
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
34346AN
Collection
Newspaper Index
Less detail

20 records – page 1 of 1.