Skip header and navigation

78 records – page 1 of 4.

2,100 cubic yards of concrete has been poured now and the 584-foot Gold Line Bridge is taking shape inside the wood forms above the eastbound lanes of the 210 Freeway.

https://arcadiahistory.andornot.com/en/permalink/newspaper33073
Newspaper
Pasadena Star News
Date
June 20, 2012
Pages
p. A3

The 11.5 mile light rail Gold Line extension from Pasadena to Azusa was awarded to Foothill Transit Constructors. Kiewit-Parsons, a joint venture company, will design and build the project. Funding comes from Measure R.

https://arcadiahistory.andornot.com/en/permalink/newspaper32468
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
July 28, 2011
Pages
p. A1, A4
Subjects
Contractors
Light rail trains
Metro Gold Line Foothill Extension
Metropolitan Transportation Authority (MTA)
Item ID
32667AN
Collection
Newspaper Index
Less detail

The abandoned rail bridge over Colorado Boulevard in Arcadia will be removed because it could not accommodate the two-track light rail system and the Gold Line Construction Authority determined it was more efficient and cost effective to remove the structure than to widen it or add a second structure directly adjacent to the ole one. Bridge demolition was the first significant construction effort for Foothill Transit Constructors (FTC) and the alignment project. The Construction Authority will have three open houses in the next two weeks to update the community.

https://arcadiahistory.andornot.com/en/permalink/newspaper33080
Newspaper
Arcadia Weekly
Date
June 21, 2012
Pages
p. 10

Alan Weeks, a retiree who rode the last Pacific Electric Red Car that went through this area in 1951, visits the Arcadia Gold Line Station at North First Avenue and Santa Clara Street.

https://arcadiahistory.andornot.com/en/permalink/newspaper34453
Newspaper
Pasadena Star News
Date
February 11, 2016
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
February 11, 2016
Pages
p. A1, A4
Subjects
Light rail trains
Metro Gold Line
Pacific Electric Red Car (electric trolley)
Railroads--History
Transportation
Weeks, Alan
Item ID
34645AN
Collection
Newspaper Index
Less detail

All 14 at-grade rail crossings now complete for Foothill Gold Line, from Pasadena to Azusa. The at-grade crossing in Arcadia is at First Avenue and Santa Clara Street.

https://arcadiahistory.andornot.com/en/permalink/newspaper34011
Newspaper
Arcadia Weekly
Date
October 30, 2014
Pages
p. 12
Newspaper
Arcadia Weekly
Date
October 30, 2014
Pages
p. 12
Subjects
Light rail trains
Metro Gold Line-Foothill Extension
Railroads
Transportation
Item ID
34205AN
Collection
Newspaper Index
Less detail

All aboard: Arcadia gets into training. The Metro Gold Line Station in Arcadia will have a grand opening on Saturday, March 5. The light rail Foothill Extension from Pasadena to Azusa will be offering free rides on March 5.

https://arcadiahistory.andornot.com/en/permalink/newspaper34475
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Newspaper
Arcadia Weekly
Date
February 25, 2016
Pages
p. 1
Subjects
Arcadia Station (Gold Line)
Light rail trains
Mass transit
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34667AN
Collection
Newspaper Index
Less detail

All aboard: Gold Line extension opened yesterday with free rides, and nearly 30,000 people jammed into the 6 new stations from Arcadia to Azusa. Photos of the grand opening.

https://arcadiahistory.andornot.com/en/permalink/newspaper34491
Newspaper
Pasadena Star News
Date
March 6, 2016
Pages
p. A1, A10
Newspaper
Pasadena Star News
Date
March 6, 2016
Pages
p. A1, A10
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Railroads
Transportation
Item ID
34683AN
Collection
Newspaper Index
Less detail

Arcadia commuters fed up with gridlock at First Avenue at the Gold Line Station, since trains started running through Arcadia in March 2016. City engineers are aware of the problems and public's frustration and looking at ways to improve the signals and wait times.

https://arcadiahistory.andornot.com/en/permalink/newspaper35257
Newspaper
Arcadia Weekly
Date
August 23, 2018
Pages
p. 1, 11
Newspaper
Arcadia Weekly
Date
August 23, 2018
Pages
p. 1, 11
Subjects
Light rail trains
Metro Gold Line
Traffic
Transit
Transportation
Item ID
35446AN
Collection
Newspaper Index
Less detail

Arcadia Transit Plaza dedication ceremony held November 6, 2014. It is located at 99 Santa Clara Street, at First Avenue, where the Gold Line Station in Arcadia is being built. It will serve as a transportation hub and a gathering space for the community. Many VIPs attended (photos).

https://arcadiahistory.andornot.com/en/permalink/newspaper34015
Newspaper
Arcadia Weekly
Date
November 13, 2014
Pages
p. 7

Arcadia Transit Plaza ready to welcome light rail travelers to Arcadia. Photo and article by Terry Miller. See also page 7.

https://arcadiahistory.andornot.com/en/permalink/newspaper34016
Newspaper
Arcadia Weekly
Date
November 13, 2014
Pages
p. 14
Newspaper
Arcadia Weekly
Date
November 13, 2014
Pages
p. 14
Subjects
Arcadia Transit Plaza
Light rail trains
Miller, Terry
Metro Gold Line Foothill Extension--Arcadia Station
Transportation
Item ID
34210AN
Collection
Newspaper Index
Less detail

Arcadia wrestles with homeless issue. Metro Gold Line is seen as factor by some in the growing numbers camping nearby. In 2016, the Arcadia Station of Metro Gold Line opened and police began seeing a marked increase in calls for service regarding homelessness, said Sergeant Dan Crowther.

https://arcadiahistory.andornot.com/en/permalink/newspaper35544
Newspaper
Pasadena Star News
Date
August 29, 2019
Pages
p. A1, A5
Newspaper
Pasadena Star News
Date
August 29, 2019
Pages
p. A1, A5
Subjects
Arcadia Station
Homeless
Light rail trains
Metro Gold Line
Social problems
Collection
Newspaper Index
Less detail

Changes for Arcadia Transit's Dial-a-Ride. The new two-tiered system reserves the Dial-a-Ride for senior citizens and the disabled, while three new fixed routes will serve the general public. Includes history of Dial-a-Ride in Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper34596
Newspaper
Arcadia Weekly
Date
June 16, 2016
Pages
p. 1, 16
Newspaper
Arcadia Weekly
Date
June 16, 2016
Pages
p. 1, 16
Subjects
Arcadia Transit--Dial-a-Ride
Buses
Hui, Linda
Marshall, Gail
Metro Gold Line
Public transportation
Shuttles
Item ID
34788AN
Collection
Newspaper Index
Less detail

The changing face of Arcadia: from Super Chief to Gold Line. Major construction for the Gold Line and demolition of one block of old shops on Santa Anita Avenue to make way for Rusnak Mercedes Benz's expansion and showroom are the projects changing the appearance of Arcadia. Businessman George Fasching says in the late 1930s to the 1950s, Hollywood industry people used the "Super Chief," a Santa Fe Railway train, as their main mode of travel between New York and Los Angeles, and it used to pass through Arcadia.

https://arcadiahistory.andornot.com/en/permalink/newspaper33589
Newspaper
Arcadia Weekly
Date
August 15, 2013
Pages
p. 1, 15
Newspaper
Arcadia Weekly
Date
August 15, 2013
Pages
p. 1, 15
Subjects
Fasching's Car Wash
Light rail trains
Miller, Terry
Railroads
Rusnak Mercedes Benz
Santa Fe Railway
Metro Gold Line
Transportation
Item ID
33784AN
Collection
Newspaper Index
Less detail

Closure of Santa Anita Avenue today begins seven months of bridge construction in Arcadia. Crews will begin constructing a new bridge over Santa Anita Avenue at the railroad crossing in Arcadia, as part of the 11.5 mile Metro Gold Line Foothill Extension light rail project.

https://arcadiahistory.andornot.com/en/permalink/newspaper33509
Newspaper
Arcadia Weekly
Date
May 23, 2013
Pages
p. 1, 14
Newspaper
Arcadia Weekly
Date
May 23, 2013
Pages
p. 1, 14
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Santa Anita Avenue bridge
Transportation
Item ID
33704AN
Collection
Newspaper Index
Less detail

Closures of southbound Baldwin Avenue in Arcadia starting July 6 for approximately 2 weeks. Crews will be installing underground duct banks and electrical vaults as part of the 11.5 mile Metro Gold Line Foothill Extension Light Rail project.

https://arcadiahistory.andornot.com/en/permalink/newspaper33882
Newspaper
Arcadia Weekly
Date
July 3, 2014
Pages
p. 24
Newspaper
Arcadia Weekly
Date
July 3, 2014
Pages
p. 24
Subjects
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
34076AN
Collection
Newspaper Index
Less detail

Colorado Boulevard between Santa Anita Avenue and San Antonio Road will be closed for nearly 5 months to allow crews to build a bridge needed for Metro Gold Line Foothill Extension. The Colorado Boulevard bridge is one of three Gold Line bridges to be built on Arcadia streets. The stretch of Colorado Boulevard will be closed 24 hours/day, 7 days/week until April 30.

https://arcadiahistory.andornot.com/en/permalink/newspaper33336
Newspaper
Pasadena Star News
Date
January 9, 2013
Pages
p. A3
Newspaper
Pasadena Star News
Date
January 9, 2013
Pages
p. A3
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33532AN
Collection
Newspaper Index
Less detail

Completion of the Gold Line Bridge over the 210 Foothill Freeway in Arcadia is celebrated. The $18.6 million bridge, completed on time and on budget, is only one element of the $1.2 billion eastward extension of the Gold Line through Arcadia, Monrovia, Duarte, Irwindale, and Azusa. Andrew Leicester is the artist and designer of the bridge baskets.

https://arcadiahistory.andornot.com/en/permalink/newspaper33270
Newspaper
Arcadia Weekly
Date
December 13, 2012
Pages
p. 1, 18
Newspaper
Arcadia Weekly
Date
December 13, 2012
Pages
p. 1, 18
Subjects
Balian, Habib
Bridges
Leicester, Andrew
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33467AN
Collection
Newspaper Index
Less detail

Construction of 210 Freeway Gold Line bridge near Santa Anita Avenue in Arcadia, is nearing completion. Work should be complete in 3 months. Nighttime closures of the freeway will cause delays. The bridge will allow connection between Pasadena's Sierra Madre Villa Station and the future Arcadia Station. It is the first piece of the $735 million, 11.5 mile Pasadena-to-Azusa Metro Gold Line Foothill Extension.

https://arcadiahistory.andornot.com/en/permalink/newspaper33157
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
September 17, 2012
Pages
p. A1, A4
Subjects
Bridges
Light rail trains
Metro Gold Line Foothill Extension
Transportation
Item ID
33354AN
Collection
Newspaper Index
Less detail

Construction of the Gold Line Bridge in Arcadia, over the 210 Freeway, will cause eight more full overnight eastbound lane closures through March 17, between Rosemead Boulevard and Santa Anita Avenue.

https://arcadiahistory.andornot.com/en/permalink/newspaper32850
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Newspaper
Pasadena Star News
Date
March 6, 2012
Pages
p. A1, A4
Subjects
Bridges
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
33047AN
Collection
Newspaper Index
Less detail

Construction of the Gold Line Foothill Extension will create nearly 7000 new jobs and pump nearly $1 billion into the region's economy, according to a new study of the project.

https://arcadiahistory.andornot.com/en/permalink/newspaper31868
Newspaper
Pasadena Star News
Date
January 13, 2010
Pages
p. A1
Newspaper
Pasadena Star News
Date
January 13, 2010
Pages
p. A1
Subjects
Jobs
Light Rail
Metro Gold Line Foothill Extension
Trains
Transportation
Item ID
32065AN
Collection
Newspaper Index
Less detail

78 records – page 1 of 4.